Loading...
Wartburg Place ReconstructionMEMORANDUM June 22, 2002 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Wartburg Place Reconstruction Public Works Director Mike Koch recommends initiation of the bidding process for the Wartburg Place Reconstruction Project, and further recommends that a public hearing be set for August 5, 2002. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director MEMORANDUM June 24, 2002 TO: Michael C. Van Milligen, City Manager FROM: Michael A. Koch, Public Works Director SUBJECT: Wartburg Place Reconstruction INTRODUCTION The enclosed resolutions authorize the public bidding procedure for the Wartburg Place Reconstruction Project. DISCUSSION The project will consist of the complete reconstruction of the existing base and pavement surface for Wartburg Place, the installation of sidewalk on both sides, and a hammerhead turnaround constructed at the end of Wartburg Place before Sunset Ridge (a private street). The street width is 31 feet in front of Wartburg Seminary with parking on one side. To the east of Wartburg Seminary, there is a 24-foot wide section with parking prohibited on both sides of the street. Since there is a parking prohibition on both sides of the 24-foot wide section of street, the existing width will be retained; however, the 6-inch wide curb will bring the street width to 25 foot from back-of-curb to back-of-curb. To my knowledge, the City has never received a request to widen this street, and widening would have a negative impact on a parallel row of evergreens located just off the right-of-way. These evergreens would need to be pruned back about three (3) feet if the street were to be widened. Sunset Ridge is a private street; however, the City has historically plowed the snow on the street, in exchange for the snowplows being able to turn around in the turnaround at the bottom on Sunset Ridge. This plowing was eliminated last year; and therefore, a new turnaround must be provided for the Operations & Maintenance Department for the aforementioned purpose. The new hammerhead turnaround will be located in existing City right-of-way just prior to Sunset Ridge, as shown on the attached plan. A new storm sewer is needed to drain the turnaround and Wartburg Place before the water flows down Sunset Ridge. Negotiations are still taking place to acquire the easement. (If the easement cannot be negotiated, the City Council will be asked to authorize condemnation at a future Council meeting.) The last 600 feet of watermain is to be replaced along with all new valves; the existing sanitary sewer will be updated from 6" to 10" ductile iron pipe. The Engineering and the City Forester have met with some of the residents along the project to discuss the necessary removal of eight (8) trees. The trees are along Wartburg Seminary's frontage, and they do not have any problem with the removal because of the condition of the trees. The schedule for the project will be as follows: Advertisement for Bids July 5, 2002 Notice of Hearing on Plans and Specifications July 19, 2002 Mail Notice to Property Owners July 19, 2002 Published Notice to Property Owners July 19, 2002 July 26, 2002 Receipt of Bids July 25, 2002 Public Hearing August 5, 2002 Award of Contract August 5, 2002 Completion June 27, 2003 RECOMMENDATION I would recommend that the City Council give preliminary approval to the Resolution of Necessity and establish August 5, 2002 as the date of the Public Hearing. BUDGET IMPACT The estimate for the project is as follows: Construction Contract $557,840.00 Contingency $ 55,784.00 Engineering $ 92,043.60 Total $705,667.60 The project will be funded as follows: Road Use Tax $454,262.74 Special Assessment to Private Properties $108,682.51 Special Assessment Deficiency to be Paid By City 0 Special Assessment for Sidewalk $ 17,316.59 Special Assessment - Water Services $ 15,895.99 Sanitary Sewer Construction Fund $ 48,682.24 Watermain Construction Fund $ 60,827.53 Total $705,667.60 The project will be funded through a Fiscal Year 2002 CIP appropriation of $2,515,000. The project, as outlined, will require $454,262.74 in City funds. Low- to moderate- income property owners subject to street assessment will be eligible for financial assistance ranging from 20 to 100 percent of the street assessment for the owner- occupied resident property depending on family size and income level. This financial assistance program is made available through the One Percent Local Option Sales Tax. ACTION TO BE TAKEN The City Council is requested to give preliminary approval to the Resolution of Necessity, approve the preliminary assessment schedule, and to establish the date of the Public Hearing. MAK/vjd Prepared by Michael Felderman cc: Bob Green, Water Plant Manager Gus Psihoyos, Assistant City Engineer CITY OF DUBUQUE ENGINEERING DEPARTMENT 2001 Paving Project Wartburg Street Fremont Avenue to Sunset Circle Cul De Sac Layout RESOLUTION NO. 348-02 