JFK Road & Kaufmann Ave. Storm Sewer ProjectTHE CITY OF DUBUQUE Masterpiece on the Mississippi Dubuque All-American City 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: John F. Kennedy Road-Kaufmann Avenue Storm Sewer Project (CIP #7201358, 7201909 & 7201066) DATE: December 30, 2008 City Engineer Gus Psihoyos is recommending acceptance of the John F. Kennedy Road-Kaufmann Avenue Storm Sewer Project in the amount of $70,278.16, as completed by McDermott Excavating. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael .Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DuB E Masterpiece on the Mississippi TO: FROM: SUBJECT: DATE: INTRODUCTION Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer . Dubuque AN-Ame~ca City 2007 John F. Kennedy Road-Kaufmann Avenue Storm Sewer Project (CIP# 7201358, 7201909 & 7201066) December 19, 2008 The enclosed resolution provides for the acceptance of the construction contract for the John F. Kennedy Road (JFK)-Kaufmann Avenue (Kaufmann) Storm Sewer Project. BACKGROUND The project improved the flow characteristics on Kaufmann Avenue just west of the JFK as outlined in the Drainage Basin Master Plan by increasing the size and grade of the existing 76-foot long sewer from the Kaufmann/JFK intersection. It also involved the replacement of approximately 500 feet of failing 15-inch and 18-inch diameter metal storm pipe along the east side of JFK Road from Kaufmann Avenue to Rosewood Drive. Under State of Code 26.14, the City can seek competitive quotations if the competitive bid threshold of the public improvement is greater than $25,000 but less than $99,999. Sealed bids were received on the project on December 18, 2007. Of the nine bids received, McDermott Excavating of Dubuque, Iowa submitted the low bid in the amount of $61,726.87. This amount was 7% below the engineer's estimate of $66,177.33. DISCUSSION The JFK-Kaufmann Storm Sewer Project was completed by McDermott Excavating of Dubuque, Iowa, in the final contract amount of $70,278.16. Construction Contract Contingency Construction Engineering & Inspection Total Project Cost RECOMMENDATION Award $61,726.87 6,617.73 10,919.26 $79,263.86 Final $70,278.16 0.00 8,352.01 $78,630.17 I recommend that the City Council accept the improvements and authorize the payment of the contract in the amount of $70,278.16 to McDermott Excavating for the John F. Kennedy Road-Kaufmann Avenue Storm Sewer Project. BUDGET IMPACT The project funding summary is as follows: CIP No. Fund Description Fund Amount 7201358 Kaufmann &JFK Storm Sewer Repairs $41,000.00 7201909 JFK Storm Reconstruction -Kaufmann to Rosewood 36,500.00 7201066 General Storm Sewer Repairs 1,130.17 Total Project Funding $78,630.17 ACTION TO BE TAKEN I respecttully request that the City Council adopt the attached resolutions accepting the improvements and authorizing payment of the. contract in the amount of $70,278.16 to McDermott Excavating for the John F. Kennedy Road-Kaufmann Avenue Storm Sewer Project. Prepared by Deron Muehring, Civil Engineer II cc: Jenny