Loading...
Groveland Place Sanitary Sewer Reconstruction Project AcceptanceTHE CITY OF DUBUQUE Masterpiece on the Mississippi Dubuque All-American City 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Groveland Place Sanitary Sewer Reconstruction Project DATE: December 30, 2008 City Engineer Gus Psihoyos is recommending acceptance of the Groveland Place Sanitary Sewer Reconstruction Project, as completed by Arensdorf Excavating & Trucking, in the final construction contract amount of $46,844.14. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUBUQUE Masterpiece on the Mississippi Dubuque All-American City 2007 TO: Michael C. Van Milligen, City Man r FROM: Gus Psihoyos, City Engineer SUBJECT: Groveland Place Sanitary Sewer Reconstruction Project (CIP 7101902) DATE: December 19, 2008 INTRODUCTION Dubuque A1-America City 2007 The enclosed resolution provides for the acceptance of the public improvements and establishing the final construction contract amount for the Groveland Place Sanitary Sewer Reconstruction Project. BACKGROUND The Groveland Place Sanitary Sewer Reconstruction Project involved the replacement of 603 feet of 6-inch diameter clay sewer pipe with 8-inch diameter PVC sewer pipe along Groveland Place from Burden Street to Brunswick Street. DISCUSSION The Groveland Place Sanitary Sewer Reconstruction Project was completed by Arensdorf Excavating & Trucking of Anamosa, Iowa, in the final contract amount of $46,884.14, which is a 12.9% decrease from the original contract in the amount of $53,809.08. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $46,884.14 for the Groveland Place Sanitary Sewer Reconstruction Project. BUDGET IMPACT The project cost summary for the Groveland Place Sanitary Sewer Reconstruction Project is as follows: Construction Contract Contingency Construction Engineering & Inspection Total Project Cost The project funding summary is as follows: CIP No. Fund Description 7101902 Groveland Brunswick to Burden 7101289 General Sanitary Sewer Repairs Bid Award $ 53, 809.08 6,593.81 10,879.78 $71,282.67 Total Project Funding ACTION TO BE TAKEN Final $46,884.14 0 13,398.22 $60,282.36 Fund Amount $54,000.00 6,282.36 $60,282.36 The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $46,884.14 to Arensdorf Excavating & Trucking for the Groveland Place Sanitary Sewer Reconstruction Project. Prepared by Deron Muehring, Civil Engineer II cc: Jenny Larson, Budget Director Deron Muehring, Civil Engineer II RESOLUTION NO. 2-09 ACCEPTING THE GROVELAND PLACE SANITARY SEWER RECONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Groveland Place Sanitary Sewer Reconstruction Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Groveland Brunswick to Burden CIP (7101902) and General Sanitary Sewer Repairs CIP (7101289) appropriations for the contract amount of $46,884.14 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 5th day of January, 2009. