Downtown Master Plan ConsulantTO:
FROM:
SUBJECT:
MEMORANDUM
August13,2002
The Honorable Mayor and City Council Members
Michael C. Van Miiligen, City Manager
Consultant Recommendation for Downtown Master Plan
The Downtown Master Plan Consultant Selection Committee, comprised of Dave Rusk,
Long Range Planning Advisory Commission; Bob Felderman, Dubuque Main Street,
Ltd.; Dan LoBianco, Dubuque Main Street, Ltd.; Dick Wertzberger, Chamber of
Commerce; David Harris, Housing and Community Development Director; Cindy
Steinhauser, Assistant City Manager; and Laura Carstens, Planning Services Manager,
evaluated nine proposals received for consultant services related to the Downtown
Master Plan. The committee interviewed the top four firms.
In December 2001, the City Council adopted Vision Downtown, a community consensus
for our city center. In March 2002, the City Council approved a $100,000 budget for
creation of a Downtown Master Plan based on the vision. The budget includes
consultant services and public relations, printing, distribution, etc. The City has
allocated $50,000 of City funds for the project. The Downtown Planning Committee is
committed to raising the remaining $50,000.
The master planning process will take 9 to 12 months to complete these four steps:
1)
2)
3)
4)
Assess conditions and identify issues.
Conduct a market analysis of downtown Dubuque.
Establish community involvement
Develop a Downtown Master Plan with a unified implementation strategy.
The Consultant Selection Committee recommends that the City retain the Leland
Consultant Group for $98,900, subject to procurement of the necessary funding.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
~Mi~lligen~
MCVM/jh
Attachment
CC:
Barry Lindahl, Corporation Counsel
Cindy Steinhauser, Assistant City Manager
Laura Carstens, Planning Services Manager
MEMORANDUM
August 13, 2002
TO:
FROM:
SUBJECT:
Michael C. Van Milligen, City Manager
Laura Carstens, Planning Services Manager~'~t'-'~
Consultant Recommendation for Downtown Master Plan
INTRODUCTION
This memo transmits the recommendation of the Downtown Master Plan Consultant
Selection Committee. The committee recommends that the City retain the Leland
Consulting Group for this project, subject to procurement of the necessary funding. A
resolution is enclosed.
BACKGROUND
In December 2001, the City Council adopted Vision Downtown, a community
consensus for our city center. In March 2002, the City Council approved a $100,000
budget for creation of a Downtown Master Plan based on the vision. The budget
includes consultant services and public relations, printing, distribution, etc. The City
has allocated $50,000 of City funds for the project. The Downtown Planning Committee
is committed to raising the remaining $50,000.
The master planning process will take 9 to 12 months to complete these four steps:
1)
2)
3)
4)
Assess conditions and identify issues.
Conduct a market analysis of downtown Dubuque.
Establish community involvement
Develop a Downtown Master Plan with a unified implementation strategy.
DISCUSSION
In June 2002, a request for proposal was distributed to about 75 planning firms
nationwide. The Committee evaluated the nine proposals received in July 2002. In
August 2002, the top four firms were interviewed by these committee members:
Downtown Planning Committee
Dave Rusk, Long Range Planning Advisory Commission
Bob Felderman, Dubuque Main Street, Ltd.
Dan LoBiance, Dubuque Main Street, Ltd.
Dick Wertzberger, Chamber of Commerce
Consultant Recommendation for Downtown Master Plan
August13,2002
Page 2
City Staff
David Harris, Housing and Community Development Director
Cindy Steinhauser, Assistant City Manager
Laura Carstens, Planning Services Manager
RECOMMENDATION
The Consultant Selection Committee recommends the team lead by Leland Consulting
Group for the Downtown Master Plan, The Downtown Planning Committee concurs.
The Leland team offers an advantageous blend of national and regional experience
with local understanding. They also offer a synergy with other downtown studies.
Project co-managers Anne Ricker and Bill Cunningham of Leland Consulting Group
prepared the economic analysis for the Port of Dubuque Master Plan. This included
research of the Downtown Dubuque market.
The Leland team includes consultants who are familiar with downtown Dubuque -
URS/BRW of Minneapolis and two Dubuque firms: MSA Associates and Durrant Group.
The URS/BRW principals are Bob Kost and Dan Meyer. Bob has been project manager
for design of the Mississippi Riverwalk and for the Port of Dubuque Master Plan and
Design Standards. He is also on the URS/BRW team selected for the Downtown
Dubuque Transit Analysis Alternatives Study. Dan Meyer is the project manager for the
Transit Study, which allows seamless integration of these two downtown projects.
Jim Holz of MSA Associates is part of the design team for the Education and
Conference Center. He served on the Downtown Planning Committee dudng the
visioning process. Jim also is part of the URS/BRW team for the Transit Study.
Kevin Eipperle of the Durrant Group helped with planning for the Vision Iowa application
for the America's River project. He is on the design team for the Mississippi River
Discovery Center and the Main Street Reconstruction Project. Kevin also was project
manager for creation of design guidelines for the historic districts in and around
downtown Dubuque.
The Consultant Selection Committee was impressed by the commitment of the Leland
team to build on the vision, to focus on real solutions, and to concentrate on
implementation.
REQUESTED ACTION
The Consultant Selection Committee recommends a contract for services with Leland
Consulting Group for $98,900, subject to procurement of the necessary funding.
LC/mkr
Attachments
Attest:
Prepared by: Laura Carstens, City Planner Address: City Hall, 50 W. 13th St Telephone: 589-4210
RESOLUTION NO. 423-02
RESOLUTION AUTHORIZING CONTRACT FOR SERVICES FOR
PREPARATION OF DOWNTOWN MASTER PLAN
Whereas, the City Council has made preparation of a Downtown Master Plan a
priority; and
Whereas, proposals for master planning services have been requested, received
and evaluated; and
Whereas, the City Council has allocated $50,000 towards this project.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The City Council hereby selects the Leland Consulting Group's
proposal for preparation of the Downtown Master Plan.
Section 2. The Planning Services Manager hereby is directed to serve as the
City's project manager and point of contact for this project.
Section 3. The Planning Services Manager hereby is authorized to negotiate a
contract for services with Leland Consulting Group in an amount not to exceed $98,900
subject to the procurement of the necessary funds.
Passed, approved and adopted this 19th day of August 2002.
Terrance M. Duggan, Mayor
Jeanne F. Schneider, City Clerk
PROPOSAL FOR SERVICES:
28 JUNE 2002
DOWNTOWN DUBUQUE MASTER PLAN
DUBUQUE, IOWA
PREPARED FOR:
CITY OF DUBUQUE
DUBUQUE MAINSTREET, LTD.
IOWA MAINSTREET
DUBUQUE CHAMBER OF COMMERCE
PREPARED BY:
LELAND CONSULTING GROUP
694 SOUTH GAYLORD STKEET · DENVER, COLORADO 80209
303.458.5800 PHONE · 803.458.5420 FAX
WWW.LELANDCONSULTING.COM
tN ASSOCIATION WITH:
URS CORPORATiON
MSA PROFESSIONAL SERVICES
Dur<rokNT
LELAND CONSULTING GROUP
www. lelandconsulaing, com
ph 503. 22z 1600
fl 503. 222. 5078
694 Sou& Gaylord Strem
ph 303. 458. 5800
)~ 303. 458. 5420
ph 858. 509. 1693
3% 858 509. 0274
28 Jtme 2002
Ms. Laura Carstens
Planning Services Manager
CITY OF DUBUQUE
50 West 13m Street
Dubuque, Iowa 52001
Dear Ms. Carstens:
On behalf of Leland Consulting Group (LCG), Real Estate Strategists, URS
Corporation (URS), Urban Design, Transportation Planning and Public Engagement,
MSA Professional Services, Inc. (MSA), Community Planning, and Durrant,
Architecture and Visualization (the LCG Team), we are pleased to present this
proposal to assist the City of Dubuque, Main Street Ltd., Main Street Iowa, Dubuque
Chamber of Commerce, and Downtown Planning Committee (the client team) with
preparation of economic redevelopmmat strategies for downtown. This analysis will
provide the client tean~ and other project advocates with recommendations which
will produce tangible results, and in/ormat/on which will lead to careful investment
and a weE-served market.
UNDERSTANDING OF THE SITUATION
It is an undisputed tx"ath that a communitfs downtown is the barometer of its
overall quality-of-life. Area-wide and local chamber of commerce executives,
economic development specialists, and industry recruiters have found time and
again that projects are often won or lost based on one single criterion - the condition
and economic health of a community's downtown. Employers have found that a
vibrant downtown significantly increases their ability to attract and retain high
quality employers - whether or not the business is located in downtown - thereby
minim/zing turnover and associated personnel costs. City officials have found that
bond rating companies often include the economic prosperity of downtowns as one
criterion they consider when determining a city's bond rating.
Throughout the comntry, public and private entities are participating in the
revitalization of theft downtown core. In a report prepared for the American Public
Power Association, several utility companies surveyed expIained the basis for their
participation in downtown enhancement efforts, incinding the following: a thriving
downtown is a good recruitment tool for industry; downtown's enliancement
stimulates the economy and adds jobs; economically, everyone benefits from a
boalthy downtown; a viable downtown infrastructure is essential to economic
developme~t in the whole area; a better downtown increases tourism in the area;
and, downtown is a good investment. Cities tlxroughout the country who have
undertaken s/milar efforts have found that benefits to the community are multi-
faceted and multiplicative. Specifically, quality of life is enhanced., the number and
diversity of job opporturdties axe increased., and dollars are invested.
·
Real Estate S~'ateg:~ts
LELAND CONSULTING GROUP
CITY OF DUBUQUE
28 JUNE 2002
PAGE 2
The City of Dubuque, together with community stakeholders, are seeking the
assistance of professionals experienced in understanding the unique opportunities
and challenges presented by the downtown environment.
Specifically, you are seeking the assistance of experts who can work with the
commurdty to develop econonuc redevelopment strategies for the execution and
implementation of projects, progTams and policies which will effectively and
protitably leverage investment downtown over the near- and long-term.
PROJECT APPROACH
The LCG Team's approach to downtown revitalization efforts such as this is to
develop an understanding of the demands of the marketplace, barriers to investment
(regulatory, financial, physical and market), and valued assets of the environs, while
educating and building support. The identification of "cheerleaders" who will carry
the downtown banner and implement the actions identified through this process will
be critical to the success of the strategies
CONSULTANT TEAM
The consultant team assembled to accomplish the project goals is led by Leland
Consulting Group (LCG). LCG is a rmtional organization with a reputation
spannmg more than 30 years. Because of extensive cross-training in market research,
financial analysis, economic development, planning, public policy and real estate
development, the principals of LCG bring a high level of reality and practical
experience to their assignments. In total, the firm has completed more than 1,500
assignments throughout the United States. Among these are downtown
reinvestment efforts for: Lincoln, Nebraska; Des Moines, Iowa; Dubuque, Iowa
(waterfront); Colorado Springs, Colorado; Montrose, Colorado; Portland, Oregon;
Bend. Oregon: Fort Worth, Texas; Midland, Texas; and Corpus Christi, Texas. LCG
was recently hh'ed by the City of Cedar Rapids, Iowa to complete a downtown
housing strategy.
As a principal-intensive organization, our clients are assured that only senior level
professionals wilt direct and conduct the work. We feel that assignments such as this
deserve the time and focus of seasoned professionals whose years of judgment and
experience bring substantial added value to the process. We are committed to
bringing this assignment to a successful conclusion, and we believe that our
experience and qualifications appropriately demonstrate our capacity to make these
assertive statements.
Submit-ting with us is UR$ Corporation. URS has a long history of serving public
and private sector clients throughout the western United States - providing urban
desto, transportation plmming, and public facilitation expertise for a wide variety of
LELAND CONSULTING GROUP
CITY OF DUBUQUE
28JUNE2002
PAGE3
commtmity revitalization projects. The principals of LCG Denver and URS have
recently worked together on several commmnity-wide initiatives designed to build
support and encourage private investment.
Local firms who have joined the team include MSA, as a local planning and
engineering contact, and Durrant, architects and specialists in communication.
We believe this successful teaming relationship is based on an approach to projects,
which is nearly seamless, and a philosophy, which is one and the same. Member
firms are committed to the built environment and the delivery of projects to the
market. Collectively, we promote and deliver plans that are implementable.
CONCLUSION
h~ summary, we are excited by the opportunity to work with you and your
community. As experienced advisors to public sector clients throughout the United
States, we understand how to take a project such as this from inception to completion
- moving from the general to the specific, building support along the way and
ending with a project that is responsive to market and economic realities, as well as
commtmity desires. The firm's core practice is working for commtmities preparing
infili strategies and transit-supportive and downtown revitalization programs for
rural and urban communities throughout the Midwest and Western United States.
For this reason, we maintain the availability for our principals to work on projects
such as this one.
If you have any questions regarding this submittal, please contact either Anne Ricker
or Biff Cmmingham at 303.458.5800. Both of these individuals are authorized to
execute an agreement on behalf of Lelm~d Consulting Group.
Sincerely,
~,E~ CONSUL~NG GROUP
Anfie B. Ricker
Principal
Contact Information:
Anne B. Ricker
694 South Gaylord S~reet
Denver, CO 80209
303.458.5800 p
303.458.5420 f
aricker@lcgdenver.com
Big J. Ctmningham
694 South Gaylord Street
Denver, CO 80209
303.458.5800 p
303.458.5420 f
bcmmingham@Ic gdenver .corn
DOWNTOWN DUBUQUE MASTER PLAN
TABLE OF CONTENTS
SECTION I.
S~CT~ON II.
SECTION III.