Larson, Budget Director RESOLUTION NO. 3-09 ACCEPTING THE JOHN F. KENNEDY ROAD-KAUFMANN AVENUE STORM SEWER PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the John F. Kennedy Road- Kaufmann Avenue Storm Sewer Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Kaufmann & JFK Storm Sewer Repairs (CIP#7201358), the JFK Storm Reconstruction -Kaufmann to Rosewood (CIP#7201909), and the General Sanitary Sewer Repairs (CIP#7201066) Capital Improvement Program appropriations for the contract amount of $70,278.16 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 5th day of January, 2009. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE J JOHN F. KENNEDY ROAD-KAUFMANN AVENUE STORM SEWER PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the John F. Kennedy Road & Kaufmann Avenue Storm Sewer Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $78,630.17. Dated this 5th day of January, 2009. City Engineer Filed in the office of the City Clerk on the 5th day of January, 2009. Jeanne F. Schneider, CMC, City Clerk THE CITY OF DUB C E ~g City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563) 589-4270 PROJECT CLOSE OUT FORM ro~ec ame: JFK & KAUFMANN STORM SEWER PROJECT CIP Number: CIP # 7201358 & 7201909 roject Contract Amount: $61,726.87 Pro act Com letion Date: 19-May-0B on ac or ame: Ttv c>Sm,ott Excavat~n Contractor Address: 1aao7 US H 2D west City, State, Zip: Contractor Tele hone: Dubuque,lowa 52003 563-583-4633 ITEM NO• CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 1 15" RCP, Class III 190 59 LF $ 18 97 161 8 2 Junction Box #5 . . 309 72 LF $ 20 22 . 9 $ 3,071.05 84.94 % 3 Storm Manhole, 48" Diameter . . 76 52 LF $ 93 74 295.59 $ 5,976.83 60 95.44% 4 Concrete Transition Structure - 60" Box to 60" Round . . 1 Each $ 2 728 00 .00 $ 7,499.20 104.55 5 Junction Box #5 , . 1 Each $ 9 907 00 1.00 $ 2,728.00 1 0 100.00 6 Stonn Manhole, 48" Diameter , . 5 Each $ 1 175 00 . 0 $ 9,907.00 100.00 % 7 Intake, 101-B , . 1 Each $ 1 792 25 5.00 $ 5,875.00 1 00 100.00% 8 Tap Existing Intake , . 5 Each $ 250 00 . $ 1,792.25 3 100.00% 9 Bedding Stone, 1" Clean . 350 Tons $ 11 38 .00 $ 750.00 221 60.00°h 10 Backfill Limestone . 900 Tons $ 5 38 .47 $ 2,520.33 63.28 % 11 Graded Stone Base . 110 Tons $ 11 42 863.94 $ 4,648.00 17 95.99% 12 PCC Curb 8 Gutter, Including Removal . 140 LF $ 15 65 4.33 $ 1,990.85 158.48% 13 4" PCC Sidewalk Including Removal . 200 SF $ 4 01 89.75 $ 1,404.59 3 64.11 14 6" PCC Sidewalk !Driveway, Including Removal . 5 SY $ 42 80 82.27 $ 1,532.90 88 191.14% 15 Landscape Restoration . 1 LS $ 2 030 00 .34 $ 3,780.95 1 0 1766.80 16 Traffic Control /Safety , . 1 LS $ 2 412 00 . 0 $ 2,030.00 100.00°h 17 PCC Pavement Remove 8 Replace , . 65 SY $ 46 92 1.00 $ 2,412.00 100.00 % 18 HMA Pavement Remove & Replace . 