PRELIMINARY APPROVAL OF PLANS AND SPECIFICATIONS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Wartburg Place Reconstruction Project, in the estimated amount $705,667.60 are hereby approved and ordered filed in the office of the City Clerk for public inspection. Passed, adopted and approved this 1st. day of July, 2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 349-02 FIXING DATE OF HEARING ON PLANS AND SPECIFICATIONS Whereas, the City Council of the City of Dubuque, Iowa has given its preliminary approval on the proposed plans, specifications, and form of contract and placed same on file in the office of the City Clerk for public inspection of the Wartburg Place Reconstruction Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Hearing will be held on the 5th day of August, 2002, at 6:30 p.m. in the Public Library Auditorium at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and cost of said improvement, and the City Clerk be and is hereby directed to cause a notice of time and place of such headng to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be not less than four days nor more than twenty days prior to the day fixed for its consideration. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, contract, or estimated cost of the improvement. Passed, adopted and approved this 1st dayof ,]u%, ,2002. Terrance M. Duggan, Mayor Attest: Jeanne, F. Schneider, CMC, City Clerk RESOLUTION NO. 350-02 RESOLUTION OF NECESSITY Whereas, proposed plans have been duly prepared and approved by the City Council of the City of Dubuque and are now on file in the office of City Clerk showing among other things the plans, specifications, form of contract, estimated cost and preliminary plat and schedule showing the amount proposed to be assessed against each lot and the valuation of each lot as filed by the City Council, for the War[burg Place Reconstruction Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the City Council deems it advisable and necessary for the public welfare to make the herein mentioned improvements, and unless property owners at the time of the final consideration of this proposed resolution have on file with the City Clerk objections to the resolution of necessity, they shall be deemed to have waived all objections pertaining to the regularity of the proceeding and the legality of using the special assessment procedure. Said improvements shall be constructed and done in accordance with the plans and specifications which have been approved by the City Council and now on file with the City Clerk. That the .cost and expense of making such improvement will be assessed par[ially or totally against privately owned property lying with the assessment limits, and in an amount not to exceed that provided by law, and in proportion to the special benefits conferred. The por[ion of the cost which shall be borne by the City will be paid from Road Use Tax, Sanitary Sewer Construction Fund, Watermain Construction Fund, and special assessment bonds may be issued in anticipation of deferred payments of assessments when a contract has been performed and accepted, and the proceeds thereof used to pay the contractor. The above resolution was introduced, approved and ordered placed on file with the City Clerkthis 1st day of July, 2002. Approved and placed on file for final action. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RECORD OF FINAL ADOPTION the City Council this 1st. day of The foregoing Resolution was finally passed and adopted as proposed by July ,2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 351-02 FIXING DATE OF HEARING ON RESOLUTION OF NECESSITY Whereas, the City Council of the City of Dubuque, Iowa, has given its preliminary approval on the proposed plans, specifications and form of contract and placed same on file in the office of the City Clerk for public inspection for the Wartburg Place Reconstruction Project; and Whereas, the proposed Resolution bf Necessity for said improvement has been introduced and is now on file in the City Clerk's office for public inspection. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That on the 5m day of August, 2002, a public hearing will be held at 6:30 p.m. in the Public Library Auditorium in the City of Dubuque at which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot, or the final adoption of a resolution of necessity and the City Clerk be and is hereby authorized and directed to cause a notice of time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published once each week for two consecutive weeks, the first publication of which shall be not less than ten days prior to the day fixed for its consideration. Unless property owners at the time of the final consideration of this proposed resolution have on file with the City Clerk objections to the Resolution of Necessity they shall be deemed to have waived all objections thereto. Passed, adopted and approved this 1st day of July, 