Loading...
Grandview Avenue and Loras Boulevard Traffic Signal Reconstruction Project Award Copyrighted August 7, 2017 City of Dubuque Action Items # 4. ITEM TITLE: Grandview Avenue and Loras Boulevard Traffic Signal Reconstruction Project Award SUMMARY: City Manager recommending award of the Grandview Avenue and Loras Boulevard Traffic Signal Reconstruction Project construction contract to the low bidder Portzen Construction. RESOLUTION Awarding public improvement contract for the Grandview Avenue and Loras Boulevard Intersection Improvement Project SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type Grandview& Loras Intersection Improvement Project- City Manager Memo MVM Memo Staff Memo Staff Memo Resolution Resolutions Bid Tab Supporting Documentation THE COF Dubuque DtUB E All-America City Masterpiece on the Mississippi 1 1 1 1" 2009•2012•2013•2019 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Grandview Avenue & Loras Boulevard Intersection Improvement Project DATE: August 1, 2017 Sealed bids were received for the Grandview Avenue & Loras Boulevard Intersection Improvement Project. City Engineer Gus Psihoyos recommends award of the construction contract to the low bidder, Portzen Construction, in the amount of $328,276.28, which is 6.94% over the estimate of probable cost. Sufficient resources have been identified to fund the project, including a $259,357.04 Traffic Safety Grant from the Iowa Department of Transportation. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE COF DUB�que DtUB E �► �Y I I. Masterpiece on the Mississippi 20p7.2012.2013 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer <- " �N_ DATE: July 26, 2017 RE: Grandview Avenue & Loras Boulevard Intersection Improvement Project INTRODUCTION The enclosed resolution authorizes the award of the construction contract for the Grandview Avenue & Loras Boulevard Intersection Improvement Project. BACKGROUND The project location is along Grandview Avenue at Loras Boulevard. Loras is currently signalized, but the signals are in deteriorated condition. The existing conduits are impassable and vehicle detection has not worked for many years turning the signal essentially into a "pretimed" signal. There are also no left turn signals for Grandview Avenue traveling North or South. This intersection is adjacent to Allison- Henderson Memorial Park which sees heavier pedestrian movements and the existing signals do not have pedestrian signal heads. This project will reconstruct the signal at Loras and Grandview. All signal legs of the intersection will have dedicated left turn movements along with countdown pedestrian signals. This project will complement the future Grandview Avenue-University Avenue Roundabout and the current Delhi-Grandview Roundabout. The traffic signal will utilize advanced detection capability to help maintain traffic progression on the north-south traffic movements. The traffic signals will be connected by fiber optics which will go into the Traffic Operations Center at City Hall for remote monitoring and adjustments. These proposed improvements were recommended by the East/West Corridor Study that was formally adopted by the City Council at the February 20, 2012 City Council meeting. A supplemental Traffic Safety grant has been approved by the Iowa DOT in the amount of $259,357.04. DISCUSSION The project provides for the reconstruction of the traffic signals at North Grandview and Loras Boulevard. This intersection will include new traffic signals with mastarms for improved visibility of the traffic signals, ADA pedestrian access ramps, related sidewalk replacement and pavement work. Additionally, a fire hydrant will be installed on Loras Boulevard. The Loras Boulevard intersection pavement will be replaced as part of this project due to the badly deteriorated pavement. 1 Construction of this project is being phased to minimize impacts to the traffic on North Grandview Avenue. Traffic on North Grandview Avenue will be maintained through the intersection during construction as much as possible. BID RESULTS The City of Dubuque received the following bids for the Grandview Avenue & Loras Boulevard Intersection Improvement Project, on July 20, 2017. Contractor Bid Results Portzen Construction $ 328,276.28 Eastern Iowa Excavating & Concrete, LLC $ 369,889.89 Tschiggfrie Excavating $ 426,949.40 Horsfield Construction, Inc. $ 434,416.10 Portzen Construction of Dubuque, Iowa, submitted the low bid in the amount of $328,276.28. This amount is 6.94% over the estimate of probable cost. Most of the added cost is in fiber optic and traffic signal conduit. RECOMMENDATION I recommend that the contract for the Grandview Avenue & Loras Boulevard Intersection Improvement Project be awarded to Portzen