PROJECT TEAM FIRM OVERVIEWS
RESUMES OF KEY ]PROJECT PERSONNEL
PROJECT EXPERIENCE AND REFERENCES
SECTION IV. PROJECT APPROACH
Understanding and Approach
Work Tasks
1.0 Project Orientation and Initiation
2.0 Capacity of the Delivery System Analysis
3.0 Planning Workshop / Retreat
4.0 Market Indicators and Trends
5.0 Identification of Niche Opportunities
6.0 Concept Phn Refinement / Design Recommendations
7.0 Positioning and Investment Strategies
8.0 Implementation Strategy and Final Plan
10.0 Public Open House and Presentation
SECTION V.. PROJECT SCHEDULE
PROJECT TEAM FIRM OVERVIEWS
[] £eland Consulting Group, Real Estate Strategists
LELAND CONSULTING GROUP
Introduction to the Firm
H'elping clients succeed. That's the guiding
.principle behind Letand Consulting Group, a
consulting firm dedicated to providing the best in client
service.
What began as a real estate consulting practice has come
to include a wider range of strategy, financial, and
management services as principals with varied
backgrounds havejoined the firm. Our cure focus
remains--Leland Consulting Group continues to focus
on enhancing opportunities, solving problems, reducing
risk and adding value. Leland Consulting Group
provides the following services:
· ' Market research
· Public/Private partnership strategies
Due diligence
Feasibility analysis
Economic and environmental impact analysis
Site selection and purchase negotiations
Market and Implementation strategies
Project management for development
Development strategies and programming
Economic development
Public approvals
· Deal structuring
Leland Consulting Group, Real Estate Strategists, is a regional firm with offices in Portland,
Oregon, Denver, Colorado and San Diego, California. The group is comprised of urban
economists, real estate market analysts, planning and development advisors and project managers
who specialize in analyzing market and economic factors that affect public and private sector
development. Our business objective is to bring a high level of reality and practical experience to
our assignments. We accomplish this through extensive cross-training in market research,
economic analysis and development. The firm and its principals have completed more than 3,000
real estate and economic consulting assignments for public and private sector organizations. This
industry exposure has built a rich base from which to draw focused experience that is thoughtfully
applied to each project.
· RealEstateStrategi~ts
LELAND CONSULTING GROUP
Scope of Experience
Leland Consulting Group has significant real estate advisory experience with the following types
of real estate:
Housing:
Single-Family Detached
Single-Family Attached
Garden Apartments
Low-Rise, High Density
Condominiums
Row Houses
Second Homes & Resorts
Loft Housing
Subdivisions
Senior & Low-Income Housing
Mobile Home Parks
Traditional Neighborhood Development
Mixed-Use (Housing)
Office-Commercial:
Low-Rise Suburban OIF~ces
Mid-Page Suburban Offices
High-Rise Urban Offices
Business/Office Parks
Medical/Dental OiFJces
Condominium OfFices
Single-User Indust~al Facilities
Light Industrial Parks
Heavy Industrial Parks
Technology Parks
Corporate Industr~al/OiT~ce Parks
Warehouse & Distribution Facilities
Flex OlF~ce
Tourism, Resorts and Recreational:
Hotels & Motels
Golf Courses & Country Clubs
Destination Resorts
Athletic Clubs
Convention Centers
Performing Ares Centers
Ski Resorts
Civic Centers
Tourism Development Plans
Retail-Commercial:
Single-Use Retail Sites
Neighborhood Centers
Community Centers
Regional Centers
Specialty Centers
Recreation Retail
Central Area Retail
[nstitutionaVJoint Development:
Colleges & Universities
Cultural Centers
Civic Centers
Parks & Open Space
Economic Development
Senior & Low-Income Housing
.Neighborhood Revitalization
Implementation Strategies
Transit Station Area Planning
RESOURCES
Leland Consulting Group may operate independently on a consulting engagement, participate as
part ora project team, or assemble and lead a team when responding to a client's needs. Leland
Consulting Group maintains ongoing professional associations with other real estate advisory
firms in major cities. Hence, the firm has the capability to respond to assignments throughout the
United States, Canada, Mexico and the Pacific Rim. This network of professional associates
includes architects and landscape architects: engineers (civil, structural, mechanical, soils, etc.);
environmental consultants; apprmsers; lenders and investors: attorneys; accoumanrs: real estate
brokers; advertising and public relations specialists and other members of the greater
development community. Most of these relationships have developed over many years: however.
new and valuable relationships form each year. Each project assignment is a unique and
challenging situation deserving the best talents and experience available. Therefore. each team is
handpicked to respond appropriately to the project mission and its objectives.
· RealEsrateStrategists Page 2 of 2
Firm Profile
FIRM:
FIRM ADDRESS:
TELEPHONE:
FAX:
EMAIL:
MSA PROFESSIONAL SERVICES, 1NC.
3400 Asbury Road, Suite 201
Dubuque, IA 52002
(563) 582-3973
(563) 5824020
www.msa-ps.com; jholz~,msa-ps.com
MSA Professional Services, Inc., (MSA) is an employee-owned f'mn since 1992 with annual billings of $18.2
million. MSA offices are located in Dubuque, IA, Galena, IL, Baraboo, Beaver Dam, Madison, Friendship,
Rhinelander, and Rice Lake, WI, and Duluth, MN.
MSA is well known for the provision of complete municipal services to communities of all sizes, and presently
serves about 200 communities. Approximately 240 professionals and support personnel work out of our nine
offices. The MSA team consists of planners, engineers, architects, surveyors, geolo~sts, GIS specialists, and
environmental scientists.
Our professionals have not lost sight of what is most important - our clients. MSA has the technical ability,
professional qualifications, and extensive experience required to provide engineering services to municipalities.
You can expect us to effectively manage our resources, formulate innovative yet practical solutions, and apply new
technologies, all the while maintaining an awareness of your needs and sensitivities.
Our experienced technical staff will provide a personal touch to your project. We do not design projects with
unnecessary components or improvements that are not warranted. MSA will match its staffs expertise to the
demands of each project; we will nor assign a senior engineer where a technician would otherwise suffice. Your
City can expect honest, reliable, professional, and timely sermce, and can rest assured that MSA will deliver that
and more.
MSA's advanced technology allows for a seamless exchange of information among all of our offices. We mainram
approximately 250 computers throughout the f'mn, which are connected by a Wide Area Network.
At MSA, we routinely use the Internet to contacl suppliers/contractors and obtain product and equipment
information and pricmg. All survey, [and design and consu'uction serwces are performed using electronic
equipment. This includes field to finish systems. Our staff and every office communicates via networked systems,
enabling simultaneous access to project documents and/nformation. Across the hall or across the state, we have the
ability to reach out to our human resources, modify shared files, and share company standards and experience.
Durrant
Firm Profile
Name of Firm, Address
Phone, Fax, Email and
Contact Person
Durrant
700 Locust Street
Suite 942
Dubuque, IA 52001
(563) 583-9131 phone
(563) 557-9078 fax
www.durrant.com
Contact
Kevin Eipper]e, AIA
Principal
keippede@durrant.com
Firm Size
Dun-ant has provided professional architecture, engineering, project delivery,
planning and interior design services since 1933. Durrant offers a wide range
of professional services to its clients. Today Durrant has neady 370
employees working from fourteen offices nationwide:
· Austin, Texas
· Denver, Colorado
· Des Moines, iowa
· Dubuque, Iowa
· Hartland, Wisconsin
· Honolulu, Hawaii
· Madison, Wisconsin
· Minneapolis, Minnesota
· Phoenix, Arizona
· Sacramento, California
· San Antonio, Texas
· St. Charles, Illinois
· St. Louis, Missouri
· Tucson, Arizona
Areas of Expertise
Architectural planning and design, interior design, space planning, electrical,
mechanical, structural and civil engineering, needs assessment, health, life &
safety studies, cost, schedule, project delivery and financial services. Durrant
provides these services for the following market sectors: Primary and
secondary education, higher education, libraries, healthcare facilities, city,
county, state and federal justice facilities, commercial/retail, industrial, and
public safety facilities.
RESUMES OF KEY PROJECT PERSONNEL
[] Leland Cowmlting Group, Real Estare Srrateffists
LELAND TEAM ROLES AND RESPONSIBILITIES
Anne Ricker, Leland Consulting Group
Principle Client Contact
Co-Project Manager
Market Analysis and Implementation
Percent of Work: 30%
Bill Cunninghaan, Leland Consulting Group
Co-Project Manager
Financial Analysis and Implementation
Percent ofWork: 30%
Bob Kost, UIIS Corporation
Urban Design, Landscape Architecture and Community Facilitation
Percent of Work: 20%
Bill Troe, URS Corporation
Transportation and Parking
Percent of Work: 5%
Jim Holz, MSA Professional Services
Community Plazm/ng
Percent ofWork: 10%
Kevin Eipperle, DUrrant
Architecture (IgJstoric) and Visualization
Percent of Work: 5%
! Leland Consulting Group, Real Estate Strategists
ANNE B. RICKER
Principal
Ms. Rickar has extensive experience with real estate market analysis,
economic feasibility studies and economic development analysis for
public and private sector clients. As a former Senior Associate in the Real Estate
Advisory Services Division of Laventhol & Horwath (L&H), she managed teams
working with the FSLIC and Resolution Trust Corporation (RTC) to identify
solutions for problem assets. Since joining Leland Consulting Group, Ms. Picker
has successfully assisted private and public sector clients in evaluating land.
identifying opportunities and barriers to development and creating tools and
strategies to achieve success. In 1996, Ms. Picker, together with Mr.
Cunningham, expanded the firm with the Denver office of Leland Cunzulting
Group and since has developed the firm's reputation as a leader in real estate
advisory in the Denver region and Front Range. As a member and speaker for
the International Downtown Association, Ms. Picker has focused on assisting
downtowns and regional entities with implementation strategies for real estate
redevelopment and providing organizations financing tools for successful
revitalization.
Consulting Experience:
Colorado, New Mexico, Montana, Nevada, Utah, Oklahoma, Wyoming, Oregon,
California, Texas, Louisiana, Washington and New York
Housing and Public Policy, Consumer Housing, Real Estate and Real Estate Law.
Land Use Planning, Natural Resoume Law, Social Welfare and Housing Special
Needs
Areas of Expertise:
Market and Feasibility Analysis, Strategic Economic Development Planning,
Development Economics, Economic/Fiscal Impact Analysis, Public and Real
Estate Finance, Commercial Revitalization and Reuse Strategy, Asset Acquisition
and Disposition Strategy, Loan/Portfolio Review
Career Practice:
Internship: Fort Collins, Colorado, Communit5 Devel. Block Grant Office
Survey Coordinator: Handicapped Information Office, United Way Affiliate
(Housing Survey)
Economic Market Analyst: THK Associates, Inc.
Senior Consultant: Laventhol & Horwath (Denver), Real Estate _Advisory Services
Senior Associate: Laventhol & Horwath (Los Angeles), Real Estate Advisory
Services
Senior Associate: Leland Consulting Group (Portland), Real Estate Economists.
Development Advisors & Project Managers
Principal: Leland Consulting Group (Denver), Real Estate Economists &
Development Advisors
Colorado State University, Consumer
Science mad PuNic Homing,
Bachelor of Science
Additional Course Work:
Re~ ~state Finance. Real Estate FeasJbili~
Analy~m Economic/Demographic Data
· RealEstate Strategists
ANNE B. RICKER
Continued
Professional Affiliations:
Member: Urban Land Institute
Member: International Downtown Association
Member: Downtown Denver Partnership
Member: Lower Downtown District, Inc.
Major Clients Served:
Arapahoe County, Colorado
Aspen-Pitkin County Planning Dept., Colorado
BRW, Inc.
Boulder Housing Authority
Calthorpe Associates
The Chotin Group
Century West Development, Inc.
CITICORP
City of Aurora, Colorado
City of Commerce City, Colorado
City & County of Denver, Colorado
City of Federal Heights, Colorado
City of Fort Collins, Colorado
City of Lakewood, Colorado
City of Midland, Texas
City of Montrose, Colorado
City of Northglenn, Colorado
City of Pueblo, Colorado
City of Salida, Colorado
City of Tualatin, Oregon
Colorado Housing Finance Authority
Denver Housing Authority
Denver Symphony Task Fome
Design Studios West
Downtown Denver Partnership
Federal Deposit Insurance Corp.
Feld Company
G.T. Land Colorado, Inc.
~mnet Development Company
Greater Denver Chamber of Comm.
HOH Associates, Inc.
HOK, Inc.
Johnson Wax Development Corp
lqng Brothers Development
Lincoln Property Company
Long-Term Credit Bank of Japan
Medite Corporation
Metro Denver Network
Missoula County, Montana
Navajo Nation
Oregon Economic Dev't. Department
Pierce County, Washington
Port of Anacortes. Washington
Port of Kennewick. Washington
Port of Klickitat. V~rashington
Portland General Electric
Public Service Company of Colorado
Ratheon Corporation
Regional Transportation District
Resolution Trust Corporation
Saquache County, Colorado
Tooele County, Utah, Economic Dev't. Corp.
Town of Paonia Colorado
Town of Snowiness Village Colorado
Tri-Met. Oregon
Weyerhaeuser Realty Investors
· Rea[ E~tare Srravegists
BILL J. CUNNINGHAM
Principal
Mr. Cunningham has extensive experience providing a wide variety of
economic development and real estate advisory services to public
and private sector clients throughout the United States. Mn Cunningham
was formerly a Manager with the nation's largest mai estate advisory f'mn,
Arthur Andersen & Co. and a Senior Real Estate Associate with the
international accounting firm of Laventhol & Horsvath. His areas of
expertise include market and financial feasibility analyses for real properties,
as well as a special focus on convention and public feasibility analyses;
mixed-use resorts; commemial revitalization plans; and asset management
and disposition strategies. He holds a Bachelor of Arts degree from the
University of Northern Colorado and a Master of Business Administration
from the University of Denver.
