Five Flags Theater Masonry Rehabilitation Project
Acceptance
City Manager recommending acceptance of the
construction contract for the Five Flags Theater Masonry
Rehabilitation Project as completed by Hydro -Tech Inc.
RESOLUTION Accepting the Five Flags Theater Masonry
Rehabilitation and authorizing the payment of the contract
amount to the contractor
Suggested Disposition: Receive and File; Adopt
Resolution(s)
ATTACHMENTS:
Description
Five Flags Theater Masonry Rehab -MVM Memo
Staff Memo
Resolution
FF - 563 Design Completion Letter
FF Pay Application
Engineers Certificate
Type
City Manager Memo
Resoluti ons
Resoluti ons
Supporting Documentation
Supporting Documentation
Supporting Documentation
Masterpiece on the Mississippi
Dubuque
itatbd
ul•IVeHa City
''11i,
2007.2012
2013.2017
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Five Flags Theater Masonry Rehabilitation Final Payment and Acceptance
(C I P 350-2511 and 350-1708)
DATE: October 29, 2017
Leisure Services Manager Marie Ware is recommending acceptance of the construction
contract for the Five Flags Theater Masonry Rehabilitation Project, as completed by
Hydro -Tech Inc., in the final contract amount of $311,952, which was $32,852 over the
bid amount due to additional square footage re -pointing, replacement of four additional
steel linters, painting existing doors and lentils and removal of an existing window and
infill with bricks.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Michael C. Van Milligen"
MCVM:jh
Attachment
cc: Crenna Brumwell, City Attorney
Teri Goodmann, Assistant City Manager
Cori Burbach, Assistant City Manager
Marie L. Ware, Leisure Services Manager
Masterpiece on the Mississippi
Dubuque
*Muria 6ih
III II
2007 2012
2013.2017
TO: Michael C. Van Milligen, City Manager
FROM: Marie L. Ware, Leisure Services Manager
SUBJECT: Five Flags Theater Masonry Rehabilitation Final Payment and Acceptance
(CIP 350-2511 and 350-1708)
DATE: October 18, 2017
INTRODUCTION
The enclosed resolution provides for the acceptance of the construction contract for the
Five Flags Theater Masonry Rehabilitation which has been completed.
BACKGROUND
Five Flags Theater is on the National Register of Historic Places. It is an important
community treasure. The Five Flags Theater is owned by the City of Dubuque and
operated on a day-to-day basis by SMG Management. As a part of the management
agreement the City is responsible for capital improvements of Five Flags Theater.
Restoration of the envelope of historic structures is important to the long-term
sustainability of the structure itself both inside and outside. The fire escape is a working
fire escape for the theater.
Selser Schaefer Architects and WSAIModern Ruins were hired to provide architectural 1
engineering services. The first step was to evaluate both the Five Flags Theater and
Mathias Ham House prior to developing bid specifications. For Five Flags Theater the
report shows masonry rehabilitation was needed and the need to solve water issues at
the roof that create problems with the structure and masonry.
The consultants took a holistic view by not only looking at the current structures and the
masonry rehabilitation but also looking at the root causes of degradation of the
structures. The report was used in preparation of the attached bids and specifications.
The work for this project will include masonry rehabilitation repointing areas on all four
sides of the Theater, repairs to ornamental cornice, modification of roof in one area
drain properly, camel back copings repaired, fire escape and landing repairs, and
general coping repairs.
The City received formal competitive quotations for the Five Flags Theater Masonry
Rehabilitation Project on March 23, 2017. Hydro -Tech Inc. submitted the low bid in the
amount of $279,100. The project was awarded to Hydro -Tech Inc. based on a
competitive quotation process for public improvements in accordance with Iowa Code,
Section 26.14.
