October 16, 2017
Consent Items # 16.
Hwy 20 Conduit - Wacker Drive to Hill Street Project
Acceptance
City Manager recommending acceptance of the public
improvement construction contract for the Hwy 20 Conduit
— Wacker Drive to Hill Street Project, as completed by
Volkens Inc.
RESOLUTION Accepting the Highway 20
Drive to Hill Street Project and authorizing
the contract amount to the contractor
Suggested Disposition: Receive and File;
Resolution(s)
Type
City Manager Memo
Resolutions
Supporting Documentation
Resolutions
Conduit - Wacker
the payment of
Adopt
THE CITY OF
Dui
Masterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Hwy 20 Conduit — Wacker Drive to Hill Street Project
DATE: October 9, 2017
Dubuque
bell
All -America City
'1Il1'
2007 • 2012 • 2013 • 2017
City Engineer Gus Psihoyos is recommending acceptance of the public improvement
construction contract for the Hwy 20 Conduit — Wacker Drive to Hill Street Project, as
completed by Volkens Inc., in the final contract amount of $53,250 and authorize
payment of the contract amount to Volkens Inc.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
[7M/ha krtn,
Michael C. Van Milligen
MCVM:jh
Attachment
cc: Crenna Brumwell, City Attorney
Teri Goodmann, Assistant City Manager
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer i
DATE: October 9, 2017
SUBJECT: Hwy 20 Conduit — Wacker Drive to Hill Street Project
Dubuque
bletd
All-Anaica City
11 111
2007 • 2012 • 2013
INTRODUCTION
The enclosed resolution provides for the acceptance of the public improvement
construction contract for the Hwy 20 Conduit — Wacker to Hill Street Project.
BACKGROUND
The project involved the repairing the conduit system between Wacker and Devon along
Hwy 20. The fiber conduit went through several small handholes in-between the
intersections and at the intersections the fiber and electrical ran through the same
handholes. This project removed 10 smaller handholes which in the past have been hit
by snow plows and have damaged the fiber with in the vault. At the intersection, the
contractor rerouted the fiber from electrical handholes and in some instances, install new
4' by 4' vaults. New fiber cable was installed into this repaired duct from Wacker Drive to
Grandview Avenue with the intent to install new fiber to Hill Street in the near future.
In accordance with Iowa Code § 384.103 and § 364.12(3)(c), and Iowa Code, Section
26.14, the City solicited informal bids for the Hwy 20 Conduit — Wacker to Hill Street
Project. The City received three (3) bids on May 30th, 2017 from the following
contractors:
Contractor
Volkens Inc.
Communication Innovators
McDermott Excavating
Bid Results
$ 53,250.00
$ 59,600.00
$ 67,350.00
Volkens Inc. of Dyersville, Iowa, submitted the low bid in the amount of $53,250.00.
DISCUSSION
The Hwy 20 Conduit — Wacker to Hill Street Project was completed by Volkens Inc., of
Dyersville, Iowa, in the final contract amount of $53,250.00.
RECOMMENDATION
I recommend that the City Council accept the improvements and authorize the payment
of the contract amount of $53,250.00 to Volkens Inc., for the Hwy 20 Conduit — Wacker
to Hill Street Project.
BUDGET IMPACT
The summary of project costs for the Hwy 20 Conduit — Wacker to Hill Street Project is
as follows:
Construction Contract
Total Project Cost
This project funding is as follows:
Award Final
$53,250.00 $53,250.00
$53.250.00 $53.250.00
CIP No. Fund Description
3001266 Traffic Signal Interconnect Conduit Replacement
Total Project Funding
Fund Amount
$53,250.00
$53.250.00
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolution to accept the
improvements and to authorize the payment of the contract amount of $53,250.00 to
Volkens Inc., for the Hwy 20 Conduit — Wacker to Hill Street Project.
Prepared by: Duane Richter, Traffic Engineer
cc: David Ness, Civil Engineer I
Jenny Larson, Budget Director
2
RESOLUTION NO. 345-17
ACCEPTING THE HIGHWAY 20 CONDUIT — WACKER DRIVE TO HILL STREET
PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO
THE CONTRACTOR
Whereas, the Public Improvement Contract for the Highway 20 Conduit — Wacker
to Hill Street Project (the Project) has been completed and the City Engineer has
examined the work and filed a certificate stating that the Project has been completed
according to the terms of the Public Improvement Contract and that the City Engineer
recommends that the Project be accepted; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved and the Project
is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from
the Traffic Signal Interconnect Conduit Replacement appropriations for the contract
amount of $53,250.00 less any retained percentage provided for therein as provided in
Iowa Code chapter 573, and to pay such retainage only in accordance with the
provisions of Iowa Code chapter 573.
Passed, approved and adopted this 16th day of October 2017.
Attest:
Kevin%
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE HIGHWAY 20
CONDUIT — WACKER DRIVE TO HILL STREET PROJECT
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the Highway 20 Conduit — Wacker to Hill Street Project, that the
Project has been performed in compliance with the terms of the Public Improvement
Contract, and that the total cost of ee completed work is $53,250.00.
Dated this day of /4/ ///, 2017.
Filed in the office of the City Clerk on the
Gus Psihoyos, City Engier