Hawthorne Street - Sutton Pool Storm Sewer Extension ProjectTHE CITY OF DUBUQUE Masterpiece on the Mississippi Dubuque All-American City 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Hawthorne Street -Sutton Pool Storm Sewer Extension Project (CIP #7201059) DATE: December 30, 2008 City Engineer Gus Psihoyos is recommending acceptance of the Hawthorne Street- Sutton Pool Storm Sewer Extension Project, as completed by Drew Cook and Sons Excavating Co, Inc., in the amount of $41,286.40. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUBUQUE Masterpiece on the Mississippi Dubuque All-American City 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Hawthorne Street -Sutton Pool Storm Sewer Extension Project (CIP# 7201059) DATE: December 19, 2008 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Hawthorne Street -Sutton Pool Storm Sewer Extension Project. BACKGROUND The project improved the drainage of the Hawthorne Street/Kerper Boulevard intersection. It also improved the drainage of the Sutton Pool parking lot. There was approximately 300 feet of storm sewer and four catch basins that were installed. Under State of Code 26.14, the City can seek competitive quotations if the competitive bid threshold of the public improvement is greater than $25,000 but less than $99,999. Sealed bids were received on the project on August 23, 2007. Of the seven bids received, Drew Cook & Sons Excavating Co., Inc. of Dubuque, Iowa submitted the low bid in the amount of $35,830.60. This amount was 5.2% below the engineer's estimate of $37,802.70. DISCUSSION The Hawthorne Street -Sutton Pool Storm Sewer Extension Project was completed by Drew Cook & Sons Excavating Co., Inc. of Dubuque, Iowa, in the final contract amount of $41,286.40. Construction Contract Contingency Construction Engineering & Inspection Award $37,802.70 3,780.27 6.237.45 Final $41,286.40 0.00 Total Project Cost $47,820.42 11,423.71 $52,710.11 RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract in the amount of $41,286.40 to Drew Cook & Sons Excavating Co., Inc. for the Hawthorne Street -Sutton Pool Storm Sewer Extension Project. BUDGET IMPACT The project funding summary is as follows: CIP No. Fund Description Fund Amount 7201059 Hawthorne-Kerper Storm Sewer Improvements $52,710.00 Total Project Funding $52,710.11 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolutions accepting the improvements and authorizing payment of the contract in the amount of $41,286.40 to Drew Cook & Sons Excavating Co., Inc. for the Hawthorne Street -Sutton Pool Storm Sewer Extension Project. Prepared by Deron Muehring, Civil Engineer II cc: Jenny Larson, Budget Director RESOLUTION NO. 4-09 ACCEPTING THE HAWTHORNE STREET - SUTTON POOL STORM SEWER EXTENSION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Hawthorne Street -Sutton Pool Storm Sewer Extension Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Hawthorne Street -Sutton Pool Storm Sewer Extension Project (CIP#7201059) Capital Improvement Program appropriation for the contract amount of $41,286.40 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 5th day of January, 2009. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE HAWTHORNE STREET -SUTTON POOL STORM SEWER EXTENSION PROJECT he has inspected the Hawthorne Street -Sutton Pool Storm Sewer Extension Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $52,710.11. Dated this 5th day of January, 2009. City Engineer Filed in the office of the City Clerk on the 5th day of January, 2009. Jeanne F. Schneider, CMC, City Clerk Hanoi; DUB ~~ / City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563) 589-4270 PROJECT CLOSE OUT FORM ro ec ame: HAWTHORNE ST. -SUTTON POOL STORM SEWER EXTENSION CIP Number: CIP # : 7201358 Project Contract Amount: $35,830.60 Pro ect Com letion Date: 26-oil-o7 on ac or ame: rew o0 8 ons Contractor Address: 5200 Wolff Road Clty, State, Zip: Dubuque, Iowa 52002 Contractor Tele hone: 563-582-9292 ITEM NO. CONTRACTITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE $ i "~: 1 15" RCP 249 97 LF $ 2 16" RCP . 