DISCUSSION
The Five Flags Theater Masonry Rehabilitation was completed by Hydro -Tech Inc. in
the final contract amount of $311,952. One change order was approved with a
deduction of $750 for less square footage re -pointing on the east elevation, additional
square footage re -pointing on the south elevation totaling $12,182, replacement of 4
additional steel lintels at a cost of $9340, painting existing doors and lintels at $3950,
removal of an existing window and infill with bricks at $3060 and resetting bricks directly
below coping stones at $4320. This change order totaled $32,852.
BUDGET IMPACT
The cost summary for the Five Flags Theater Masonry Rehabilitation is as follows:
Architectural Services
Construction Contract
Total Project Cost
The project funding summary is as follows:
Award Final
$ 39,300 $ 33,070
$ 279,100 $ 311,952 I
$ 318.400 $ 345.022 I
CIP No. Amount
3501708 Theater — Tuckpointing Exterior $ 244,416
3502511 Theater — Fire Escape $ 35,000
3501212 Ham House Tuckpointing $ 65,606
Total Project Funding $A4A,IM
ACTION TO BE TAKEN
I respectfully request that the City Council adopt the attached resolution accepting
improvements and authorize payment for the contract amount of $311.952.00 to Hydro -
Tech Inc. for the Five Flags Theater Masonry Rehabilitation Project.
cc: Jenny Larson, Budget Director
RESOLUTION NO. 350-17
ACCEPTING THE FIVE FLAGS THEATER MASONRY REHABILITATION AND
AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE
CONTRACTOR
Whereas, the Five Flags Theater Masonry Rehabilitation (the Project) has been
completed and the City Engineer has examined the work and filed a certificate stating
that the Project has been completed according to the terms of the Public Improvement
Contract and that the City Engineer recommends that the Project be accepted; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved and the Project
is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from
the Five Flags Theater Masonry Rehabilitation Capital Improvement appropriation for
the contract amount of $311,952.00 Tess any retained percentage provided for therein
as provided in Iowa Code chapter 573, and to pay such retainage only in accordance
with the provisions of Iowa Code chapter 573.
Passed, approved and adopted this 6th day of November, 200 7.
(Ro D. Buol, Mayor
Attest:
Kevti�n S. Firristal5l, Cititlerk
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE FIVE FLAGS
THEATER MASONRY REHABILITATION PROJECT
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the Five Flags Theater Masonry Rehabilitation Project, that the Project
has been performed in compliance with the terms of the Public Improvement Contract,
and that the total cost of the completed work is $311,952.
Dated thi qday of '/,? ,r, 2017.
Filed in the office of the City Clerk on the
day of
City Engineer
,2017.
Keri S. FirnstafiI, City Clerk
HI
DESIGN
240 West 2nd Street
Dubuque, Iowa 52001
563design corn
Marie Ware
Leisure Services Manager
City of Dubuque
2200 Bunker Hill Road
Dubuque, IA 52001
16 October 2017
Re: Five Flags Theater Masonry Rehabilitation and Fire Escape Project
CI P 350-1708, 350-2511
Project Certification
563 Design Project Number: 1705
Dear Marie:
In accordance with the Contract Documents, based on on-site observations and inspections and the
data compromising the Contractor's application, the Architect/Engineer certifies that to the best of
its knowledge, information and belief the Work has been completed in substantial compliance with
the plans and specifications, and the quality of the Work is in accordance with the Contract
Documents. 563 Design PLLC does not have knowledge of any outstanding work or payments.
The final project construction cost including Change Order 1 final is $311,952.00.
We have included copies of the Contract Payment No. 2 in the amount of $172,867.00 and Change
Order No. 1 Final for city approval. The change order documents the differences between the
original contract Scope of Work and final Scope of Work.
We recommend The City of Dubuque approve Contract Payment #2 and Change Order No.1 Final.
We also recommend The City of Dubuque approve and accept the Five Flags Theater Masonry
Rehabilitation and Fire Escape Project. Retainage in the amount of $15,598.00 will be held for 30
days after acceptance and paid at the time provided no claims from others are filed. We will process
Contract Payment No.3 Final for the retainage due to the contractor at the appropriate time.