Consulting Experience:
Colorado, New Mexico, Utah, California. Oregon, Arizona, Wyoming,
Montana, Texas, Louisiana, Michigan. Illinois. North Carolina and Mexico.
Market Research Analyst: Wood Bros. Homes
Real Estate Consultant: Laventhol & Horwath
Senior Real Estate Associate: Laventhol & Horwath
Principal: Business Economics Group
Principal: Western Economic Associates
Manager: GA/Farmers-Arthur Andersen & Co.
Principal: Leland Consulting Group (Denver), Real Estate Strategists
Areas of Expertise:
Market and Feasibility Analysis, Development Economics. Economic/Fiscal
Impact Analysis, Public and Real Estate Finance. Strategic Economic
Development Planning, Commemial Revitalization and Reuse Strategy, Asset
Acquisition and Disposition Strategy, Loan/Portfolio Review
University of Colorado
Bachelor o~Arts
Real Estate Strategists
William L. Troe, AICP
Senior Associate
Experience
Mr. Troe is a Senior Associate and the Senior Transportation Planner in
URS' Omaha and Des Moines offices. He has over 16 years of experience in
transportation planning, including: regional long-range plan development/
implementation, arterial corridor/subarea studies, site impact studies, ah'
quality and noise analysis of transportation related facilities, intelligent
transportation system (ITS) applications and travel demand forecasting.
Long-Range Transportation Plans
Mr. Troe has been the project manager and/or lead transportation planner on
long range transportation plans for a number of small and medimn-sized
metropolitan areas. His responsibilities have included working with staff and
the public to identify local issues, preparation and analysis of the daily traffic
forecasts for corridor improvement and land development concepts,
public/staff involvement, preparation of the report document and obtaining
approval of the plan elements. Elements of the long range plans have
included: evaluating the current and future roadway- network for capacity and
system deficiencies, documentation of potential land development plans,
incorporation of airport master plans, trails and transit plans, downtown
parking and circulation studies and £mancial analysis of various
improvement concepts.
In particular, Mr. Troe has participated in Long Range Transportation Plans
for, Grand Rapids/Kent County, MI; Flint/Genesee County, MI; Harrison
County, WV; Valley City, ND; Dickinson, ND; Grand Forks/East Grand
Forks (ND, MN), Fargo/Moorhead (ND, MN) Grand Island, NE;
Rochester/Rochester Hills, MI; Oklahoma City, OK; Norman, OK; Casper
Area MPO, WY; and Washin~on County, MN. Additionally, he provided
transportation planning services in support of the Sioux Fails Downtown
Development Plan in Sioux Falls, SD.
Travel Demand Forecasting
Mr. Troe has served as project manager and principal forecaster for the
development, calibration and application of a regional, subarea and corridor
scale travel demand-forecasting models. Projects for which he has been
responsible for development, re-validation and/or application of models as a
forecast'mg tool have including: development of trip generation applications
using combinations of land use and socioeconomic data descriptors as
independent variables; trip distribution; mode split; and, traffic assi~munent.
The modeling applications including the elements listed have been used in
long range trmasportation plans; arterial corridor studies; regional air quality ·
conformity; bridge relocation studies; subarea transportation studies; and,
Intelligent Transportation Systems applications. Programs with which Mr.
William L. Troe, AICP
Page 2
Troe has experience include: TranPlan, TP+/Viper, MinUTP and QRSII.
Representative locations of regional/subarea modeling applications of Mr.
Troe's include: Valley City-, ND; Omaha, NE; Grand Rapids/Kent County,
MI; Lincoln, NE; City of Flint/Genesee County, MI; Dickinson, ND; Grand
Island, NE; Fargo/Moorhead 0NrD/MN); Bloomington, MN; Roseville, iVLN;
Casper, WY; Gila Reservation, AZ; Duluth, MN; Rochester, MN; Blaine,
MN; Washington County, MN; Grand Forks/East Grand Forks (NrD/MN);
Oklahoma City, OK; Big Sky, MT; Georgetown, TX; Norman, OK;
Colmnbus, NE; Valley City, ND; E1 Toro Marine Air Station, CA; Stapleton
International Airport Redevelopment Master Plan, Denyer, CO; Harrison
County, WV.
Subarea and Corridor Studies
Mr. Troe has served as project manager and lead planner on numerous
corridor studies along urban arterial corridors and rural
interstates/expressways. His responsibilities have ranged from preparation of
daily and design hour forecasts, to alternatives analysis, to public
involvement, to project management. Representative corridor level study
applications include: West Dodge Road Improvement Study, Omaha, NE;
West Center Road Corridor Study, Omaha, NE; US 20 Improvement Study,
Dubuque, LA; TH 65 Corridor Study, Anoka County, MN; TH 10 Corridor
Study, Anoka/Ramsey County, MN; TH 100/55 Interchange Study,
Minneapolis, MN; I-81 Improvement Study, BotetourffMontgomery/
Roanoke County, VA; Route 288 Corridor Study, Richmond, VA; West Side
Bypass Study, Casper, WY; 27~ Sheet Subarea Study, Lincoln, NE; ]~-494
Corridor Study, MN; TH 36/Dale Street Interchange Study, St. Paul, MN;
US Highway 2 Corridor Study, Minot, ND; Main Street/Ferry Street
Intersection Analysis, Anoka, MN; East Casper Transportation Study, WY;
US 34 Bridge Relocation Study, NE/IA; and 1-225 Access Study, Aurora,
CO.
ITS Studies
Transportation plarmer for the concept development and design of a portable
traffic management system (PTMS) to be applied in the Twin Cities to
manage traffic during special events. The PTMS concept integrated
intersection traffic signals, traffic control personnel, changeable message
signs and highway advisory radio at a central location. Surveillance of
traffic operations along key roadway segments was facilitated through
temporary installation of portable closed circuit television cameras. Mr.
Troe served as Project Manager for the operatio~d test of the PTMS. During
the operational test, the various elements of the design were tested; including
portability, ability to integrate components, requirements of traffic center
personnel and ability to manage traffic as a result of changing signal timings,
CMS messages and lIAR messages.
William L. Troe, AICP
Page 3
Mr. Troe served as a transportation planner on the precursor analysis of an
automated highwa,v system (AHS). His responsibilities included analysis of
the potential throughput impacts associated with of conversion of
conventional freeway travel lanes to various levels of automated control.
Responsibilities included modifying regional travel demand models to
include AHS concepts, evaluating the relative traffic impacts associated with
implementation, evaluating automated systems with various levels of access
and alternate roadway configurations on a micro-scale.
Major Investment Studies (MISs)
Mr. Troe was the project planner for traffic forecasting and operations
components of alternatives evaluation for the Route 21 Major Investment
Study (MIS). The project consists ora major transportation investment study
and environmental document to identify solution strategies for the
transportation needs along 18 miles of Route 21 in central Jefferson
County, MO. Traffic safety problems, evidenced by a higher than the
statewide average for accidents along this corridor were the impetus for this
project.
Mr. Troe was the task manager responsible for completing the Heritage
Trolley MIS in Omaha: The proposed concept was to re-establish an electric
streetcar line connecting the Henry Doorly Zoo/Rosenblatt Stadium area to
the downtown and providing additional connection through the
LogarffFontenelte neighborhood.
Environmental Impact Analysis
Mr. Troe served as the plmming analyst responsible for completion of the
micro-air quality and/or noise analysis for numerous roadway improvement
projects, light mil transit projects and site development projects.
Particularly, he was involved in: 1-494/TH 77 Interchange Improvement
Project in the Twin Cities, MN; Hedberg Development. IV~T; Ya~kton
Bridge Relocation Study, SD~NE; Riverdale Shopping Center, MN; TH 169
Cross-Range Expressway, MN; Paradise Corridor Environmental Impact
Statement in Phoenix, AZ; Midway Corridor LRT, MN; Hermepin County
System Plan, MN; Central Corridor LRT, MN; and, the US 34 Bridge
Relocation, NE~.
Registrations American Institute of Certified Planners, 1989
Education M.A. Urban and Regional Planning, University of Iowa, 1985
Certificate, Transportation Planning, University of Iowa, 1985
B.S. Community and Regional Plarm/ng, Iowa State University, 1983
Work ltistory URS Corporation, Senior Associate, 1999 to Present
ItDR Engineering, Inc., Senior Professional Associate, 1994 to 1999
William L. Troe, AICP
Page 4
BRW, Inc., Senior Transportation Planner, 1985 to i994
Robert M. Kost, ASLA
Senior Associate/Registered Landscape Architect
Experience
Bob Kost is a Senior Associate in the Minneapolis Office with over 20 years
of experience in master planning and urban design for private and public
sector clients. He has successfully managed multidisciplinary teams on
complex projects around the country including Minnesota, Arizona, Georgia,
Wisconsin and Iowa. He understands the complex relationships between
land use and transportation and has a strong sensitivi~ to the issues of
neighborhood livability and environmental integrity.. Mr. Kost's
responsibilities include marketing, project management, planning, design,
government approvals, facilitation of public meetings and workshops and
supervision of design and production documents.
Park System Master Planning
Representative Experience for Park system master plans prepared by Mr. Kost
include:
Chain of Lakes Master Plan in Minneapolis, MN
· Comprehensive Parks m~d Recreation Plan Update, Saint Anthony
Village, MN
· Park System Master Plan, Superior, WI
· Park System Master Plan, Burnsville, IvlN
· Upper Mississippi River Master Plan, Minneapolis, MN
Park and Trail System Design
Representative Experience for Park and trail system projects designed or
managed by Mr. Kost include:
· Rail Road Park Master Plan, West Des Moines, IA
· Heritage Trail Master Plan, Dubuque, IA
· Wash Corridor Trails and Recreation Facilities for State Route 5 I,
Phoebe/x, AZ
· Central Park Master Plan, Saint Anthony Village, MN
· Lake Calhoun Park Renovation, M'umeapolis, lvlN
· West River Parkway, Mkmeapolis, MN
· Lake Harriet Park Renovation, Mim~eapolis, MN
· Edinborough Park, Edina, MN
· Mill Ruim Interpretive Park, Mirmeapolis, MN
· Cedar Point Park Master Plan, Waeonia, MN
Urban Planning
Representative Experience for Urban Plarming and design projects managed or
designed by Mr. Kost include:
· Transit Supportive Design and Development Guidelines for the Euclid
Corridor Transportation Project, Cleveland, OH
Robert M. Kost, ASLA
Page 2
· Urban Design Plan for Wofsburg, Germany
· Linden Hills Neighborhood Design Framework, Minneapolis, MN
· Design Guidelines for the City of Wayzata, MN
Comprehensive Streetscape Renovation for the historic downtown of
Valdosta, GA
· Waconia Design Standards, Waconia, MN
· Mississippi Riverwalk, Dubuque, IA
· Downtown Streetscape Renovation, Iowa City, IA
Master Planning
Representative Experience for Master planning and site design projects
completed by Mr. Kost include:
· Port of Dubuque Master Plan (I00 acres)
· Humboldt Gmenway (70 acres of new- housing and open space),
Minneapolis, MN
Long-Range Campus Master Plan for North Memorial Medical Center.
Robbinsdale, MN
· Fairview Southdale Hospital Master Plan, Edina, MN
· Desert Ridge New Community (5,400 acres) Phoenix, AZ
· Elm Creek Multi-Use Planned Unit Development, (1,300 acres),
Champtin, MN
Landscape Planning and Design
Major landscape projects designed by Mr. Kost include:
· Landscape Master Plan for Fairview Southdale Hospital, Edina, MN
· Cray Research Corporate Headquarters Landscape Master Plan, Eagan,
· Landscape Master Plan for North Memorial Medical Center Expansion,
Robbinsdale, MN
· University of Minnesota Transitway, Minneapolis and St. Paul, MN
· Mirmesota Korean War Veterans Memorial at the State Capitol Mall,
St. Paul, MN
Education
Bachelor of Landscape Amhitecture, University of Illinois, 1979
Revitalizing Cities Worldwide, Harvard Graduate School of Design
Neighborhood Design and Traffic Calming, University of Wisconsin
Treatment Wetlands, University of Wisconsin
Biotechnical Slope Protection and Erosion Control, University of Wisconsin
Professional Registrations/
Affiliations
Registered Landscape Amhitect, State of Minnesota (16381/1983)
American Society of Landscape Architects
National Trust for Historic Preservation
Sensible Land Use Coalition
Congress for the New Urbanism
National Recreation and Park Association
Robert M. Kost, ASLA
Page 3
Awards and Presentations
MA SLA Award of Excellence for Public Planning 2001- Euclid Corridor,
Cleveland, OH
MASLA Merit Award for Public Planning, 1999- Wayzata Design Gnidelines
MASLA Merit Award for Private Design, 1999-Cray Research Landscape
Master Plan
Colrunittee on Urban Environment "Cue Award" for the renovation of Lake
Harriet and Lake Calhoun Parks - 1998
Committee on Urban Enviromnent "Cue Award" for completion of the iVlN
sagment of the Great River Road - 1998
First place in national design competition 1997 - MN Korean War Veterans
Memorial
MASLA Merit Award for Public Plaaning 1996 - 50t~ and France Streetscape
MASLA Award of Special Recognition 1995 - Northern Lights Fountain
Guest Facilitator, Deans Lake Neighborhood Design Workshop, Iowa Chapter
American Society of Landscape Architects Spring Conference, May 2001
Guest Speaker, "National Resource Enhancement in Urban Parks," MN Park and
Recreation Annual Meeting, November 2000
Guest Workshop Facilitator, Design Excellence Through Context-Sensitive
Design, Center for Transportation Studies, Mn/DOT and FHWA, Spring
2000 and 200t
Guest Speaker, The Human Scale in Urban Design, American Planning
Association, Iowa Chapter Fall Conference, 1999
Guest Speaker, Harmonizing Transportation and Community Goals,
Transportation Research Board Spring Conference, Boston, MA~ I999
Work History
URS Corporation, Project Manager/Landscape Architect (1986 to Present)
Architectural Forum, Inc., Project Manager/Site Planner (I985 to 1986)
Custom One, Inc., Project Manager/Site Planner (1983 to 1985)
Robert Engstrom Associates, Site Planner (1980 to 1983)
CAPSULE RESUMES - DOWNTOWN MASTER PLAN
Employee:
Expertise:
Experience:
Education:
Jim Holz
Team Leader/Senior Planner
· Dubuque Downtown Task Force
Community Member
· Community Development
and Financing
· Ctm:ent Planning
· Strategic Development and
Housing Planning
· Tax Incremental Financing (TIF)
· Grant Administration
· Grant Writing
· GIS Mapping and Use
11 years
B.S., Applied Geography
w/Emphasis in Land Use Planning
Employee:
Expertise:
Experience:
Education:
Carter Amdt, Al_A,
Architect
· Feasibility Studies
· Programming/Space Needs
Studies
· Building Design
· Project Administration
· Building Code and ADA
Review
· Construction Document
Preparation
· Bidding Administration
· Construction Administration
14 years
B.A.. Architecture
Employee:
Expertise:
Experience:
Education:
Rahel Desalegne
Transportation Engineer
· Traffic Impact, Site
Access/Circulation, Parking
Planning/Usage Studies
· Traffic Signal Warrant Analysis
& Preliminary Design
· Traffic Data Collection &
Analysis
· Traffic Congestion Mordtoring
· Traffic Calming Studies
· Pavement Markings &
Signing
· HighwaY Geometric Design
8 years
B.S, Civil Engineering-Highway
Design
M.S., Civil Engineering-Highway
Design
Durrant
Kevin J. Eippede, AIA
Principal
Respected for his talent and careful attention to detail, Kevin has been
chosen as the advocate and project manager for many of Durrant's
highly valued clients. Kevin has managed jobs ranging in size up to
thirty-five million dollars in project cost. His expertise is in problem
solving for existing structures, and he is regarded as one of Durrant's top
project managers.
