Loading...
Hwy 20 Conduit - Wacker Drive to Hill Street Project AcceptanceCity of Dubuque ITEM TITLE: SUMMARY: SUGGESTED DISPOSITION: ATTACHMENTS: Description Hwy 20 Conduit -MVM Memo Staff Memo Engineer's Certificate of Completion Resolution Copyrighted October 16, 2017 Consent Items # 16. Hwy 20 Conduit - Wacker Drive to Hill Street Project Acceptance City Manager recommending acceptance of the public improvement construction contract for the Hwy 20 Conduit — Wacker Drive to Hill Street Project, as completed by Volkens Inc. RESOLUTION Accepting the Highway 20 Drive to Hill Street Project and authorizing the contract amount to the contractor Suggested Disposition: Receive and File; Resolution(s) Type City Manager Memo Resolutions Supporting Documentation Resolutions Conduit - Wacker the payment of Adopt THE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Hwy 20 Conduit — Wacker Drive to Hill Street Project DATE: October 9, 2017 Dubuque bell All -America City '1Il1' 2007 • 2012 • 2013 • 2017 City Engineer Gus Psihoyos is recommending acceptance of the public improvement construction contract for the Hwy 20 Conduit — Wacker Drive to Hill Street Project, as completed by Volkens Inc., in the final contract amount of $53,250 and authorize payment of the contract amount to Volkens Inc. I concur with the recommendation and respectfully request Mayor and City Council approval. [7M/ha krtn, Michael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer i DATE: October 9, 2017 SUBJECT: Hwy 20 Conduit — Wacker Drive to Hill Street Project Dubuque bletd All-Anaica City 11 111 2007 • 2012 • 2013 INTRODUCTION The enclosed resolution provides for the acceptance of the public improvement construction contract for the Hwy 20 Conduit — Wacker to Hill Street Project. BACKGROUND The project involved the repairing the conduit system between Wacker and Devon along Hwy 20. The fiber conduit went through several small handholes in-between the intersections and at the intersections the fiber and electrical ran through the same handholes. This project removed 10 smaller handholes which in the past have been hit by snow plows and have damaged the fiber with in the vault. At the intersection, the contractor rerouted the fiber from electrical handholes and in some instances, install new 4' by 4' vaults. New fiber cable was installed into this repaired duct from Wacker Drive to Grandview Avenue with the intent to install new fiber to Hill Street in the near future. In accordance with Iowa Code § 384.103 and § 364.12(3)(c), and Iowa Code, Section 26.14, the City solicited informal bids for the Hwy 20 Conduit — Wacker to Hill Street Project. The City received three (3) bids on May 30th, 2017 from the following contractors: Contractor Volkens Inc. Communication Innovators McDermott Excavating Bid Results $ 53,250.00 $ 59,600.00 $ 67,350.00 Volkens Inc. of Dyersville, Iowa, submitted the low bid in the amount of $53,250.00. DISCUSSION The Hwy 20 Conduit — Wacker to Hill Street Project was completed by Volkens Inc., of Dyersville, Iowa, in the final contract amount of $53,250.00. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $53,250.00 to Volkens Inc., for the Hwy 20 Conduit — Wacker to Hill Street Project. BUDGET IMPACT The summary of project costs for the Hwy 20 Conduit — Wacker to Hill Street Project is as follows: Construction Contract Total Project Cost This project funding is as follows: Award Final $53,250.00 $53,250.00 $53.250.00 $53.250.00 CIP No. Fund Description 3001266 Traffic Signal Interconnect Conduit Replacement Total Project Funding Fund Amount $53,250.00 $53.250.00 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $53,250.00 to Volkens Inc., for the Hwy 20 Conduit — Wacker to Hill Street Project. Prepared by: Duane Richter, Traffic Engineer cc: David Ness, Civil Engineer I Jenny Larson, Budget Director 2 RESOLUTION NO. 345-17 ACCEPTING THE HIGHWAY 20 CONDUIT — WACKER DRIVE TO HILL STREET PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Highway 20 Conduit — Wacker to Hill Street Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Traffic Signal Interconnect Conduit Replacement appropriations for the contract amount of $53,250.00 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 16th day of October 2017. Attest: Kevin% CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE HIGHWAY 20 CONDUIT — WACKER DRIVE TO HILL STREET PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Highway 20 Conduit — Wacker to Hill Street Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of ee completed work is $53,250.00. Dated this day of /4/ ///, 2017. Filed in the office of the City Clerk on the Gus Psihoyos, City Engier day o , 2017. vin Firnstahl, CMC, City Clerk