Sincerely,
563 Design
„7///'
Andrew McCready, Registered Architect
Principal
CONTINUATION SHEET
AIA 1'..om,e,rt ,37110 AFFLDOATLIT AITL''011 TIFD'ATI STF F FAYME11T onrta,w„e
_.nrt,atnn' ,ed e ert,fmah'm,: attache.'
In ta4ulah'naL el''a m„„,,,,t ate vtale11'' the neatest d. Ila,
Use l'hbum, I _.mhact: whet e „mmtle,emvmee f.n line item: may apply
LLLLYIFI I V II V h vo V Yh.
Schedule of Values
2 1,8'b,Icamm
3 '3e„e,al n,Lhm.
J
6
v North Elevation
8 Cleaning
9 Pev,'lrt,'m
10 F elav: awl ella,eme,rt
11
12
13
14 South Elevation
15 Cleaning
16 Pev,'lrt,'m
17 F elav: awl ella,eme,rt
18
19
20
21 East Elevation
22 Cleaning
23 Pev,lrt,”,
24 Repasts and Replacement
25 Metal 71r''1
26
27
28 West Elevation
29 Cleaning
30 Pev,'lrt,'m
31 F elav: awl ellateme„t
32
33
34
3s Fire Escape Repairs
36 I elan:
37 1'm,rtme
38
39
40
41
42 Change Orders
43 Change ge ade, q111
44
45
46
47
48
49
50
51
52
53
AL4 DOC LTA TENT G- 03
APPLICATION NO 002 Final
APPLICATION DATE 08-22-201'
PERIOD TO 08-31-201'
ARCHITECT'S PROJECT NO Five Flags Theater, Iowa
1 E F G 11 1
LL HLL'VLLL' Warm. L VMMFLL 111 MnI LYLnLL 1 V I±,L YnLe1lL1 Y.1I JIler'JL
V±LLJE hM.L'M 1Y.1v ILl'L IHE, PhMIL itr PRE0EIRLT JOMPLETED 113 Li TO FINISH !IF YnPInFLE
nPPLICnTIOII STOPED nilr' STOPED 10 '„ R TE,
ID+11 !HOT III TO DnTE
D OR1' iD+E+Fi
84 51111 1111
4111 IN
80 373 1111
811 740 1111
811 740 1111
815'.5„"'
8P^1111111
807 "111
80 373 1111
81055"1111
740 1111
84 107 1111
85 500 1111
811 1 4 1111
811 104 1111
841 051111
807 "111
85. 05_ ""
GRAND TOTALS 1511'501111
51111 1111
1:431111
4511 IN
81411'''"'
80 373
7411111
7411111
844551111
41111111
81741111111
1.51111
81 75, 1111
8504x1111
8'415 1111
807"1111111
85.05_ 1111
11.3407 1111 81004091"1
84 Om ti
$_541111111
80 3731111
810 74t 1111
810 74t 1111
815^„1111
8.7"1111111
8.7"1111111
80 3731111
81055^ 1111
81174,11111
84 107 1111
85 5001111
811141111
8111,141111
841 Pg. u" 11111 1111
807"luau 11111 1111
830050'''' 1"" HIP!!!
8311 "50''' 11111'"w, lu au
Users may obtain validation of this document by requesting of the license a completed AIA Document D401 - Certification of Document's Authenticity
200 06-5 212
8703-1992
THE CITY OF
DuB
Masterpiece on the Mississippi
June 29, 2017
Andrew McCready
563 Design
240 West 2nd Street
Dubuque, Iowa 52001
Dear Andrew,
Dubuque
All -America City
1 I
2007 • 2012 • 2013
Leisure Services Department
2200 Bunker Hill Road
Dubuque, IA 52001
Office (563) 589-4263
Fax (563) 589-4391
www cityofdubuque org
I have reviewed Proposal Request #01 R for the Five Flags Theater Masonry
Rehabilitation and Fire Escape Project. The City of Dubuque wishes to accept the
proposal. We authorize the contractor to do the work outlined understanding that the
percentages may vary by a small amount.