Main Street/Town Clock Plaza
Study; Dubuque, IA
Project Director for feasibility
study and consensus gathering
of afl stakeholder groups.
Developed standard amenities
for long-range City of Dubuque
improvements.
Main Street/Town Clock Plaza
Phase II; Dubuque, IA
Project Director for
implementing streetscape
design for 4 blocks of Main
Street in the City of Dubuque.
Sioux City Streetscape
Design; Sioux City, iA
Project Director/Design
Architect for streetscape
improvements, master
planning, and design guidelines
for the old 4~ Street District.
Included an extensive public
input process and work with
stakeholder committees.
City of Dubuque Historic
Design Review Guidelines
Manual, Dubuque, IA
Design guidelines forthe City of
Dubuque to present
information, gathered and
determined, for use as a guide
by the City for its Frze historic
distdcts. The manual will be
used as a basis for defining
styles and providing guidelines
to assist and educate the
community on restoration and
rehabilitation of historic
properties.
America's River, Phase 1
Master Plan Development,
Dubuque, IA
·, Mississippi River Discovery
Center, Dubuque, IA
Associate Architect/Preject
Manager for site work and
building shell
Southeastern Community
College; West ,Burlington and
Keokuk, IA
Project Manager/Master
Planning for community college
facilities including: Conference
Center for Business and
continuing Studies; computer tab;
childcare facility; library; cafeteria
addition; and Buildings ~0, 20,
30, 100, 200,
300, and 500.
Byron Community School
District #225; Byron, IL
Project Manager for district-
wide master planning for long-
range plan, site development,
and parking development for
K- ~ 2 educational facility.
North End Neighborhood Trail
Project, City of Dubuque;
Dubuque, IA
Project Director/Design Architect
for ten block bike/hike trail along
an abandoned railroad fight-of-
way, which will eventually
connect to the 26 mile Heritage
Trail and The Mines of Spain
recreational area.
Education
Bachelor of Ar~s and
Bachelor of Architecture,
Iowa State University
Registration
Registered Amhitect: Illinois, Iowa
and South Carolina
National Council of Architectural
Registration Boards (NCARB),
Cerdfied
Memberships and Activities
National Trust for Histodc
Preservation, Member,
1984-Present
Iowa Architectural Foundation,
Architecture in Schools
Continuing Education Program
for Area Teachers, Program Team
Member, Houses Have History
Iowa State University Architecture
Advisory Council Member,
1999-Present
American Institute of Architects
(AIA), iowa Chapter, Board Member
Council for Education Facility
Planners International (CEFPI),
Member, 1996-Present
City of Dubuque Histodc
Preservation Commission, At
Large Architect, President, Member
1993-1999
PROJECT EXPERIENCE AND REFERENCES
"Leland Consulting Group helped Downtown Lincoln -- not only communicate with
developers, but position us at a market to be looked at - in fact, linked us up with
developers who are now doing projects in Lincoln."
Polly McMullen, Executive Director, Downtown Lincoln Association, Lincoln, NE
"Leland Consulting Group masterfully weds community vision with market real/ty by
giving their clients the tools to make that vision a reality. Their recommendations have
already resulted in policy changes, ttrban desiown standards, and a trmzsformation of the
City's organizational stzucture to enable the City, of Fort Worth to redirect is resources to
focus on central city redevelopment_"
Christine Maguire, Project Manager - Central City Revitalization Strategy, Fort Worth, Texas
I~ Leland Consulting Groz&, Real Estate S~ateght~
LELAND CONSULTING GROUP
Downtown Development and Redevelopment Experience
Across America, downtowns are experiencing resurgence and emerging as
regional destinations. After suffering sustained losses to regional mal~s,
and more recently, giant big-box retailers and discounters, downtowns am
realizing the need for implementation strategies that renew downtown vitality
through multiple projects. Leland Consulting Group has extensive experience
working with downtown leaders across the nation. Our firm contributes to
successful revitalization of downtowns throuoda a unique and effective
implementation strategy that gets results.
Most successful downtowns result from nurturing and growing each diverse
segment of the downtown economy. Revitalized downtowns are able to
market these positive changes and produce an overall image of vitality that
results in continued reinvestment. Leland Consulting Group provides our
downtown clients with implementation strategies that integrate marketing
with redevelopment. We offer the right combination of services from
markdt research, development programming, and financial analysis to
identifying opportunity sites, and structuring and negotiating private-public
partnerships.
Solutions to downtown development require a broad base of experience and
knowledge in order to implement a multi-faceted approach. Leland
Consulting Group's cross-trained professionals provide a solid foundation in
urban economics, market strategy, urban programming and real estate
advisory services that are key to successful implementation. We have the
experience and capability to combine opportunity identification with
feasibility analysis to get projects built. We provide flexible and innovative
solutions for our clients. The list of selected clients illustrates our experience.
LELAND CONSULTING GROUP
Urban and lnner City Housing Expe~ence
Successful development of housing is one of the most challenging real
estate assignments. The purchase or rental of a housing unit is an
emotional decision enhanced or restricted by one's ability to pay. Successful
housing development requires a solid understanding of the needs and desires
that must be met to satisfy each of the housing market segments--one- and
two-person household renters, entry-level family home purchasers, middle-
aged family and empty-nestar move-up home buyers, condominium
purchasers, and resort and second-home purchasers.
Each housing product needs to be thoughtfully tailored to meet the rigorous
demands of the market that will purchase or rent it. This requires solid
experience coupled with market research, good design and quality execution
in terms of land development and building construction.
Most mid-size to large cities and virtually all metropolitan areas throughout
Amari~a have reached a point where approximately two thirds of ali
households are comprised of one or two persons. A single pe~on Iiving
alone, a couple married or unrelated, a single parent with a child, a retired
couple, two individuals sharing space---all or part of the majority of
households redefining their living and space needs. While many such
households have the financial capacity to live in a variety of housing
products, security, ease of maintenance, smaller but high quality living
environments, access to entertainment and cultural facilities, proximity to
restaurants, and other attributes are part of the attractions that draw this
ever-growing population to inner city and downtown urban living solutions.
Traditional apartments and single-family homes made up more than 95
percent of ail housing constructed in America only ten years ago. Today, a
significant percentage of housing is considered alternative--lofts, low-rise.
mid-rise and high-rise rentals and condominiums, rowhouses, townhouses.
stacked units, clustered units, and all of the variations, are part of the myriad
of products increaimgly available. The principals of Leland Consulting
Group have provided market research, development programming, financial
analysis, valuation analysis, and related development advisory services to
communities and private developers. Selected projects are listed at right.
· ReaIEstate Strateo~sts
LELAND CONSULTING GROUP
Transportation and Land Use Linkage Experience
Cities throughout the United States are examining ways to strengthen the
link between land use and transportation through new approaches to
development. Increased growth and trafl'tc congestion, together with the
public sector's reduced capacity to pay for expanded infrastructure, am
prompting efforts to increase housing and employment densities in
proximity to light rail stations, express bus lines and other transportation
systems.
Leland Consulting Group has been assisting a number of jusisdictions with
projects related to transportation, land use and growth management. Leland
Consulting Group is at the forefront of implementing policies and projects
making this transportation and land use linkage. Many of our clients are
jurisdictions developing and implementing strategies to encourage infill
development, transit-related development, new urbanist communities, light
rail station area plarming, transit villages, and similar innovative
development responses. Leland Consulting Gmup's Portland team has
contributed to over 40 innovative development advisory projects with the
State's Transportation and Growth Management program. Many of these
assignments begin with a forecast the amount of growLh anticipated for
specific jurisdictions and then to work with broad constituencies to del'me
market and implementation strategies that encourages appropriate
development. A major focus of this work is determining the amount of
growth expected to occur, examining alternative methods of providing
housing and employment at higher densities to manage growth and
identifying development strategies that reduce the cost of infrastructure and
services.
Included here is a list of representative clients for whom the Leland
Consulting Group has provided market research, development
programming, financial analovsis, strategic planning, development advisory
services, and project management. Under the category of Transportation and
Land Use Linkage, assignments for these clients are quite diverse, including
planning more than 50 light rail station areas, growth management, transit-
oriented development, main street town center development, fill and mixed-
use projects, bus express, and similar projects.
City of Aurora. CO
City & Count3 of Denver. CO
City of Corvallis. OR
City of Englewood. CO
City_ of Golden. CO
City of Gresham, OR
City of Hillsboro. OR
City of Lake Oswego. OR
City of Medford, OR
City of Por~land, OR
City of Salem. OR
City of Sprin~fidd, OR
City of Steamboat Springs, CO
City of TuaLatin. OR
City of Wheat Ridge. CO
City of Wflsonvill~ OR
Clackamas County, OR
Colorado Dept. of Transportation. CO
Meh'o Regional Services. Por tlan d, OR
Portland Development Commission. OR
Regional Transit. Ft. xfik)r th_ Texas
Regional Transit. Sacramento. CA
Regional Transportation Distt itt Denver. C O
SANDAG. San Diego, CA
Sound Transit. Seattle. WA
Transportation District Sacramento. CA
Tri-Met. Portland. OR
LELAND CONSULTING GROUP
Wate~Cront Experience
Waterfront development and redevelopment is an exciting, yet
particularly challenging, real estate niche. The involvement of many
regulatory agencies, the usual presence of sensitive environmental issues, the
intense interest of varied and vocal special interest groups, and the diversity of
land uses and activities all demand the services of an experienced and focused
real estate team.
While many American communities had their roots at the edge of a body of
water, for half a century or more that relationship was all but forgotten.
Cities throughout America are rediscovering their relationship to long-
neglected waterfronts. Historically active waterfronts with cargo ships, break
bulk cargo, active docks and uplands tramitioned into warehousing districts,
fish processing plants, waste treatment facilities, and the like. These uses ara
transitioning to new developments based on the valuable amenities of a
ralatior3ship to the water, attractive views, and open space.
Le]and Consulting Group works closely with cities, port districts, urban
renewal agencies and other public bodies to redefine and revitalize the
powerful relationship that results from a city reinvesting in its waterffront.
Retail activities, eating establishments, a variety of housing products, office
space, public facilities, parks, esplanades, marinas, and other urban elements
are part of the myriad of interlocking uses that create an exciting and unique
place dependent on a connection to waten
The principals of Leland Consulting Group have prepared market studies,
development and redevelopment programs, financial feasibility analyses, and
project management for a number of significant urban and suburban
waterfront properties. Selected waterfront projects involving these real estate
advisory services are listed on the right.
Alaskan Ferry Terminal, Seattle, WA
Anacor tez Water front, Anacor tez, WA
Birch Bay Resort, Blaine, WA
The Breakers, Decrier, CO
Bremerton Waterfront_ Bremeaion. WA
Clover Island Kennewick. WA
Columbia Poinm. Rerfland. OR
Eau Claire Riveffront Cal4ary, Alberta
Downtovm Waterfront. Dubuq,~e. IA
Downtown Wamrfront. Oregon City, OR
Downtown Waterfront Rainier. OR
· RadEciateSt~=teglsts
LELAND CONSULTING GROUP
New Urbanism and Smart Growth Expes4ence
New Urbanism and Smart Growth are terms often used
interchangeably without a dear def'mition of what they mean.
At Leland Consulting Group we strive to inject progressive planning
principles into each of our projects. This comes not from an idealistic
utopian vision, but rather from our experience that shows that New
Urbanism and Smart Growth principles can make projects more
attractive, more profitable, more successful.