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE GROVELAND PLACE SANITARY SEWER RECONSTRUCTION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Groveland Place Sanitary Sewer Reconstruction Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $60,282.36. Dated this 5th day of January, 2009. City Engineer Filed in the office of the City Clerk on the 5th day of January, 2009. Jeanne F. Schneider, CMC, City Clerk 7HE CITY OF DUB E City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563)589-4270 PROJECT CLOSE OUT FORM j Project Name: GROVELAND STREET SANITARY SEWER PROJECT CIP Number: 7101902 Project Contract Amount: $65,938.05 ~ ', Project COm letion Date: 9-Nov-0B CDDtractor Name: Arensdorf Excavatin Contractor Address: 9802 Coun Road X40 City, State, Zip: Anamosa, Iowa Contractor Tele hone: 319-202-2874 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL OUANTITY TOTAL PERCENT COMPLETE 1 8" PVC 602.92 LF $ 24.13 570.67 $ 13 770 27 94 65 2 8" x 4" PVC a 12 Each $ 53.65 14.00 $ , . 751 10 . 116 67 3 4" PVC Lateral 120 LF $ 21.22 86.08 $ . 1 826 62 . 71 73 4 48" Diameter Manhole Base 2 Each $ 286.46 2.00 $ , . 572.92 . 100 00 5 48" Diameter Sidewak 16.07 VF $ 90.30 16.00 $ 1 444.80 . 99 56 6 Manhole Frame and Cover 2 Each $ 296.88 2.00 $ , 593.76 . 100 00 7 Beddin Stone, 1"Clean 165 Ton $ 11.25 244.94 $ 2 755.58 . 148 45 8 Backfill, Limestone 2575 Ton $ 5.00 2176.03 $ , 10 680.15 . 84 51 9 Graded Stone Base 455 Ton E 9.84 80.93 $ , 796.35 . 17 79 10 HMA Surface Course 185 Ton $ 70.26 181.05 $ 12 720.57 . 97 86 11 4" PCC Sidewalk 64 SF $ 3.81 0.00 $ , . 0 00' 12 Landsca Restoration 125 SY $ 0.73 105.30 $ 76.87 . 84 24' 13 Traffic Control And Pro'ect Safe 1 LS $ 911.46 1.00 $ 911.46 . 100.00' CHANGE ORDER 1 Mr Rooter 2981 Brunswick St -clean sewer lateral / 9/30/08 1.00 $ 108.15) 2 Mr Rooter (8 2985 Brunswick St -clean sewer lateral / 9/30/08 1.00 $ 108.15 ! mange urger roars $ (216.30) I Total Contract Work Performed to Date: $ 47,100.44 Total Change Order Work Performed to Date: $ (216.30) Total Contract and Change Order Work Performed to Date: S 48,884.14 Miscellaneous Costs $ En ineedn _ $ 13.398.22 TOTAL FINAL PROJECT COSTS: S 60,282.36 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: ~.--"""'-"~ Michael Van Milligan, Cily. snager Dubuque, Iowa /t ~//1~ Gus Psihoyos, City Engineer Dubuque, Iowa The Undersi ned, ~ n ~, ~~~ G~~ g w v ,contractor for the above improvement, does hereby accept Me elel ntractor', as full settl~fera8ttaims-fa id improve C. ~ ~~- APPROVED: \-~ ~~: BY: THE CITY OF DUB E ~~ City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563) 589-4270 PROJECT CLOSE OUT FORM Project Name: GROVELAND STREET SANITARY SEWER PROJECT CIP Number: 7101902 ~PrOject COOtraCt Arr10UDt: $65,938.05 Project Com letion Date: 9-Nov-0B Contractor Name: Arensdort Excavatin Contractor Address: 9802 Coun Road X40 City, State, Zip: Anamosa, Iowa Contractor Tele hone: 319-202-2874 ITEM CONTRACT ITEM CONTRACT ITEM PROJECT TOTAL PERCENT NO. DESCRIPTION OUANTITY UNIT UNIT PRICE QUANTITY TOTAL COMPLETE 1 8"PVC 602.92 LF $ 24.13 570.67 $ 13,770.27 94.65% 2 8" x 4" PVC a 12 Each $ 53.65 14.00 $ 751.10 116.67 3 4" PVC Lateral 120 LF $ 21.22 86.08 $ 1,826.62 71.73 4 48" Diameter Manhole Base 2 Each $ 286.46 2.00 $ 572.92 100.00 5 48" Diameter Sidewall 16.07 VF $ 90.30 16.00 E 1,444.80 99.56 6 Manhole Frame and Cover 2 Each $ 296.88 2.00 $ 593.76 100.00 7 Beddin Stone, 1" Clean 165 Ton E 11.25 244.94 $ 2,755.58 148.45 8 Backfill, Limestone 2575 Ton $ 5.00 2176.03 E 10,880.15 84.51 9 Graded Stone Base 455 Ton E 9.84 80.93 $ 796.35 17.79 10 HMA Surface Course 185 Ton E 