You may inform Hydro Tech Inc. to proceed.
Sincerely,
Viievw
Marie L. Ware
Leisure Services Manager
Service People Integrity Responsibility Innovation Teamwork
08 June 2017
Proposal Request #01R for:
Five Flags Theater
Masonry Restoration and Fire Escape Project
405 Main Street
Dubuque, IA 52001
Project Number 1705
Project Manual Issue 01; dated 10 February 2017.
Drawings Issue 01; dated 10 February 2017.
The contents of this Proposal Request #01 supersede and supplement all portions of the above
referenced bidding documents with which Proposal Request #01 conflicts.
ARCHITECTURAL
A102 — EXTERIOR ELEVATIONS AND VIEW
Al — EXISTING EAST ELEVEATION
• Item 1 — Revised square footage percentage of re -pointing per the following:
o 7% of field red and beige brick is required. Equals a 3% reduction in square
footage calculation. Main Street Credit of 3% from base bid = 50 SF @ $15 per SF = $750.00
Credit applied towards this PR/C01 pricing for additional repointing needed.
Al Item 1
A103 — EXTERIOR ELEVATIONS AND VIEW
Al — EXISTING SOUTH ELEVEATION
• Item 1 — Revised square footage percentage of re -pointing per the following:
o See attached exhibits for areas A, B and C.
■ Area A
99 SF@ 75% = 74.25 SF
99 SF@ 90% = 89.1 SF
49 SF@ 40%=19.6 SF •
99 SF@ 90% = 89.1 SF
82.5 SF@ 40% = 33 SF
•
•
•
•
• Area
126 SF@ 75%=94.5 SF •
210 SF@ 90%=189.5 SF •
84 SF@ 40% = 33.6 SF
•
100% of parapet re -pointing is required
o Currently documented at 25%
100% of additional red brick re -pointing is required
o Currently documented at 10%
50% of white brick band re -pointing is required
o Currently documented at 10%
100% of red brick band re -pointing is required
o Currently documented at 10%
50% of white brick band re -pointing is required
o Currently documented at 10%
100% of parapet re -pointing is required
o Currently documented at 25%
100% of additional red brick re -pointing is required
o Currently documented at 10%
50% of white brick band re -pointing is required
o Currently documented at 10%
Five Flags Theater 08 June 2017 Page 1 of 2
Masonry Restoration and Fire Escape Project Proposal Request#01R
405 Main Street
Dubuque, IA 52001
■ Area C
224SFO 75%=168 SF •
180 SF@40%=72 SF •
Areas A, B and C total 862.15 SF minus
credit of 50 SF on item Al for a total of
812.15 SF 1$12,182 1
100% of parapet re -pointing is required
o Currently documented at 25%
50% of additional red brick re -pointing is required
o Currently documented at 10%
• Item 2 — Replacement of 4 additional steel lintels above door openings and associated
masonry work for replacement of lintel. Entire lintel to be painted prior to install.
Removal and replacement. prime, paint, brick reset 4 EA =
• Item 3 — Paint existing doors and lintels
Prep, prime, paint doors and lintels 8 EA=
• Item 4 — Remove existing window on the upper left portion of the elevation and infill with
brick using replacement bricks.
Remove window, prep and infill 1 EA =
• Item 5 — Provide unit cost for re -setting brick directly below coping stones.
$ 3,9501
$9,340
$ 3,060
$48 per SF
I90SFX$48=
$4,320
END OF PROPOSAL REQUEST 01
TOTAL = $32,852
Five Flags Theater 07 June 2017 Page 2 of 2
Masonry Restoration and Fire Escape Project Proposal Request #01 R
405 Main Street
Dubuque, IA 52001