New Urbanism is much more than just neotraditional planning. It
implies a holistic approach to building new communities and revital-
iz'mg existing ones. This approach takes into account regaonal
implications to a project so that it blends into the regional urban
fabric and responds to regional issues related to open space, trans-
portation, employment, environment, and density. At the neighbor-
hood ievel, New Urbanism principles call for a rich mix of uses in
close proximity so that residents can live. work. and shop in the same
neighborhood. Physically, New Urbanism means pedestrian-oriented
design that de-emphasizes the automobile and encourages pedestrian
activity and interaction among residents. Leland Consuking Group
has worked with nationally-recognized design teams on successful
New Urbanist developments.
Smart Growth can refer to many different styles of development as
long as they reflect key Smart Growth principles:
· Provide nearby services;
· Lower commuting time and reduce congestion:
· Encourage and make possible alternate modes of transit:
· Provide better neighborhoods for walking and living;
· Be environmentally sound;
· Be economically vital;
· Maintain affordability; and
· Enhance the quality of life and the sense of community.
Smart Growth principles are appropriate for ail projects, urban and
suburban, commercial and residential, environmental and industrial.
By adhering to these principles, Leland Consulting Group helps to
facilitate projects that are environmentally friendly, economically
feasible, and that create more livable communities.
40 Smart Growth Projects (Sram of Oregon)
Alpemro~e Redevelopment (Portland, OR)
Jackson (V&ommgJ
Master Plan
Dubuque, Iowa
Since the late 1970's the City of
Dubuque, Iowa had been acquiring
and cleaning up properties on the
4th Street Peninsula and South Ice
Harbor to allow for eventual
redevelopment of it's central
riverfront. Significant funding ~vas
secured by the City/'or development
and implementation of a new vision
for the area. The vision that emerged
was ora world d~ss, mixed-use
destination with the Mississippi
Pdver as it's focus.
UIKS assembled a multi-disciplinary
team of real estate analysts, urban
planners, architects and engineers to
join with the City in crafting a long-
term master plan for a new "Port of
Dubuque." The efforts resulted in a
detailed development framework and
comprehensive set of design
standards for establishing a series of
new, regional water related
attracdom supported by a diverse
mix of otSices, shops, restaurants and
homes.
Port of Dubuque
Dubuque, Iowa
Design Standards
UIkS landscape architects and urban
designers assisted a 10 member
committee comprised of City start
and area stakeholders in the creation
of a comprehensive set of design
standards to guide the redevelop-
ment of' the 75 acre Port of
Dubuque. Located adjacent to the
central business district, along the
Mississippi Kiver the project area
will serve as new mL'red-use
downtown neighborhood. The
stxndards are divided into 2 major
categories: Built Form and Public
ttealm. They were crafted in
conjunction with a broader master
planning effort for the port of`
Dubuque and w/il guide private
developers in the design of new
fac/I/des as wel/assist the City in the
project review and permitting
process.
Downtown Development Plan
Although downtown Ames had
successfully maintained its overall
viability through three previous
decades, UtKS was hired by the City
to help define and strengthen down-
town's future role in the region
through the preparation ora plan for
revitalization and redevelopment.
Planning and design work was
premised on preparing downtown to
take best advantage of its quaJities
and to reinforce its long-term
The plan was founded on a set of
fundamental principles identified and
confirmed in a series of community-
wide and focus-group meetings. The
principles included recognizing and
building upon downtown's existing
strengths such as the historic
structures, the overaJ2 compactness,
the two inherently different
subdistricts, the com-fortable scale
and pedestrian orientation of the
older d/strict, the exis6ng diversity of
uses and activities, and residential
neigh-borhoods adjacent to
downtown.
Implementation of the Plan's first
priority projects -- the construction
of pedestrian improvement cord-
dors linldng major downtown
act/v/des -- is currently underway.
Champaign Downtown Area
Champai§n, Illinois
UKS worked w4th a committee of
merchants, properW owners and public
officials to identi~ strengths and
weaknesses of downtown Champaign
and £on~anlate a vision for the future.
UKS team leaders presented a series
of alternative policy directions for each
of the n2jor issues. B~sed upon ensuing
discussions with the committee and a
market analysis, LYKS drafted a series
of go~s, objectives and policies in three
areas: physical environment, market
response and downtown orgamzafion.
The land use plan identified an area for
intenf~ve development, which included
a rp2~xed office-retail area, a retail
revitalization area and an historic
preservation emphasis as well as a
location for railroad-theme commerdal
development. Alternative sites were
presented for a conference center, .dvic
plaza and muir-modal transportation
center. Streetscape recommendations
were aimed at improving the pedestrian
environment and linking the dements
of' downtown.
Special emphaf~s was ~ven to defining
the roles of the City, and private interests,
creanng a stable orgamzafion for down-
town planmng and improvements and
identifying implementation activities
and funding.
Revitalization Plan
Downtown and Riverfront Pla n
DePere, Wisconsin
In Order to revitalize the CJfs downtown
area on the scenic Fox Kiver, the
Redevelopment Authori~- ofDePere irfitiamd
a major redevelopment prognmmTwo key
concep~ emenged in the plan: Sa'eetscape
improvemenm for an extem/ve pedestrian
circahtion system link/rig downtcrem
destitutions and dae rivm-fron~ and a new tr~c
circc&fion and parking plan wh/ch/mproved
accessibilky to existing bus/nesses while linldng
new commercial development sites to the
A key elmment in the Stree~cape Plan was to
create a better appreciation of the adjacem Fox
P..iver. In ici early years, DePe~e thrb'ed on ks
Great Lakes shipbuilding industry. The Fcr~
l:Uver vms the artery which connected it to
Green Bay and Lake Michiga~
UIKS recommended a reNm~a of awareness of
the fiver as a scenic and recreational resource
through the ~eation of an interpretive
r~iv~nt park. 2~he 1~near park cormects
upstream open space to a recently, completed
acdve downstrmm park, and a rivemralk along
the waters ed~.This provided the setting and
Jncentius for new residential dexeJopment. The
Central Focus of the park is a riverboat hnd/ng
plaza that serves the excursion boat indusuV as
well as recreadoml boating.
Springfield Greater Downtown Revitalization Plan
Sprin~eld, Missouri
This plan described a coropreheusive
approach to bringing new businesses,
housing and cultural actMties to an aging
commercial core, an adjacent redevelop-
ment area and nearby neighborhoods.
The plan addressed: land use; roadway
system, park/ng and transit; streetscape
and pedestrian drculation; arts, enter-
~nmenr and conventiom; parks, plazas,
open space and creek restoration;
building facades: linkages to surrounding
districts: economic developroent; an
organization for managing reinvest-
merit and marketing; and a detailed
~mpleroentation p rogran'~
Key theroes were enhancing the
pedestrian environroenr and creating
a development pattern that is compact,
fine-grained and dive~se Implementation
is underway.
River Falls Urban Design
River Falls, Wisconsin
The City- o£P,2ver FalIs,VTiscons/n
asked UiKS and ESG to assist in the
preparation oF a new downtown plan
to guide economic and physical
improvements in the central business
district. Residents of the City had
previously identified several key
issues they wanted the urban design
section of the plan to address:
· Strengthen phySical and visual
access to the adjacent
KJnnickinnik River
· Preserve and protect the historic
"Main Street" character of the
CBD
· Develop a set of Design Guidelines
for the downtown
· Develop a series of visual tools to
promote a clearer vis/on for
redevelopment
· Create a framework for
implementation
U!KS urban designers and
community plarmers worked w/th
citizens and bus/ness leaders in a
series ofpubl/c meetings to clarify
issues, define goals and objectives,
develop design criteria, and prepare
plans, sketches and guidelines which
were incorporated into the overall
downtown plan.
Downtown Streetscape Plan
Iowa City, Iowa
The downtown streetscape plan for
Iowa City was the result o£a two-year
effort led by downtown business and
property owners. The plan encompasses
almost 12 square blocks including an
early 1970's pedestrian mall.
Downtown Iowa City serves a dual
function as the city's business and
economic center as well as the nmin
commercial and entertainment center
for the University of Iowa. The rich
architectural setting, induding many
turn-ofq:he-cenmry buildings, combined
w/th the City's d/verse group of users,
led to a design and improvement strat-
egy that uses highly durable nmterials
witkin the context of historical design.
URS' urban designers worked with
the City's downtown streetscape com-
mittee to facilitate the design and
public input process that resulted in
a $3 million construction effort.
Excelsior Central Core
Excelsior, Minnesota
The City of Excelsior wanted a plan to
manage do,amtown parking supply to
promote new development while main-
raining adequate parking. BRW devel-
oped a parking demand model of the
downtown area to evaluate the parking
impacts of land use development. The
analysis considered conditions for the
typical weekday peak parking demand
as well as for a summer weekend.
In addition to analyzing existing parking
counts, the parking demand analysis
yielded a range of furore demand fore-
casts linked to the various downtown
development possibilities. The parking
study identified alte~Tmtive locations for
additional downtown public parking
fadlities and identified development costs
for both surface and structured parking.
The parking implementation plan
included recommendations for a parldng
facility maintenance pmgxam, =m. fidelines
for parking facility design and striping,
a parking monitoring program and a
variety of financing options.
Parking Study
University of Michigan
Expanded Parkin§ Paradigm Study
Ann Arbor, Michigan
Because of continual parking expansion
and land, roadway and cost cons=aints,
the University of Michigan sought to
expand its conventional parking paradigm
to include a variety, of transpo~mtion and
parking options.
The U!KS study included reviewdng
successful travel demand management
plans and contacting several other
universities that t~ad implemented similar
progTams. The UI:kS team met with a
conzmittee of University faculty and
stagto review existing travel characteristics
and the range of alternative travel manage-
ment strate~es. Based on this review, a
recommended plan was developed that
consisted of the following elements:
· free bus pass pro.am in conjunction
with the Ann Arbor Transit Authority
· development of park-and-ride facJ~ties
· expamion of parking options to include
remote and fringe parking areas
· increased enforcement of parking
regmlations
· inxproved parking/transporranon
mm-kefing materials focusing on the
benefits of alternative transportation
· reservation of right-of-way for future
fixed-gnideway nxnsit.
Representative Projects
Downtown Beautification and Revitalization
PROJECT:
MCGREGOR ~ DOWNTOWN BEAUTIFICATION
MCGREGOR, IA
CHALLENGE:
The City of McGregor had established a Downtown Beautification Committee with the goal of providing
design criteria for improvements to the downtown commercial district. The Committee created a Concept
Plan, but required cost estimates and direction as to implementing the plan.
SOLUTION:
The City hired MSA to refine the Committee's Concept Plan, prepare cost estimates, and create a special
assessment plat. The plan calls for replacement of sidewalks and curbs with a bi-level sidewalk system,
installation of colored-impressed concrete in specific areas, new period street lighting, handicapped ramps,
and decorative railing.
RESULT'.
MSA met with the Main Street Beautification Committee and the City Council numerous times to
determine the f'mal design parameters for the project. A special assessment plat was created and several
public meetings took place to explain the project to the citizens and property owners of McGregor.
The Council approved final plans and agreed to revise special assessment. The project is currently under
construction and on schedule.
Conceptual sketch of the new downtown in McGregor, lA
PROJECT:
STRAWBERRY POINT - DOWNTOWN REVITALIZATION
STRAWBERRY POINT, IA
CHALLENGE:
The City of Strawberry Point had established a Streetscapes Committee with the goal of providing design
criteria for improvements to the downtown commercial district. This group had come up with ideas, but
needed further direction ptior to making any recommendations to the Council.
SOLUqYlON:
The City hired MSA to conduct a Downtown Feasibility Study, which would provide alternative projects
with cost estimates, recommend a preferred alternative, and identify potential funding sources
RESULT:
MSA outlined three aitematives that included replacement of some or ail of the downtown sidewalks,
installation of period lighting, some colored and impressed concrete, and ways of addressing coal bins
beneath the existing sidewalks. The preferred alternative was to provide decorative lighting, and a colored
and stenciled concrete accent along the roadway side of the sidewalks in the project area. This akernative
also includes the replacement of all of the defective concrete sidewalks within the project area. A cost
estimate was provided and several potential sources of funding have been identified. Due to the timing of
this study, the City was able to request funds through the State of Iowa's Vision Iowa Progam as part of
the McGregor-Marquette Area Legacy's Vision Iowa application.
The City's next course of action is to secure any funding available through State or Federal agencies,
complete a Special Assessment Plat & Schedule, and move forward with final design.
PROJECT:
WYOMING - DOWNTOWN REVITILIZATION
WYOMING, IA
CHALLENGE:
The City of Wyoming is known as "Christmas City" for its Christmas Festival in December. Holiday
lighting creates a web of color above Ma'm Street as cars pass through with their lights turned off. Officials
wanted to improve the downtown's appearance.
The City's downtown has become an unattractive area that is hazardous to pedestrians. Sidewalks are in
disrepair, and there are extremely high curb heights with no handicapped accessible ramps.
SOLUTION:
The City hired MSA to conduct a Downtown Feasibility Study, which provided alternative projects with
cost estimates; recommended a preferred alternative, and identified potential funding sources. The City
would like to improve handicapped accessibility, the condition of the sidewalks, install period lighting, and
demolish some derelict buildings. In place of these nm-down buildings, the City would Fike to create a
parking lot with rest room facilities and a park. ·
RESULT:
MSA has met once with the Downtown Committee to discuss design parameters and brainstorm as to
amenities to enhance the downtown and the Christmas City Festival.
The next step is for MSA to conduct a field investigation of the downtown to determine what type of work
can be completed and create some preliminary, drawings and estimates. These drawings and estimates will
be presented to the Committee for review and revision.
Ultimately, the City will approve a preferred alternative and identify potential funding sources, including
the National Scenic Byways Program since the City's Main Street is part of the Grant Wood Scenic Byway.
PROJECT:
MAYVILLE DOWNrrOWN REVITALIZATION
MAYVILLE, WISCONSIN
CHALLENGE:
The City was faced with the problems of flooding storm sewers, undersized water main, old sanitary sewer,
excessive street crown, and hazardous pedestrian traffic flow. It was decided that downtown beautification
was necessary. However, the local business owners did not want to give up their angle parking.