Construction of Dubuque, Iowa in the amount of$328,276.28. BUDGETIMPACT The summary of cost for Grandview Avenue & Loras Boulevard Intersection Improvement Project is as follows: Estimate Award Construction Contract $ 306,965.40 $328,276.28 Contingency 30,696.54 $ 30,696.54 Engineering Design, Administration & Inspection 50,649.29 50,649.29 Total Project Cost $ 388,311.23 $,_409.622.11 The project funding summary is as follows: CIP No. Fund Description Fund Amount 3001133 Traffic Signal Mastarm Replacement $ 55,704.92 3001615 Signal Intersection Reconstruction 50,000.00 7402705 Grandview-Loras Intersection improvements 14,560.15 3001425 Sidewalk Program — City Owned 30,000.00 Iowa DOT Traffic Safety Improvement Grant 259,357.04 Total Project Funding $409,622.11 2 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the construction contract for the Grandview Avenue & Loras Boulevard Intersection Improvement Project to Portzen Construction in the amount of$328,276.28. Prepared By Jon Dienst, P.E. cc: Bob Schiesl, Asst City Engineer Dave Ness, Civil Engineer II Duane Richter, Civil Engineer I John Klostermann, Public Works Director Denise Ihrig, Water Department Manager 3 RESOLUTION NO. 284-17 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE GRANDVIEW AVENUE & LORAS BOULEVARD INTERSECTION IMPROVEMENT PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Whereas, sealed proposals have been submitted by contractors for the Grandview Avenue & Loras Boulevard Intersection Improvement Project, (the Project) pursuant to Resolution No. 263-17 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 23rd day of June,2017. Whereas, said sealed proposals were opened and read on the 20th day of July,2017 and it has been determined that Portzen Construction of Dubuque, Iowa, with a bid in the amount of $328,276.28 is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Portzen Construction and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, adopted and approved this 7th day of August,2017. toy D. Buol, Mayor Attest: Kevin S. Firnstahi, City Clerk MssN%vm tlr Mis¢gry' SIR INPI.N, vmym x4408. x.ovulum Mvvove I ievseciiox eio PER o[sceiviiox LEI El 4 231B B8 Wrse Poerele�ivemze' .7 TON 22DO 1ON34DO $ TROD ENDOW 23 NO 11431 NO 22SO 11 SPUN $ ED 00 1 E ISO NO axvea MIT T- S 2101000 seeima S 435000 seima S 35.NO seemei S 181440 ROD T a $ 4840 40 xWam 3D Moo,rs"p5eimev) p18 POP B8 ED Sd-k PCC e" moimev) 5'51 e ugitm0 404 S e�e1m0 1851404 S epm0o srs 1404 S grseaz sers ices S ;®vo se iota S zi 81540 Protect Name: N.cRANBVIEw AVE IMPROVEMENTsv B.INTERSECTION 20 l0a1' EnBmeers Eaumaie Ponien comanMion Eaalem Iowa Excavating Temiggrrie Excavating Norerehl Coneo-uclion NI OE RNOMBERE BIO ITEM DESCRIPTION [91EdONR PRICE TOTNL PRICE pNRPRICE TOTNL PRICE pNITPRICE TOTNL PRICE pNRPRICE TOTNL PRICE pNRPRICE TOTNL PRICE 35 8010108 D5 Electrical eeMce Control Pedestal P recast Concrete Base 1 EA $ 4,00000 $ 4,00800 $ 2,05000 $ 245800 $ 2,00800 $ 2,00000 $ 2]20.00 $ 2,72800 $ 2,00000 $ 240800 30 8010.10&A.1 Handhole,PC,Rectangular 1 EA $ 1 500 00 $ 150800 $ 1,6!500 $ 157500 $ 220800 $ 2 200 00 $ 223800 $ 2,23800 $ 1,]0000 $ 17000 37 8010108 N6 Removal-Trltic elgnal,Intersection 1 LB $ 8,00000 $ 8,00800 $ 3,00000 $ 340800 $ 1,00800 $ 1,00000 $ 2]20800 $ 2]20800 $ 30,00000 $ 3040800 38 8010108 C0 Traffic Signal 1 LB $154,14900 $ 154,14900 $ 123,00000 $ 12340800 $ 130,00800 $ 130,00000 $ 129,10800 $ 129/0800 $ 118,00000 $ 11840800 Sub Total $ 20527900 Sub Total $ 191 45].00 Sub Total $ 20463000 Sub Total $ 238,61840 Sub Total $ 23910400 HOT Division 2527-Pavement Marking 39 DOT 252704 A-1 Painted Pavement M arkings 2831 BTA $ 5500 $ 15505 $ 8800 $ 2 491 28 $ 8500 $ 2 406 35 $ 8820 $ 2,49694 $ 8000 $ 226480 40 IDOT 252704 A-4 LTAW.Lee Turn Arrow White) e EA $ 9500 $ 76800 $ 9100 $ 74400 $ 19800 $ 151000 $ 93.]0 $ 74960 $ 8500 $ 68800 41 IDOT 252704 A-8 Pavement Markings Removed 4 BTA $ 4000 $ 15800 $ 11000 $ 43450 $ 12800 $ 474 00 $ 11800 $ 43450 $ 10000 $ 395.00 Sub Total $ 2,47505 Sub Total $ 3669.]8 Sub Total $ 4,40035 Sub Total $ 3,68104 Sub Total $ 3339.80 HOT Division 2528-Traffic Control 42 DOT 252804A Traffic Control 1 LB $ 10,00000 $ 10,00800 $ 15,00000 $ 1540800 $ 15,00800 $ 15,00000 $ 1530800 $ 1530800 $ 15,00000 $ 1540800 Sub Total $ 10,00800 Sub Total $ 1500800 Sub Total $ 15,00000 Sub Total $ 1530800 Sub Total $ 1500800 Division 9020-Sodding 43 G0201CIE A-0 Pon 3 48 80 $ 10550 $ 68364 $ 30000 $ 194400 $ 350000 $ 22,68000 $ 200000 $ 1814400 $ 250000 $ 1620000 Sub Total $ 68364 Sub Total $ 194400 Sub Total $ 22,68000 Sub Total $ 1814400 Sub Total $ 1620000 Total Est. $ 30696540 Total Bid $ 328 276 Total Bid $ 369,88909 Total Bid $ 42694940 Total Bid $ 434416.10 %Over l Under t-1 694% 2050% 39.09% 4152%