2002. Terrance M. Duggan, Mayor Attest Jeanne F. Schneider, CMC, City Clerk day of July ,2002. RESOLUTION NO. 352-02 RESOLUTION APPROVING PRELIMINARY SCHEDULE OF ASSESSMENTS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the attached sheets, 1 to 1 inclusive, are hereby determined to be the schedule of proposed assessments for the Wartburg Place Reconstruction Project and the valuations set out herein are hereby approved. Passed, approved and adopted this 1st day of July, 2002. Attest: Jeanne F. Schneider, CMC, City Clerk Terrance M. Duggan, Mayor RESOLUTION NO. 353-02 ORDERING BIDS NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the Wartburg Place Reconstruction Project is hereby ordered to be advertised for bids for construction. BE IT FURTHER RESOLVED, that the amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved as a part of the plans and specifications heretofore adopted. That the City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall not be less than four days nor more than forty-five days prior to the receipt of said bids at 2:00 p.m. on the 25th day of July, 2002. Bids shall be opened and read by the City Clerk at said time and will be submitted to the Council for final action at 6:30 p.m. on the 5th day of August, 2002. Passed, adopted and approved this 1st day of July, 2002. Attest: day of July ., 2002. Terrance M. Duggan, Mayor Jeanne F. Schneider, CMC, City Clerk NOTICE OF HEARING ON PLANS AND SPECIFICATIONS Notice of public hearing on proposed plans and specifications, proposed form of contract and estimate of cost for the War[burg Place Reconstruction Project. NOTICE IS HEREBY GIVEN: The City Council of Dubuque, Iowa will hold a public hearing on the proposed plans,, specifications, form of contract and estimate of cost for the War[burg Place Reconstruction Project, in accordance with the provisions of Chapter 384, City Code of Iowa, at 6:30 p.m., on the 5th day of August, 2002, in the Public Library Auditorium, 360 West 11th Street, in Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimate of cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto or to the cost of the improvements. Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 589-4193 in the Human Rights Department at least 48 hours prior to the meeting. Published by order of the City Council given on the ,2002. day of Jeanne F. Schneider, CMC City Clerk NOTICE TO PROPERTY OWNERS Notice is given that there is now on file for public inspection in the office of the City Clerk of Dubuque, iowa, a proposed Resolution of Necessity, an estimate of cost, and a plat and schedule showing the amounts proposed to be assessed against each lot and the valuation of each lot within a district approved by the City Council of Dubuque, Iowa, for an improvement of the type(s) and in the location(s) as follows: War[burg Place Reconstruction Project That the proposed district to be benefited and subject to assessment for the cost of such improvements is described as follows: All property included with the areas described so as to include one-half of the privately-owned property between each such street to be improved and the next street, whether such privately-owned property abuts upon the street to be improved or not. In no case shall property situation more than 300 feet from the street to be improved be assessed. The City Council will meet at 6:30 p.m. on the 5th day of August, 2002, at the Public Library Auditorium, 360 West 11th Street, at which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot, or the final adoption of a resolution of necessity. A property owner will be deemed to have waived all objections unless at the time of hearing he has filed objections with the City Clerk. Any visual- or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD (563) 589-4193 in the Human Rights Department at least 48 hours prior to the meeting. Published by order of the City Council given on the ., 2002. day of Jeanne F. Schneider, CMC City Clerk RESOLUTION NO. ORDERING BIDS NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the War[burg Place Reconstruction Project is hereby ordered to be advertised for bids for construction. BE IT FURTHER RESOLVED, that the amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved as a part of the plans and specifications heretofore adopted. That the City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall not be less than four days nor more than forty-five days prior to the receipt of said bids at 2:00 p.m. on the 25th day of July, 2002. Bids shall be opened and read by the City Clerk at said time and will be submitted to the Council for final action at 6:30 p.m. on the 5th day of August, 2002. Passed, adopted and approved this .