SOLUTION:
City officials, contractors, engineers, and business owners all worked together on this project. In the early
planning stages, a Downtown Beautification Committee developed a "streetscape' plan. A theme was
chosen that reflected Mayville's metal industry heritage and the tree guards were locally made at Rediske
Specialties.
The existing 75-ft. wide Main Street was hazardous for pedestrians at the crosswalks. As a safety measure,
"bumpouts," peninsula-shaped areas of sidewalk, were constructed to reduce the street width at crosswalks
to 37 feet. During construction, pedestrian access was maintained to minimize the impact on businesses.
This minimized adverse impacts to downtown merchants.
RESULT:
Three blocks of urban roadway section were built in 80 worldng days. The project consisted of 23.360
square feet of sidewalk, 3,300 linear feet of curb and gutter, 1,320 linear feet of water main, 1,190 linear
feet of sanitary sewer, and 1,650 linear feet of storm sewer. A decorative lighted fountain now adorns the
main street entrance. For the past few decades, it had served as a cast iron planter in the local cemetery.
Trees and decorative planters also add to the beautification of the downtowm
Completed downtown
beautification project in Ma)mille, WI
Historic District
PROJECT:
ACCESS TO DOWNTOWN HISTORIC DISTRICT
CITY OF GALENA, ILL1NOIS
CHALLENGE:
The existing concrete, block-long stairways connecting Bench Street and Prospect Street were structurally
deteriorated and had been closed for a number of years. The stairways are in a historic district, one block
northwest of Main Street and any repair or replacement needed to duplicate the original construction.
Access to the site for demolition and construction on the steep hillside, coupled with the narrow streets
above and below, was a major concern.
SOLUTION:
Cast-in-place concrete stairs were designed and consmacted to match the original nineteenth century
consWaction. Light standards were constructed of cast-in-place concrete after a search for manufactured
replicas failed. Railings and detail work on the landings also were constructed to match the original
constmction.
RESULT:
The project was completed with ISTEA funding. The reco~tructed stairways are a focal point in this
historic area and are visible from the downtown area, as well as from across the river in Grant's Park The
stairways allow tourists easy access ro vistas overlooking the city.
New concrete steps match the original 19th century construction in downtown Galena, IL
Planner of Record
PROJECT:
ASBURY - CITY PLANNER OF RECORD
ASBURY, IA
CHALLENGE:
The City of Asbury in the 1940s was a small quiet community, mostly comprised of local farmers. Land
was hilly, picturesque and rural farming in nature. Due to the community's proximity to a four-lane
highway and Dubuque, a large Iowa municipality on the Mississippi River, the City began to grow rapidly
during the late 1980s and 1990s and became a popular single-family bedroom community. It was growing
so fast that residential subdivisions were being proposed too frequently for the plan commission to react
comprehensively, several private water systems were causing cuncm-n, no land use plan was in place, and
the City of Dubuque was expanding its boundaries thru annexation into and around Asbury. In 1997, the
City received a Planned Urdt Development (PLrD) proposal for a 40-acre mobile home park fight in the
middle of land that was prime for medium to high-income single-family development. The City was
working with six different engineers, had no professional planners and had little coordination between all
professionals provicFmg input to the growth and management of the community. There was no agreed upon
vision for the Asbury Plan Commission, City Council or developers.
SOLUTION:
MSA was contacted due to the company's reputation for full-service municipal planning and engineering.
MSA proposed to become the City's one-stop on~call planner of record to coordinate and gaide current and
future development. This included providing input to all preliminary plats, final plats, PUDs, landscaping
plans, zoning amendments and variances. MSA was also hired to provide input into the land use p!anning
process, housing development, GIS/LIS mapping and land record modernization. Furthermore, MSA was
hired to provide on-call engineering services for design and inspection of minor and major infrastructure
improvement projects.
RESULT:
Since being hired by the City of Asbury, MSA has reviewed plats, PUDs and ordinance changes on a
monthly basis. MSA has conducted a cormnunity-wide Housing Needs Assessment (HNA) that determined
the residential growth and management planning for all new housing in the City of Asbury. The I-INA also
included an action plan that outlined what developers and the City must do to accomplish sought after
residential development, including financing and developmdnt restrictions. We are working with the City
to develop a 100-acre parcel of land throu~a a newly created Economic Development Corporation. We
have designed and inspected park improvements, road improvements, and neighborhood sewer/water
system improvements. A GIS mapping proposal is being negotiated to use natural resources, infrastructure,
transportation facilities and acreage mapping for annexation negotiations with the City of Dubuque. MSA
has also been involved with AGREE (a multiple municipality organization that Asbury is a member of) to
help make better land use and transportation decisions, as well as to find ways to cost-share municipal
services where overlap exists.
Land Use
PROJECT:
BURKE - LAND USE, PARK AND RECREATIONAL PLANNING
MADISON, WI
CHALLENGE:
During the last 10-20 years, the Town of Burke has become a fragmented land area due to annexations by
neighboring cities and the expansion of major transportation corridors. During this same t/me, development
pressures have continued to explode in this urban township in Dane County, just outside of Madison. As
population continued to come and go, the changing and more non-rural citizenry began to require improved
Town services and amenities. The Town also became sophisticated during this time, taking on projects
involving environmental preservation, utility district creation, business park development and storm
drainage management. Furthermore, the Town's landfill had reached capacity and needed to closed, capped
and managed. The Town asked MSA to help find a future use for the land in and around the landfill. With
all these issues, the Town needed to find a way to assemble a vision for their population and what was lef~
of their land area. Furthermore, a plan for how to integrate all aspects of the Town's amenities needed to be
created and agreed upon by all Town officials and staff.
SOLUTION:
In order to deal with development proposals from prospective housing and business oppommities, as well
as better serve their current and future residents needs, the Town hired MSA to create a Land Use Plan.
They also hired MSA planners to prepare a parks and recreational plan for environmental corridor
preservation, trail integration and park development. As part of the Town of Burke future visioning
processes, the Town Board identified the need to create a center for Town activities to better serve their
constituency. MSA engineers found that the best use of the land adjacent to the landfill was minimum
impact surface activities and created a site plan with a system of trails, ponds, playground, soccer fields and
a pavilion. The Town also decided to integrate principal Town activities (Town Hall, Public Works
Garage, Voting Poll, Board Chambers, Utility District Operations, etc.) with this furore central park. MSA
created the site plan £or the new park surrounding Town Hall, working directly with Town officials, County
officials and local volunteers. The ultimate park plan entailed constructing a natural pond, grading and
reshaping portions of the site, designing some park trails around the sealed landfill site, construction of a
new pavilion and installation of new ADA-compliant playground equipment. MSA worked with the county
and local volunteers to secure ADLP money from the DNR
RESULT:
In early 1998, the construction of the new Town Hall and public works garage was completed. The park
has been constructed on adjacent land to the Town Hall. The now inactive landfill is mostly surrounded
with trails and wetlands. As the Town Park has grown into a central feature of the Town of Burke, the
Town Board is working on new park phases/amenities to expand and improve the park further.
PROJECT:
ARLINGTON - MASTER PLAN
ARLINGTON, WI
CHALLENGE:
The Village of Arlington has historically been a small mraI farming community just 20 minutes north of the
Madison, Wisconsin, metropolitan area. It is comprised of mostly retired folks, many of which left their
farms in the neighboring area for various reasons. The land surrounding Arlington, the "Aflin~on Prairie",
is the most fertile agricultural land (prime agricultural soils) in the State of Wisconsin. Due to proximity to
Madison, Arlington was experiencing residential change and becoming a bedroom community for
employment commuyers to Madison and Dane County. From a 'development standpoint, soils are moist,
flood easy, and are classified as wetlands in many areas. Infraslrucmre-wise, the Village did not have their
own water tower, their wastewater treatment plan was undersized and obsolete, there were limited
regulations in place to control and pass on development costs to developers, and physical improvements
(sidewalks, curb, gutter and a second raikoad crossing) were needed in and around downtown. The Village
did not have an industrial park for new commercial and industrial investment, job creation and property tax
relief. Downtown revitalization was a concern since the grocery store left town, parking availability was
1/mited, and sidewalks were non-existent or in bad shape.
SOLI ION:
The Village Board hired MSA to create an update to their Master Plan. The Village Plan Commission
Would oversee the process and a Task Force of Village Staff, local citizens and businesspeople would be the
daily planning body. The Master Plan Update would be realized through the following six traditional
planning stages: 1) Existing Condition Analysis of land use and demographics for the area, 2) Nominal
Group Technique and Community Goals and Objective formation, 3) Land Use Plan creation, 4)
Transportation Plan creation, 5) Public Utility/Infrastracture Plan creation, and 6) Capital Improvement
Plan/Program (CIP) creation.
RESULT:
The Arlington Village Board created a 12 member Master Plan Update Task Force. Major components of
the final plan focused on:
1) providing adequate fire safety water pressure to res/dents and businesses-a new water tower and well,
converting the existing well to emergency use only,
2) upgrading the WWTP system to meet DNR standards and allow for industrial and residential
development,
3) implementation of the CIP's financing s~:ategies for capital improvement projects,
4) Improving the Village's entrance-ways and downtown thru physical enhancements,
5) Creating a new Industrial Park and residential subdivision where soils, infras~racmre and land use
compatibility conditions is favorable,
6) Land acquisition, and
7) Creating a financial incentives program for attracting business and industry to town. In order to better
understand and manage each component, a separate "Land Use Plan", "Transportation Plan" and "Public
Utility Infrastructure Plan" was created that comprehensively encompassed al! planning components.
Comprehensive Planning Pro]eels
PROJECT:
ANTIGO - COMPREHENSIVE PLAN UPDATE
AN~flGO, WI
CHALLENGE:
The City of Antigo is a community of 8,276 persons that was experiencing unharmonions land use patterns
throughout the City, limited industrial e~:pansion oppommity, and problems with commercial tracks
entering and leaving the City. tn an effort to plan a more harmonious land use development pattern and a
more efficient transportation system for commercial trucks, the City wanted to update its 1982
Comprehensive Plan.
SOLUTION:
The City used the visioning process developed in Corvalis, Oregon. "Visioning" is a slight deviation of the
traditional planning process. It is more publicly participative and values oriented, and forces community
officials and residents to decide what they want their community to look like independent of past trends.
The visioning model calls for a four-phased process which includes: development of a community profile
and value statements; development of a probable development scenario if current trends continue;
development of a preferred development scenario, or vision, if current trends are modified to arrive at a
more desirable famre; and development of an action plan, which identifies strategies for implementing the
preferred development scenario.
RESULT:
The dral2 action plan developed for the City of Antigo, made recommendations for activities in the
follo~ving categories: Community Character, Natural Environment, Public and Community Facilities and
Services, Park and Recreation, Housing, Municipal Utilities, and Economic Development. The broad goals
or "visions" for famre land use and development and transportation identified during the process included:
encourage a more coherent, consistent land use pattern within the Antigo Area, with community growth and
development occurring in an organized, orderly, appropriate manner that is sound and attractive; identify
and develop land that will be made available to help existing businesses expand and to attract diverse
induslrial businesses to the City; regulate fringe commercial development so that it occurs in a controlled
and aesthetically pleasing fashion; promote a clustering of residential densities and housing types that
preserve the overall quality and appeal of local residential neighborhoods; and promote the development
and maintenance of a weIMntegrated and cost-effective transportation system within the Anfigo Area that is
capable of moving people and goods to, from, and within the area in a safe and efficient manner.
PROJECT:
BEAVER DAM ~ COMPP._EHENSIVE PLAN
BEAVER DAM, WI
CHALLENGE:
The City of Beaver Dam is a regional commercial and industrial center for a 30-mile radius in western
Dodge County, Wisconsin. A newly upgraded USH 151 roadway connecting the area to Madison and Fond
du Lac has created the potential for growth in the community for both residential commuter housing and
new job creation based on transportation links. The natural amenities of Beaver Dam Lake and the rolling
rural landscape have encouraged expanded fringe residential development both in the city limits and
surrounding township lands. A combination of an established downtown business district and a regional
shopping center have divided the commercial district and also created difficulty for the City because of
dispersed infrastracture spending.
Beaver Dam's land use roots have always been in commercial and manufacturing activities. The
community expressed concerns about the impact of new business and industry locations, transportation
needs, and the effects on the existing residents and taxpayers. The city also needed to upgrade their
mapping, utility information, and extraten'itorial land use expectations to influence the direction of
development on its borders. A dated 1974 Comprehensive Plan had not been reviewed or updated since
adoption by the Plan Commission in that year. The City Council believed that the expectations of the
community had significantly changed over the past 25 years. Investment in downtown revitalization and
neighborhood housing projects also needed support and direction from the City and Plan Commission.
SOLUTION:
The City decided to:
Complete aerial photography of the City and surrounding land area, including topographic mapping
of all lands within one mile of the city lira/ts, to use in utility service area discussions and land use
planning. This material formed the "base line" information for mapping and discussions in the
Comprehensive Plan process.
Hire a planner to update their existing 1974 Comprehensive Plan. This included identification of
potential growth areas, land uses, and resulting infrastructure needs for the City and surrounding
developed area.
o
Follow up with utility system plan~mg based on the updated Comprehensive Plan to include roads,
stormwater, sanitary sewer, potable water and private utility impacts, and system upgrades. This
project will result in a Capital Improvements Plan for existing infrastructure and impact fees for
utility extensions to new developments.
MSA has been hired to oversee and accomplish the projects outlined above in a four-year phased contract.