120 SY $ 19.53 77.71 $ 3,646.15 165.20 $ 3,226.36 119.55% 137.67 % CHANGE ORDERS Sub Total $ 64,791.46 No. Date Descri lion Total Chan a Order Amount Pro act Total 1 2 3 29-Apr-08 14-May-0B Relay Sanitary Lateral to 3305 Kaufmann Detector Strips for Curb Ramps (4 Locations @ $140/E Sod w/Watering $ 3,979.00 $ 616.00 $ 891.70 $ 3,979.00 $ 616.00 $ 891.70 100.00% 100.00°~ 100.00% Sub Total $5,486.70 Payment Totals $ 70,278.16 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligan, City Manager Dubuque, Iowa -- ---~ ~ ~ r" ~h- Gus Psihoyos, City Engineer Dubuque, Iowa Total Contract Work Performed to Date: $ 64,791.46 Total Change Order Work Performed to Date: $ 5,486.70 Total Contract and Change Order Work Performed to Date: $ 70,278.78 Miscellaneous Costs $ _ En ineerin $ 8 352 01 TOTAL FINAL PROJECT COSTS: The Undersigned, /1l ~~Piat~Tf ~r~L.GVK~~_, contractor for the above improvement, does hereby accept the above'Total Due Contractor", as full settlement for all claims for said~im/provement. APPROVED: ~Q J.J v[,fJ~• ~ .. °~ TFIE C[TY OF DUB /oE ~~''~^~ / City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563) 589-4270 PROJECT CLOSE OUT FORM r- rojec ame: JFK & KAUFMANN STORM SEWER PROJECT ~ CIP Number: CIP # 7201358 & 7201909 roject Contract Amount: $61,72s.e7 ~Pro'ect Com letion Date: 1s-May-oa On aC Or ame: c ermott xcavahn Contractor Address: 14407 US Hwy 20 west city, State, Zip: Dubuque, Iowa 52003 COntraCtOr Tele hone: 563-583.4633 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 1 15" RCP, Class III 190.59 LF $ 18.97 161.89 $ 3,071.05 84.94 2 Junction Box #5 309.72 LF $ 20.22 295.59 $ 5,976.63 95.44% 3 Storm Manhole, 48" Diameter 76.52 LF $ 93.74 80.00 $ 7,499.20 104.55°~ 4 Concrete Transition Structure - 60" Box to 60" Round 1 Each $ 2,728.00 1.00 $ 2,728.00 100.00% 5 Junction Box #5 1 Each $ 9,907.00 1.00 $ 9,907.00 100.00% 6 Storm Manhole, 48" Diameter 5 Each $ 1,175.00 5.00 $ 5,875.00 100.00 % 7 Intake, 101-B 1 Each $ 1,792.25 1.00 $ 1,792.25 100.00% 8 Tap Existing Intake 5 Each $ 250.00 3.00 $ 750.00 60.00 9 Bedding Stone, 1" Clean 350 Tons $ 11.38 221.47 $ 2,520.33 63.28 % 10 Backfill Limestone 900 Tons $ 5.38 863.94 $ 4,648.00 95.99% 11 Graded Stone Base 110 Tons $ 11.42 174.33 $ 1,990.85 158.48°r6 12 PCC Curb & Gutter, Including Removal 140 LF $ 15.65 89.75 $ 1,404.59 64.11% 13 4" PCC Sidewalk, Including Removal 200 SF $ 4.01 382.27 $ 1,532.90 191.14% 14 6" PCC Sidewalk /Driveway, Including Removal 5 SY $ 42.60 88.34 $ 3,780.95 1766.80 15 Landscape Restoration 1 LS $ 2,030.00 1.00 $ 2,030.00 100.00°~ 16 Traffic Control /Safety 1 LS $ 2,412.00 1.00 $ 2,412.00 100.00% 17 PCC Pavement Remove & Replace 65 SY $ 46.92 77.71 $ 3,646.15 119.55 18 HMA Pavement Remove & Replace 120 SY $ 19.53 165.20 $ 3,226.36 137.67% CHANGE ORDERS Sub Total $ 64,791.46 No. Date Descri lion Total Change Order Amount Project Total 1 2 3 29-Apr-OB 14-May-08 Relay Sanitary Lateral to 3305 Kaufmann Detector Strips for Curb Ramps (4 Locations @ $140lE Sod wMlatering $ 3,979.00 $ 616.00 $ 891.70 $ 3,979.00 $ 616.00 $ 691.70 100.00 100.00 100.00 % Sub Total $5,486.70 Payment Totals $ 70,278.16 Total Contract Work Performed to Date: $ 64,791.46 Total Change Order Work Performed to Date: $ 5,486.70 Total Contract and Change Order Work Performed to Date: $ 70,278.18 Miscellaneous Costs $ En ineerin $ 8,352.01 TOTAL FINAL PROJECT COSTS: I hereby certify that the above statement shows, in detail, the cored amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager Dubuque, Iowa ~ ~ Gus Psihoyos, City Engineer Dubuque, Iowa The Undersigned, I~N~rFJCFWtU~ ~AYs3Kl~No wntradorforthe above improvement, does hereby accept the above'Total Due Contractor", as full settlement for all claims for said improvement. APPROVED: ~i~l~ ~DOI61/.