__ day of .,2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. RESOLUTION APPROVING PRELIMINARY SCHEDULE OF ASSESSMENTS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the attached sheets, 1 to 1 inclusive, are hereby determined to be the schedule of proposed assessments for the Wartburg Place Reconstruction Project and the valuations set out herein are hereby approved. Passed, approved and adopted this day of ., 2002. Terrance M, Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY OF DUBUQUE, IOWA WARTBURG STREET ( FREMONT AVE. TO SUNSET KiDGE STREET) SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS PARCEL VALUATION w/ NETPAVING SIDEWALK DEFICIENCY GROSS WATERSERVI TOTALNET OWNER LO]' DESCRIPTION No IMPROVEMENT ASSESSMENT ASSESSMEN ASSE$SMEN ASSESSMENT ASSESSMEN ASSESSMENT SIMPSON 5 ADD ESTHER MCGUIRE PLACE Schmid, James A & Mat~ S I 10-26-4534)13 $329.19367 $1.423 67 Schmid, James A & Mary S 2 2 10-26-453 013 Bschen. Raymond J & Mary i 2 10-26 457-011 $177.56564 $2.475 64 Hm tley. Mm2~ Louise Sly 89' Wly I10' - 2 - Sub I - 3 = 64 alld 2 -64 i. Simpson~s Add & 2 M.L 144 10 26-453-012 $107.985 64 $2,47564 l~ardey, Maly Louiac Sly 89' Ely 90' - 2 Sub I - 3 - 64 and 2 - 64 in Simpson's Add & 2 - M.L. 144 10-26-453-012 Hallley. Mary Louise Sly 89' Wly 10' I - 2 - i - Sub I 3 - 64 and 2 64 in Simpson's Add & ML 144 10-26-4534)12 $4.60460 $11.33061 $1,423 67 $1,423 67 $2,47564 $2,47564 $2,475 64 $2,475 64 $1,767 54 $1,76754 $48747 $1.356.08 $1,843 55 $2. II3.06 $1.35608 $3.46914 53.214 30 $63250 $3.84680 $632.50 $63250 $4.463 83 $4,463.83 $5,823 45 $1.356.08 $7.179 53 $13.72281 $63250 $14.35531 $32,31097 $63250 $32,94347 $51,45741 $3,63055 $55,08796 $1,07778 $I,077 78 $1,077 78 $1,07778 $1,077.78 $1,077 78 $1,07778 $1,077 78 RESOLUTION NO. RESOLUTION ADOPTING PLANS AND SPECIFICATIONS Whereas, on the 26th day of June, 2002, plans, specifications, form of contract and estimated cost were filed with the City Clerk of Dubuque, Iowa for the War[burg Place Reconstruction Project. Whereas, notice of hearing on plans, specifications, form of contract, and estimated cost was published as required by law. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the said plans, specifications, form of contract and estimated cost are hereby approved as the plans, specifications, form of contract and estimated cost for said improvements for said project. Passed, adopted and approved this day of ,2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk Jun.!2, 2002 8:36AU BARRY A L!NDAHL, ESQ No.E556 ~, 2/3 June 12, 2002 Mayor Terrance Duggen and Members of the City Council City Hall - City Clerk's Office 50 West 13th Street Dubuque, IA 52001 RE: Sunset Ridge Dear Mayor and Council Members: The purpose of this letter is to advise you as to the status of this matter. As you will recall, in the Fall of 2001, Doug Henry, who represents a number of the owners of property on Sunset Ridge, and I exchanged letters with respect to the legal status of Sunset Ridge. I concluded that I did not believe that Sunset Ridge was ever formally accepted as a public street by the City Council but that the argument could be made that the City Council may still have the option of accepting it. In the alternative, I suggested that his clients could ask the District Court to resolve the issue. In response, Doug sent the City Council a letter in December 2001 requesting the adoption of a Resolution accepting Sunset as a public street. The exchange of correspondence between Doug and me was on the City Council agenda for the January 21, 2002 City Council meeting. According to the City Clerk's minutes of the January 21st meeting, Doug Henry's letter was received and filed. A motion to accept Sunset Ridge as a public street was seconded but failed. A motion to authorize me to negotiate with the properly owners for the reconstruction cost of the street failed to receive a second. A motion to refer the matter to staff also failed for lack of a second. A motion to table the matter passed. I have not had any further communication from any of the residents or Doug Henry since that time. I might also add that a recent Iowa Supreme Court opinion appears to confirm my earlier conclusion that the street, if it was dedicated to the public, was never accepted by the City. The case is Sons Of Union Veterans v. Legion Post 508, 641 N.W.2d 729 (Iowa 2002). The case did not involve a street but the Court did discuss dedication of land and acceptance of a dedication. The Court said that acceptance of a dedication may be implied, for example, where the party accepting the dedication does Sun,!2, 2002 8:37AM BARRY A LINDAHL, ESQ No,7556 P, 3/3 "some act which unequivocally shows an intent to assume jurisdiction over the thing dedicated." (Emphasis added) Based upon the information I have from various City departments, I have not seen any act on behalf of the City which "unequivocally shows an intent to assume jurisdiction" over Sunset Ridge. If you need any additional information, please contact me at your convenience. Very sincerely, Barry A. Lindahl Corporation Counsel BAL:tls cc: Michael Van Milligen, City Manager Mike Koch, Public Works Director