70.26 181.05 $ 12,720.57 97.86 11 4" PCC Sidewalk 64 SF E 3.81 0.00 $ 0.00 12 Landsca Restoration 125 SY $ 0.73 105.30 $ 76.87 84.24% 13 Traffic Control And Pro ect Safe 1 LS E 911.46 1.00 $ 911.46 100.00 Payment Totals $ 47,100.44 CHANGE ORDER 1 Mr Rooter 2981 Brunswick St -clean sewer lateral / 9!30!08 1.00 $ 108.15 2 Mr Rooter ~ 2985 Brunswick St -clean sewer lateral / 9130!08 1.00 $ 108.15) Change Order Totals S (216.30) I Total Contract Work Pertormed to Date: $ 47,100.44 Total Change Order Work Performed to Date: $ (216.30) Total Contract and Change Order Work Performed to Date: S 46,884.14 Miscellaneous Costs $ Engineering E 13.398.22 TOTAL FINAL PROJECT COSTS: S 60,282.36 I hereby certify that the above statement shows, in detail, the cored amount of all work required to complete the above improvement. APPROVED: ,--''~ Michael Van Milligen, City ger Dubuque, Iowa ~ ~ ~y~ The Undersigned, ~i"`-" L~ L ~ ~ `, contractor for the above improvement, does hereby acre thve'TOtal Due Contrectof', as full settlernp~ntt for said iinp omen . APPROVED: ~ ~ t-~ BY: -/~~ C r 7 . rr /../ r ~ ~ - Gus Psihoyos, City Engineer Dubuque, Iowa THE C1TY OF DUB '/ O~y~ c.,~"E City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563)589-4270 PROJECT CLOSE OUT FORM --------------- Project Name: ---- GROVELAND STREET j SANITARY SEWER PROJECT CIP Number: ( 7101902 Project Contract Amount: 565,938.05 Project Com letion Date: 9-Nov-0B Contractor Name: Arensdorf Exwvatin Contractor Address: 9802 Coun Road X40 City, State, Zip: Ananwsa, Iowa Contractor Tele hone: 319-202-2874 IICM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 1 8"PVC 602.92 LF 5 24.13 570 67 E 13 770 27 94 65% 2 8" x 4" PVC a 12 Each $ 53.65 . 14.00 $ , . 751 10 . 116 67 3 4" PVC Lateral 120 LF $ 21.22 86 08 $ . 1 826 62 . 71 73 4 48" Diameter Manhole Base 2 Each $ 286.46 . 2.00 5 , . 572 92 . 100 00 5 48"Diameter Sidewell 16.07 VF $ 90.30 16 00 $ . 1 444 80 . 99 56% 6 Manhole Frame and Cover 2 Each S 296.88 . 2.00 $ , . 593 76 . 100 00 7 Beddin Stone, l"Clean 165 Ton E 11.25 244.94 $ . 2 755 58 . 148 45% 8 Backflll, Limestone 2575 Ton 5 5.00 2176.03 $ , . 10 880 15 . 84 51 9 Graded Stone Base 455 Ton E 9.84 80.93 $ , . 796 35 . 17 79 10 HMA Surface Course 185 Ton E 70.26 181.05 S . 12 720 57 . 97 86% 11 4" PCC Sidewalk 64 SF $ 3.81 0 00 $ , . . 0 00% 12 Landsca eRestorelion 125 SY $ 0.73 . 105 30 $ 76 87 . 84 24% 13 Traffic Control And Pro'ect Safe 1 LS $ 911.46 . 1.00 $ . 911.46 . 100.00 CHANGE ORDER 1 Mr Rooter 2981 Brunswick St -clean sewer lateral / 9/30/08 1.00 $ 108.15) 2 Mr Rooter ~ 2985 Brunswick St - Gean sewer lateral / 9/30!08 1.00 $ 108.15 r a~~aa .n uv~ , i (Z76301 I Total ConVad Work Performed to Date: $ 47,100.44 Total Change Order Work Performed to Date: $ (216.30) Total Contract and Change Order Work Performed to Date: $ 46,884.14 Miscellaneous Costs $ En ineedn $ 13.398.22 TOTAL FINAL PROJECT COSTS: S 60,282.36 I hereby certiry that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen~.Cjty er \ Dubuque, Iowa ~ ~ /~ Gus Psihoyos, City Engineer Dubuque, Iowa The Undersigned, G t" V cenVactor for the above improvement, does hereby accept the .e'7gtal Due Contractor', as fullMfiere for said iri~. .._.... APPROVED: ~ ~' -~ BY: \\\ ,~. 2- / /~~ J G .~. ,~