~~t .. ~,~ THE CITY OF DUB E ~~`~ / City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563) 589-4270 PROJECT CLOSE OUT FORM rOJ@Ct ame: JFK & KAUFMANN STORM SEWER PROJECT CIP Number: CIP # 72o13sa 8 7zolsos roject Contract Amount: $61,726.87 Pro'ect Com letion Date: 1s-Ma -OB ~o~n raC or ame: c ermott xcavattn Contractor Address: 14407 uS H 20 west i City, State, Zlp: ~ Contractor Tele hone: Dubuque,lowa 52003 563-583-0633 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 1 15" RCP, Class III 190.59 LF $ 18.97 161.89 $ 3,071.05 84.94 % 2 Junction Box #5 309.72 LF $ 20.22 295.59 $ 5,976.63 95.44% 3 Storm Manhole, 48" Diameter 76.52 LF $ 93.74 80.00 $ 7,499.20 104.55 % 4 Concrete Transition Structure - 60" Box to 60" Round 1 Each $ 2,728.00 1.00 $ 2,728.00 100.00% 5 Junction Box#5 1 Each $ 9,907.00 1.00 $ 9,907.00 100.00% 6 Storm Manhole, 48" Diameter 5 Each $ 1,175.00 5.00 $ 5,875.00 100.00% 7 Intake, 101-B 1 Each $ 1,792.25 1.00 $ 1,792.25 100.00% 8 Tap Existing Intake 5 Each $ 250.00 3.00 $ 750.00 60.00% 9 Bedding Stone, 1" Clean 350 Tons $ 11.38 221.47 $ 2,520.33 63.28% 10 Backfill Limestone 900 Tons $ 5.38 663.94 $ 4,648.00 95.99% 11 Graded Stone Base 110 Tons $ 11.42 174.33 $ 1,990.85 158.48% 12 PCC Curb 8 Gutter, Including Removal 140 LF $ 15.65 89.75 $ 1,404.59 64.11 % 13 4" PCC Sidewalk, Including Removal 200 SF $ 4.01 382.27 $ 1,532.90 191.14% 14 6" PCC Sidewalk /Driveway, Including Removal 5 SY $ 42.60 88.34 $ 3,780.95 1766.80 % 15 Landscape Restoration 1 LS $ 2,030.00 1.00 $ 2,030.00 100.00% 16 Traffic Control !Safety 1 LS $ 2,412.00 1.00 $ 2,412.00 100.00% 17 PCC Pavement Remove & Replace 65 SY $ 46.92 77.71 $ 3,646.15 119.55 % 18 HMA Pavement Remove & Replace 120 SY $ 19.53 165.20 $ 3,226.36 137.67% CHANGE ORDERS Sub Total $ 64,791.46 No. Date Descri lion Total Chan a Order Amount Pro'ect Total 1 2 3 29-Apr-OB 14-May-08 Relay Sanitary Lateral to 3305 Kaufmann Detector Strips for Curb Ramps (4 Locations @ $140/E Sodw/Watering $ 3,979.00 $ 616.00 $ 891.70 $ 3,979.00 $ 616.00 $ 891.70 100.00 % 100.00% 100.00 Sub Total $5,486.70 Pa ment Totals $ 70,278.16 Total Contract Work Performed to Date: $ 64,791.46 Total Change Order Work Performed to Date: $ 5,486.70 Total ConVact and Change Order Work Performed to Date: ' E 70,278.16 Miscellaneous Costs $ En ineerin $ 8,352.01 TOTAL FINAL PROJECT COSTS: IS--78~63Q. i I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager Dubuque, Iowa ~--~ l 1 Gus Psihoyos, City Engineer Dubuque,lowa ,} C ~j _ The Undersigned, ~l ~Flf2~o Vr(~tf 4 ,contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. APPROVED: (I.C~~ IJ ~( p~(G( ~~