During Phase 2 of the project, MSA planners and engineers served as the staff for the Plan Commission as
they prepared the base mapping, identified issues, and proposed action steps needed to complete a new
Comprehensive Plan for the City of Beaver Dam. MSA worked with Dodge County pla~'mg efforts to
coordinate mapping and orthophoto base materials.
RESULT:
The City has acquired and uses aerial photography and topographic mapping in utility planning. The Plan
Comrmssion and City Council have adopted an updated Comprehensive Plan for the year 2010, including
many of the elements of the new State Planning le~slation even before the state statutes were amended.
MSA continues in Phase 3 activities to prepare utility system mapping and plans for future development.
The City has requested assistance on indusUSal park planning and infrastructure development. And, MSA
currently administers the city's housing rehabilitation and financial assistance program.
The City of Beaver Dam has updated mapping and aerial photography to assist current and furore property
owners and public officials in decision making, prepared an updated Comprehensive Plan for direction on
land use issues, and provides on-going assistance in the implementation of the plan via utility systems
analysis, indusi~:ial and economic development planning, and housing assistance. Phase 4 of the process
calls for individual neighborhood planning, and downtown redevelopment plans. The Comprehensive Plan
will be officially reviewed alter 2004 to determine any needed updates and to make the overall project
compliant with the recent State Smart Growth legislation.
Proper planning preserves' Beaver Dam Lake in Beaver Dam, WI
PROJECT:
HAYWARD - COMPREHENSIVE PLAN
HAYWARD, WI
CHALLENGE:
The Town of Hayward, a Wisconsin community with a population of 3,382, is located in Sawyer County
surrounding the City of Hayward. This northwest Wisconsin town sm~:ounds the City of Hayward. During
the past 20 years, the Town has experienced tremendous growth, especially seasonal residential growth.
Most of the new seasonal residential developments within the Town have occurred near water bodies,
including Round Lake, Little Round Lake, Hayward Lake, and the Namekagon River. In the vicinity of the
City of Hayward, the town has experienced growth in commercial and year-round residential developments
in the past 20 years. New commercial developments within the Town have primarily occurred along the
main highways that enter the City of Hayward. The Town's rapid growth during the last two decades has
created concerns about its ability to support future developments with a proper community infrastructure
and services. In an effort to better plan for the expected growth and promote harmonious development
patterns, the Town decided to prepare its first ever comprehensive plan.
SOLUTION:
To accomplish its desire for a comprehensive plan, the Town decided to use a cross between the
"traditional" pliuning process and the "visioning" planning process in the preparation of a plan. The
traditional plann'mg aspect of this hybrid pliuning process looked at past and current trends and
characteristics within the Town and the sm-rounc~mg area, and then compiled this data into nine element
profiles. The nine element profiles included: community profile; economic development; housing;
transportation; public and community facilities, services and utilities; recreational, historical, and cultural
resources; natural resources; and existing lind use. The visioning aspect of the planning process promoted
more public participation by encoura~ng town officials and residents and other interested individuals to
take an increased role in deciding what they wanted the Town to look like in the furore. This aspect of the
process called for the development of baseline population, housing, and labor force forecasts; the
development of issues, oppommities, and constraints by broad categories; the development of plan concept
scenarios for future land use patterns based on expert testimony; the development of a desired development
scenario and 20-year land use plan; and the development of goals, objectives, and an action plan, which
identified strategies for implementing the desired development scenario and 20-year land use plan.
RESULT:
The nine .element profiles of the Town's comprehensive plan were prepared as sources Of reference
information to be used in the future by the Town and other interested parties for important decisions.
During the planning process, these element profiles w~re used by the Town's planning committee, plan
comroission, and board for deriving many of the key £mdings and recommendatinns o£ the Plan~ The goals,
objectives, and action plan and land use plan elements of the comprehensive plan were prepared to provide
the Town with a guide for future community decision making and for use as a growth and development
policy insWUment to help ensure the coordination for both public and private development. In addition,
these plan elements were prepared for use as advisory tools by local officials for providing a rational basis
to draft and revise local regulations and ordinances (land use, zoning, subdivision, etc.) that have a
sig~ficant impact on what the Town looks like.
Some of the key objectives identified by the To'~m within the comprehensive plan included: cooperating
with surrounding communities in future economic development decisions, increasing availability of
affordable housing; improving traffic flow patterns; providing municipal utility facilities and services to
densely developed areas; providing adequate park and recreational facilities to existing and proposed
residential areas; protecting environmentally and natural resources sensitive areas; and promoting orderly,
harmonious, and rational growth and development patterns. The hybrid planning process used for the
preparation of the Town's comprehensive plan addressed all the required plan elements stated within
Wisconsin's comprehensive planning statute, 66.0295, which is commonly known as the" Smart Growth"
law.
With Comprehensive Planning the surrounding
beauty in Hayward, g~7[ remains intact.
PROJECT:
POLO, iL - COMPREHENSiVE PLAN
POLO, IL
CHALLENGE:
The City' of Polo is a smaller community located between four larger communities, and has experienced
little or sometimes ~negative growth. Their population decreased slightly between 1990 and 2000. The
downtown is plagued with a 39% vacancy rate. The City has undergone several strategic planning efforts in
the past five years, but has fallen short of successfully implementing those objectives.
SOLUTION:
The City Council hired MSA to create a Comprehensive Plan with a strong emphasis on implementation. A
Task Force of City staff, local citizens, and business people has been created. The Comprehensive Plan will
be realized by incorporating the existing strategic efforts from recent years into six traditional planning
stages: 1) Existing Condition Analysis of land use and demographics for the area, 2) Nominal Group
Technique and Community Goals and Objective formation, 3) Land Use Plan creation, 4) Transportation
Plan creation, 5) Public Utility/Infrastructure Plan creation, and 6) Capital Improvement Plan/Program
(CIP) creation. In addition, there will be a retail market analysis for the downtown, and an economic
development marketing strategy created. Other areas of focus will include potential industrial
developments, residential development, construction of a recreational path, and tourism attraction
strategies.
RESULT:
To date, the City of Polo has begun evaluating existing conditions in the community. Existing Land Use
conditions are being surveyed, and all downtown buildings have been inventoried as to type of business and
vacancy status. It is anticipated that the full Comprehensive Plan will be done and adopted by late Fall
2002. Recommendations for ordinance updates, marketing strategies, grant assistance, capital
improvements, and potential incentive packages Mil be included in the final document.
The town of Polo, IL is a well organized community due to Comprehensive Planning ·
PROJECT:
SAVANNA - COMPREHENSIVE PLAN, CAPITAL IMPROVEMENT PROGRAM & ECONOMIC
DEVELOPMENT STRATEGY
SAVANNA, IL
CHALLENGE:
As a result, The City of Savamaa and area communities were significantly impacted by the closure in 2000
of the region's major employer, the Savanna Army Depot, a federal repository of munitions and
testing/mining center and school. When the Depot closed, approximately 450 jobs were lost. As a result,
the City and reg/on needed to plan for the future, finding solutions to replace lost jobs and wages, and
reverse the declining population and economic indicator trends. Furthermore, due to the unique
characteristics and location of Savanna, numerous topographical and environmental issues had to be
analyzed to properly plan for desired and cost-effective development.
SOLUTION:
With financial assistance from the Department of Housing and Urban Development (HUD), the City
initiated a comprehensive planning process that included land use planning, capital improvement budgeting,
and the creation of a unique economic development strategy. MSA planners were hired as plan facilitators
to collect and disseminate survey results, organize planning commission goals and objectives, and
coordinate alt development projects with city and private organizations.
RESULT:
A year-long planning project resulted in a Comprehensive Plan. a Capital Improvement Program (C1P), and
an Economic Development Strategy that incorporated volunteers, ideas and commitments from the City,
Chamber of Commerce, Main Street progran~ special church organizations, and local youth groups. The
City's final plans were also compared against Hanover, another community severely affected by the
Depot's closure, and the Depot's Reuse Plan for consmtency and coordina6on. The plan calls for
residential development to serve tourist~second home markets, new single- and multi-family housing for
existing residents, redevelopment of the abandoned ralkoad corridor, and downtown/riverfront expansion.
Tax Incremental Financing (TIF)
PROJECT:
TIF PARTICIPATION FORMULA
VILLAGE OF BELLEVILLE
'DANE ANVD GREEN COUNTIES, WISCONSIN
CHALLENGE:
In 1995, the Village of Belleville created TIF District #1. The purpose of the TIF was to create an industrial
park and fund necessary improvements. Related to the creation of the industrial park and also outlined in
the TIF redevelopment plan (TIF program projects) was the improvement of the central business district
(CBD). Overall, the Village wanted to attract industry to their village to ease the tax burden. Furthermore,
they were seamhing for ways to improve their downtown by eliminating blight, relocating some heavy
commercial operations, create new jobs (family supporting, if possible), and enhance existing downtown
commercial, social, and governmental functions. After initially attracting two large out of town industries
(Gemplers and SICO) to their industrial park thru TIF incentives, two local industries (Francios Oil and
Cates Machine) came to the Village Board asking for similar financial assistance thru the use of TIF. In the
past, the Village had provided TIF assistance to businesses that were bringing a plethora of new jobs to the
community and investing heavily in private resources inside the TID (TIF District) boundaries.
Unfortunately for the Village Board, the local developers were seeking a very high level of TIF
involvement (similar to Gemplers and SICO) while providing limited financial return to the Village.
Furthermore, locals were intent on having the TIF pay itself off in less than the 23 years allowed, which
bigger projects tended to do more easily. In fact, they were progamming for TID closure in 2009 - I4
years after creation.
SOLUTION:
The Village Board sought a way to place smaller local business proposals for TH) involvement on the same
level as larger out-of-town proposals. By doing this, they could reward businesses that had been in the
community for many years, provid~mg needed goods and services, jobs, and community support for years.
MSA created this TIF participation formula. It started by creating categories for ali variables related to the
project. The more variables that were met by each proposal, the more points or financial assistance a TIF
project proposal could receive. Job creation was the first variable. Points were given for each job created.
New jobs created that paid more than $12.00 per hour received more points than those paying less than
$12.00 per hour. Job retention was added for those local business that were threatening.to leave. Similar to
job creation, more points were awarded for those jobs retained that were paying higher than $12.00 per
hour. Assessed valuation was the third variable where points were given for every $10,000 of increased
assessed valuation a project brought to the TID.
Other variables that were evaluated and awarded points were for "aesthetic improvement", "environmental
improvement", "longevity value", "CBD Vacancy Improvements", and "Value-Added Multiplier." These
categories were created by the Village Board during brainstorming sessions. Aesthetic improvement
provided points for projects that performed CBD facade improvements, streetscaping, site improvements,
and eyesore elimination. Environ.mental improvement credited projects for remediating contaminated soil,
water or air pollution issues. Longevity Value provided points to businesses based on the amount of time
that enterprise operated inside the Village of Belleville. CBD Vacancy Improvement credit was applied to
those projects that did not create a new vacuncy in the CBD or that occupied a current vacancy. Negative
points could be awarded for projects that were relocating from th~ CBD to other parts of town and not
providing a replacement to their former site. Finally, value-added points were awarded to businesses that
had a spin-off effect on other commercial and industrial activities.
RESULT:
In the end, the Village ended up creating a TIF planning tool that helped deal with both financial and
political issues surrounding use of TIF revenues. It allowed the Village to evaluate smaller local businesses
that had supported the Village over the years on the same scale as prospective new bigger businesses. It
established a logical protocol for evaluating all TIF proposals. The Village did put a cap on the amount of
"credit" or "points" a proposal could receive. Their involvement was limited to the amount of TIY revenues
a proposal would bring into the Village's TIF fund over 5-7 years. Once the project '~points", and thus
Village involvement, were established, the Village attorney would draft a developers agreement for all
parties involved. This TIF participation formula is not set in stone via ordinance or resolution, The Village
Board has the right to deviate from this formula on a project-by-project basis.
O
Visionin Process
Jim Holz, an MSA Senior Planner, has been involved with the City's Downtown Master Planning project since its
inception at the City-Sponsored Housing Action Conference. At the conference, he was a member of the group
recommending the need for a Downtown Master Plan. He continued his involvement as a member of the
Downtown Comprehensive Plmming to Plan Group, which led to the creation of the Downtown Planning
Committee, a subcommittee of the Long Range Plsnning Advisory Commission.
Having been a committee member, Mr. Holz has witnessed first-hand the process undertaken to produce Dubuque's
Vision Downtown, and was present when the committee carefully chose the specific wording for each Vision
Statement withSn the six Dimensions of Vision Downtown.
Dubuque, Towa
Completion Date: 2002
Durrant's study and recommendations for
opening Main Street from 5th to 9th Street
were well received by the City of Dubuque.
A 4-Phase project resulted that will replace
the pedestrian plaza created during the
urban renewal of the early 1970's.
The Durrant Team spent most of 2001
gathering information from the City of
Dubuque, Dubuque Main Street Limited,
property owners, downtown employees, and
the general public as well as through their
own observations and expertise to arrive at
the design taking shape today. Pulling
themes already in place at Third and Main,
City Hall, Cable Car Square and the
Dubuque Museum of Art, The Durrant Team
generated a combined theme that we believe
can be carried throughout downtown on
future streetscape projects.
The Main Street corridor through the former
Town Clock Plaza is a combination of an
open street and a pedestrian friendly plaza.
In addition to the physical improvements one
can see, several others were undertaken
which are hidden from view. With the plaza
surface removed, the sewer, weter and
electrical systems were all overhauled. The
new installations were designed to provide
enough capacity to handle the storm water
drainage from the reconstructed street and
plaza areas; provide a water source in each
block for watering of plants and supplying
water for festivals; and provide sufficient
electricity in each block (two duplex outlets
on separate circuits per light pole) to power
holiday decorations and festival food
vendors. This infrastructure was included to
ensure that Main Street is ready for the next
100 years of service.