44 42 LF $ 27.00 30 0 215 00 $ 5 805.00 86.01 % 3 48" Diameter Storm Manhole Base . 2 Each $ . 0 16.00 $ 480.00 36.02% 4 48" Storm Manhole Sidewall 12 VF $ 600.00 80 4.00 $ 2,400.00 200.00% 5 Manhole Frame 8 Cover 2 Each $ .00 290 00 28.67 $ 2,293.60 238.92% 6 Catch Basin, 104-8 3 Each $ . 2 400 3.00 $ 870.00 150.00°h 7 Catch Basin, 101-C 1 E h $ , .00 3.00 $ 7,200.00 100.00% 8 Insulation Board, 2-Inch 64 ac SF $ 2,250.00 9 Bedding Stone, 1"Clean 80 Ton $ 2.00 12 0 10 Backfill, Limestone l Sand 350 To $ . 0 76.75 $ 921.00 95.94% 11 Graded Stone Base 235 n Ton $ 6.50 11 98.34 $ 639.21 28.10 12 HMA Surface Course 80 T $ .00 245.11 $ 2,696.21 104.30% 13 PC Curb 8 Gutter 75 on LF $ 92.00 16 00 $85.30 $ 7,847.60 106.63% 14 TrafficControllSafety 1 LS $ . 1,050.00 7z.z5 1.00 $ $ 1,156.00 1,050.00 96.33% 100.00°h ,.: .': a ~ CN¢NGEcURDERS Sub Total ._ ~ , . $ 33.358.62 , «.._. No. Date Descrl lion Chan a Order Amount Total Chan a Order Amount 1 48" Diameter Flat-top Manhole, 1 each $ 200.00 $ 200.00 100.00% 2 Manhole Frame & Grate, 1 each $ 240.00 $ 240.00 100.00°~ 3 Catch Basin, 101-B, 1 each " $ 1 790.00 $ 1,790.00 100.00% 4 15 PVC, 12 LF @ $33.25/LF $ 399.00 $ 399.00 100.00°~ 5 Manhole Tap, Complete, 1 each " $ 700.00 $ 700.00 100.00°,6 6 7 PCC Pvmnt, Remove & Replace, 22.22 SY @ $49.00/SY $ 1 088.78 $ 1 088.78 100.00°~ 7 Additional Excavation-Invoice#1690 $ 3,510.00 $ 3,510.00 100.00% Sub Total $7,927.78 total Contrail Work Performed to Date: $ 33,358.61 otal Change Order Work Performed to Date: $ 7 927 7E otal Contract and Change Order Work Performed to Date: S 41,286.40 liscellaneous Costs $ n ineering $ 1142371 TOTAL FINAL PROJECT COSTS I hereby certify that the above statement shows, in detail, the cored amount of all work required to complete the above improvement. Michael Van Milligen, City Manager Dubuque,lowa / Gus Psihoyos, City Engineer Dubuque,lowa .--~ The Undersigned, ~"~"7~~~ r-~~'/t..~ ~rgntractor for the above improvement, does hereby accept the above'Total Due Contractor", as full settlementJ~for\all claims for said improvement. APPROVED: , ~ G ~y,,,,/ C~ ")< ~~ ~~~ ~ ~,,t( BY: ~~~ Dr`s THE C11Y OF DI7B City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563) 589-4270 PROJECT CLOSE OUT FORM r0)eC ame: HAWTHORNE ST. -SUTTON POOL STORM SEWER EXTENSION CIP Number: CIP # : 7201358 Project Contract Amount: $35,830.60 Pro ect Com letion Date: 26-oct-07 on ac or ame: rew ook & ons Contractor Address: 5200 Wolff 12oad City, State, Zip: Dubu ue,lowa 52002 Contractor Tele hone: 563-582-9292 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACTITEM OUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE ».>.>. ,,..... , 1 15" RCP 249.97 LF $ 27.00 215.00 $ 5,605.00 86.01% 2 18" RCP 44.42 LF $ 30.00 16.00 $ 480.00 36.02% 3 48" Diameter Storm Manhole Base 2 Each $ 600.00 4.00 $ 2,400.00 200.00% 4 48" Storm Manhole Sidewall 12 VF $ 80.00 28.67 $ 2,293.60 238.92°k 5 Manhole Frame & Cover 2 Each $ 290.00 3.00 $ 870.00 150.00°~ 6 Catch Basin, 104-B 3 Each $ 2,400.00 3.00 $ 7,200.00 100.00% 7 Catch Basin, 101-C 1 Each $ 2,250.00 8 Insulation Board, 2-Inch 64 SF $ 2.00 9 Bedding Stone, 1"Clean 80 Ton $ 12.00 76.75 $ 921.00 95.94 10 Ball, Limestone l Sand 350 Ton $ 6.50 98.34 $ 639.21 28.10% 11 Graded Stone Base 235 Ton $ 11.00 245.11 $ 2,696.21 104.30% 12 HMA Surface Course 60 Ton $ 92.00 $85.30 $ 7,847.60 106.63% 13 PC Curb 8 Gutter 75 LF $ 16.00 72.25 $ 1,156.00 96.33 14 Traffic Control /Safety 1 LS $ 1,050.00 1.00 $ 1,050.00 100.00 . 'a. , .:. C HAI~GE ORDERS . ~<:a,.,,w_- _: Sub Total $ 33,358.62 , No. Date Descrf lion Chan a Order Amount Total Chan a Order Amount 1 48" Diameter Flat-top Manhole, 1 each $ 200.00 $ 200.00 100.00% 2 Manhole Frame 8 Grate, 1 each $ 240.00 $ 240.00 100.00% 3 Catch Basin, 101-B, 1 each $ 1 790.00 $ 1,790.00 100.00% 4 15" PVC, 12 LF @ $33.25/LF $ 399.00 $ 399.00 100.00% 5 Manhole Tap, Complete, 1 each $ 700.00 $ 700.00 100.00°h 6 T' PCC Pvmnt, Remove 8 Replace, 22.22 SY @ $49.OOJSY $ 1 068.78 $ 1 088.78 100.00 7 Additional Excavation -Invoice #1690 $ 3,510.00 $ 3,510.00 100.00 Sub Total $7,927.78 Total Contract Work Performed to Date: $ 33,358.62 Total Change Order Work Performed to Date: $ 7,927.78 Total Contract and Change Order Work PeAonned to Date: $ 41,286.40 Miscellaneous Costs $ En ineerin $ 11,423.71 TOTAL FINAL PROJECT COSTS tY11 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager Dubuque,lowa Gus Psihoyos, City Engineer Dubuque,lowa LJV~+'s-~ ~ l.C O F~`~'~'k} G-%~ c ~ ractor fo the above The Undersigned, v improvement, does hereby accept the above'Total Due Contractor", as full settlement for all claims for said improvement. APPROVED: ~l.i~J (/C~~ ~~~ (y~XL w `~(/~ L BY: '-~ THE QIY OF DUB ~' City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563) 589-4270 II PROJECT CLOSE OUT FORM CIP Number: Project Contract Amount: STORM on ac or ame: rew ook & ons Contractor Address: 52DO Wolff Road City, State, Zip: Dubu ue, Iowa 52002 Contractor Tele hone: 563-5a2-9292 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE dew ,. »v. :':~£ _lira, ~~ .~ #IiKEFI z`«, - - _ 1 15" RCP 249 97 LF $ 27 00 215 00 $ 5 805 0 2 16" RCP . 44 42 LF $ . 30 00 . 16 00 $ , .0 86.01% 3 48" Diameter Stonn Manhole Base . 2 Each $ . 600 00 . 4 00 $ 480.00 2 36.02% 4 48" Storm Manhole Sidewall 12 VF $ . 80 00 . 28 67 ,400.00 2 293 200.00 5 Manhole Frame & Cover 2 Each $ . 290 00 . 3 00 $ , .60 7 238.92% 6 Catch Basin, 104-8 3 Each $ . 2 400 00 . 3 00 $ $ 8 0.00 7 2 150.00% 7 Catch Basin, 101-C 1 Each $ , . 2 250 00 . , 00.00 100.00% 8 Insulation Board, 2-Inch 64 SF $ , . 2 00 9 Bedding Stone, 1"Clean 80 Ton $ . 12 00 76 75 10 Backfill, Limestone /Sand 350 Ton $ . 6 50 . 98 34 $ $ 921.00 63 95.94% 11 Graded Stone Base 235 Ton $ . 11 00 . 245 11 9.21 28.10% ° 12 HMA Surface Course 80 Ton $ . 92 00 . $85 30 $ $ 2,696.21 7 104.30 ~ 13 PC Curb & Gutter 75 LF $ . 16 00 . ,647.60 1 106.63% 14 Traffic Control /Safety 1 LS $ . 1,050.00 72.25 1.00 $ $ ,156.00 1,050.00 96.33% 100.00% Sub Total $ 33,358.62 No. Date Descri lion Chan a Order Amount Total Chan a Order Amount 1 48" Diameter Flat-top Manhole, 1 each $ 200.00 $ 200.00 100.00% 2 Manhole Frame & Grate, 1 each $ 240.00 $ 240.00 100.00% 3 Catch Basin, 101-B, 1 each $ 1,790.00 $ 1 790.00 100.00°,6 4 15" PVC, 12 LF @ $33.25/LF $ 399.00 $ 399.00 100.00 5 Manhole Tap, Complete, 1 each $ 700.00 $ 700.00 100.00°~ 6 7" PCC Pvmnt, Remove & Replace, 22.22 SY C~ $49.OOISY $ 1 088.78 $ 1 088.78 100.00°k 7 Additional Excavation -Invoice #1690 $ 3,510.00 $ 3,510.00 100.00% Sub Total $7,927.78 Total Contract Work Performed to Date: $ 33,358.62 Total Change Order Work Performed to Date: $ 7 927 78 Totaf Contract and Change Order Work Performed to Date: S 41,288.40 Miscellaneous Costs $ En ineerin $ _ 11 423 71 TOTAL FINAL PROJECT COSTS~2,71<f27 .t1 1 hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager Dubuque, Iowa Gus Psihoyos, City Engineer Dubuque,lowa The Undersigned, "~"""""" ~-~'-'~ Tr~~'~~'~ngntractor f` o~t~bove improvement, does hereby accept the above 'Total Due Contractor", as full settleme+nt~~for1all claims for said improvement. APPROVED: f ~,LQ (,~ ~~~..'~~~~ (,ALL ~j ~L_ BY: ~~~ ~~~~