Sioux City, Iowa
Completion Date: 1996
The objectives of this urban study and design
for the City of Sioux City were to enhance the
opportunity for development of new and
existing businesses through revitalizing and
maintaining the Historic District. Structures
within reinforced the historic character and
significance of the District creating a safe and
comfortable pedestrian environment. The
area encourages a variety of uses and
activities through its connection to the
adjacent Convention Center and downtown.
It provided a great opportunitY to attract
people to a unique shopping, dining and
entertainment experience within the District.
The study and design required an extensive
public input process and work with
stakeholder committees. Durrant provided
streetscape improvements, masterhPlanning
and design guidelines for the old 4t Street
District.
Durrar~
LELAND CONSULTING GROUP
PROJECT RI~ERENCES
Christine Maguire
Senior PLanner / Project Manager
CITY OF FORT WORTH
Fort Worth, TX
817.871.8187
City of Fort Worth, Texas
Fort Worth, Texas
Leland Consul~ng Group, together w~th HNTB, is currently engaged by the City of Fort
Worth, Texas to assist in evaluating existing conditions along five urban commercial
corridors from both an investment and urban design perspective. In an effort to
accomplish stakeholder and community objectives, LCG is providing the following
services: community and stakeholder workshops; analysis of investment area
character/stics wt-dch will affect development and redevelopment potential; evaluation
of the region's economic and demographic trends; identification of residential, office,
retail, entertainment, and civic development opportunities; formulation of strategies
designed to attract private sector investment to the downtown ~rea; evaluation of
appropriate vehicles for implementation of the development strategies; and, a summary
of potential public and private resources to further these efforts.
Mr. Jim Rees
City Development Group / Urban Projects
CITY OF COLORADO SPRINGS
6 Nqrth Tejon Street, Suite 200
Colorado Springs, CO 80903
719.578.6831
Southwest Downtown Urban Renewal Plan
Colorado Springs, Colurado
Lehand Consulting Group is currently engaged by the City of Colorado Springs to assist
in preparing an urban renewal phan for the Southwest Downtown redevelopment area:
As a follow-up to the Downtown Development Strategy, LCG is providing the £ollo~Sng
services: community and stakeholder interviews; analysis of Southwest Downtown area
characteristics which w/Il affect development and redevelopment potential; evaluation
of the region's economic and demographic trends; identification of residential office,
retail, and industrial development opportunities; a blight study documenting qualifying
conditions for urban renewal; formulatSon of strategies designed to a~ract private sector
investment to the Southwest Downtown area; evaluation of appropriate vehicles for
implementation of the development strategies; and, a summary of potential public and
private resources to further these efforts.
[] Leland Conmlriv. g Gwup, Real £state Scrateffxtx
LELAND TEAM REFERENCES
Mr. Chris Danielson
Economic Development Dffector
CITY Ol~ OAK PARK HEIGHTS
14168 North 57m Street
Oak Park Heights, Minnesota 55082
651.439.4439
For: Bob Kost
Ms. Naomi Larson
City Planner
CITY OF WEST DES MOINES
4000 George Mills Civic Parkway
. West Des Moines, Iowa 50265
515.222.3620
For: Bob Kost
Mm. Mike Koch
Public Works Director
CiTY OF DUBUQUE
50 West 13a~ Street
Dubuque, Iowa 52001
563.589.4270
For: Kevin Eipper~
Ms. Para Myhre
Associate Planner / Economic Development Office
CITY OF DUBUQUE
50 West 13m Street
Dubuque, Iowa 52001
563.589.4213
For: Kevin Eipperle
-- I Leland Consulting Group, Real Estate Strategists
PROJECT APPROACH
I Leland Consulting Group, Real Estate Strate~st~
Ms. Polly McMullen
President
DOWNTOWN LINCOLN ASSOCIATION
1200 N Street, Suite 101
Lincoln, NE 68508
402.434.6904
Downtown Economic Vision and Strategic Plan
Lincoln, Nebraska
Leland Consulting Group was engaged by tlre Downtown Lincoln Association to assist
in preparing an economic vision and strategic plan for Downtown Lincoln. Together
with Progressive Urban Management Associates (PUMA), LCG provided the following
services: community and stakeholder interviews; analysis of planning area
characteristics which will affect development and redevelopment potential; evaluation
of the region's economic and demographic trends; identification o£ residential, office,
retail, and industrial development opportunities; formulation of strategies designed to
. attract private sector investment to the downtown area; evaluation of appropriate
vehicles for implementation of the development strategies; and, a summary of potential
public and private resources to further these efforts.
Ms. Norma Urban
President
CORPUS CItKI~TI DOWNTOWN MANAGEMENWE DISTRICT
410 Peoples Street
Corpus Christi, TX 78401
361.882.2363
Downtown Housing Market Strateg'y
Corpus Christi, Texas
Leland Consulting Group was engaged by the Corpus Christi Downtown Management
District to assist in preparing a downtown housing market strategy. LCG provided the
following services: analysis of planning area characteristics which will affect
development and redevelopment potential; interviews with downtown property
owners, developers, employers, lenders and public officials; evaluation of the City's and
region's economic and demographic trends; identification of housing development
opportunities; and, formulation of strategies designed to attract housing to the
[] Leland Conwdting Group, Real&tare S~-ategists
SCOPE OF WORK
The following is an outline of the Leland Team's prelLrninary scope of work proposed to
complete the Downtown Comprehensive Plan for the City of Dubuque. We anticipate
making refinements in consultation with the City.
UNDERSTANDING AND APPROACH
Downtowns are reemergSng as re~oual destLnations in c/ties throughout the nation. 1lie
successful downtowns of the 1990s, such as Denver, Portland, St. Paul and Memphis,
have established a clear niche in their respective markets which capitalizes on the central
business district's inherent strengths. In virtually every downtown success story of the
1990s, development has been the result of nurturing and growing each diverse segment
of the downtown economy and marketbag these positive changes through an overall
image of vitality.
Solutions to downtown development challenges have become mulfi-faceted. No longer
can a downtown rely on a single economic eno-fine or project to propel its future.
Forming and advancing the downtown development agenda requires a keen
tmderstanding of the goals and aspirations of the community, the realities of the
marketplace, the peculiarities of the political landscape and the constraints of local
public/private resources.
The Leland Consulting Group Team is pleased to offer an approach to the City of
Dubuque and client team members desiomaed to accomplish the following objectives:
Building on past efforts, perform a market assessment of Downtown Dubuque's
various economic and physical sectors, identifying nid~e opporttmities for growth
aud development and establishing priorities for investment.
Engage the leadership of Dubuque, downtown stakeholders and interested
citizeus in a participatory process which moves the "Vision Downtown" goals and
objectives forw~d into achievable policies, plans and projects.
Balance the collective aspirations of the downtown community, the realities of the
marketplace, and the ava/hbility of public/private resources to craft a
redevelopment strategy for Downtown Dubuque.
Provide the City, and business leadership with a comprehensive assessment of
barriers, opportunities and impacts in order that future decisions are deliberate
and consistent with the overall strategy.
Elevate downtown in the overall civic agenda.
B Le[a~d Ce&tulting Group, Real £state Slrategists I
ROLE OF THE DOWNTOWN PLANNING COMMIi"rE~
The active participation of the Downto~m Planning Committee throughout the planning
process is critical to our team-oriented approach. We propose that the committee will
provide input and g~aidance to the consultants through participation at regularly
occurring project meeffngs. We also anticipate that the committee will participate in any
public meetings, open houses and/or Council presentations.
Phase I: Concept Development
Work Task 1.0:
Budget:.
Timing:
Objective:
Project Orientation and Initiation
$2,500
Weeks 1-3
Clarify the project's goals, establish protocols, and refine otrr
understanding of the project's background and context.
Leland Team
RFP Added Value Assigwtments
X 1.1
X
X
X
Work Task 2.0:
Budget:
Timing:
Obi ective:
Collect relevant project data including previous studies,
reports, projections, assessor's records, GIS and other
pertinent information. Expand on data collected for the Port
of Dubuque master planning effort and update findings with
current market and ptzysical information.
1.2 Set future meeting dates.
1.3 Establish lines of communication, and protocoJs mrd
finatize public engagement process.
1.4 Prepare project area base sheet and maps.
"Delivery System" Capacity Analysis and Existing
Conditions
$12,500
Weeks 2-5
Through interviews with leading area stakeholders, City staff
and community meetings, identify opporhmities and
cortsttaints to past and future public improvement and
economic redevelopment efforts.
Leland Team
RFP Added Value Assigns_merits
X
2.1 Establish a common baseline of technical information
useful in the downtown redevelopment strategy process.
Data wilt be used to understand physical and economic
I Le[and Cos,suDin,g Groz~p, Real Estate Strategists
2
opportunities and constraints on growth in the downtown
markeL
Physical data to be collected includes: land use inventory;
historic building designations; zoning; arterial and
collector street plans; utilities and infrastructure;
comprehensive and downtown plans; traffic data; and,
facilities information.
Socioeconomic and market data to be collected includes:
population; household and per capita income; consumer
expenditure patterns; sales tax data; visitor and
convention information; building permit activity;
development patterns; fiscal trends; and, assessed market
valuation.
X
2.2
In order to become better acquainted with Downtown
Dubuque and its various sub-districts, conduct: site
inspections; review relevant studies, reports and minutes
of Vision Downtown meetings; and, interview key
downtown advocates (i.e. city staff, its leadership and
staff, appropriate organizations and agencies, etc.
maximum of 25 Interviews).
X
Z3
Complete one-on-one meetings with key property and
business owners Including representatives of the
"development delivery" system such as public officials,
financiers, developers and others. The purpose of these
interviews will be to discuss opportunities and constraints
to past and futttre public improvement and economic
development efforts.
X
2.4 Tour the project area on-foot, bike, transit and automobile
and record issues and observations via photos and notes.
Conduct one-on-one Interviews with key city staff to
develop an In-depth understanding of the workings of the
downtown infrastructure, including parking and
circulatior~
X 2.5
Facilitate a community meeting to broaden community
participation and to incorporate qualitative knowledge or
"street sense" into the plan development process.
Advertise the meetings in the Mainstreet newsletter and on the
City's web page. Meetings will be conducted in a
workshop format, targeting specific segments of the
downtown community. The meeting will provide
participants an opportunity to learn about the process and
ffi Leland Co~zsulting Group, Real Estale Strategis[s
3
X
X
Work Task 3.0.'
Budget:.
Timing:
Objective:
X
participate in identification of action items for realizing
the goals identified in the Vision Downtwwn process.
Sessions will be designed to be results-oriented, providing
immediate ideas mad tools for revitalization. Meeting
summaries will be prepared.
2.6
Prepare a list of barriers in the communi ,hz's development
delivery system ideniified during the workshop and
incorporating commurdty perceptions identified during
interviews and meetings of opportunities, constraints and
past forces which have molded Downtown Dubuque.
2.7 Using the socioeconomic, market and physical data
previously collected and updated by the team as well as
qualitative perceptions gained through various public
outreach efforts, prepare a physical m~d market profile o£
the Downtown Dubuque area.
2.8 Facilitate a Downtown Planning Committee meeling to
review summaries o£ stakeholder interviews, commutdty
input and next steps.
Planning Workshop / Retreat
$6,000
Week 6 or 7
To umders~nd past and current efforts in order to gain insight
into their intent and lessons learned.
Leland Team
RFP Added Value Assignments
X
3.1 Summarize the Capacity Analysis findings in written and
graphic format amd organize materials and activities.
X 3.2
Convene a day-long retreat/workshop with the
Downtown Planning Committee to review the Capacity
Analysis, as well as "fine tune" the vision articulated
within the Vision Downtown document. If necessazy, re-
establish goals and priorities for the Downto~m Dubuque
Master Plan explore and evaluate conceptual
development alternatives including preJiminary
identification of catalyst projects for investment emd craft
a consensus concept.
The workshop will include a presentation of information
collected to-date and serve as a springboard to the market
analysis and implementation phases of the project.
[] Leland Consulting Group, Real fi`state Strategists 4
X
3.3 Summarize workshop results.
Phase II: Concept Refinement
Phase I Work Task 4.0.'
Budget:
Timing:
Objective:
Market Indicators and Trends
$7,500
Weeks 8-10
To understand market opportunities for Downtown
Dubuque and provide the client team with a technical and
analytical base of information from which to direct policy
decisions for future development and redevelopment in the
dov. mtown area.
Leland Team
RFP Added Value Assig~xments
X gal
Define Downtown's primary and secondary trade areas
for all major land uses including retail, residential, and
employment uses.
Based on a study of consumer shopping habits downtown
and within the region, determine what the downtown is
and is not used for and define consumers' likes and
dislikes about downtown and compeffng areas.
X &3
Complete a retail audit/inventory of downtown stores
and services. The audit will provide the framework from
which to identiby: gaps and opportunities by commodity;
appropriate market rdches for downtown retail,
commercial and social/cultural uses; and, retail and
service space levels in relation to what the trade area can
support.
X 4.4
Complete an inventory of residential developments
within the market and trade area. The inventory will
provide the framework from which to identify: gaps and
opportunities by product type; appropriate market niches
for downtown housing; and, product levels in relation to
what the trade area can support.
X 4.5
Conduct a limited target industry screening analysis in
order to identify those industries and business groups
which exhibit the highest potential for relocation and/or
expew~sion in the downtown core using previous a~alyses
as a foundation for this research. Translate these
oppor~x'Jfies into demand for non-retaiI commercial
space.
· t Le[and ConsuJting Group, Real Estafe Strategqsts 5
X
X
Work Task 5.0:
Budget:.
Timing~
Objective:
4.6 Analyze vacant and ~mderulilized land in the downtown
area, ownership patterns, and the potential for assembly
of significant parcels for new development or
redevelopment in catalyst locations.
4.7 Assess the market's ability to accommodate the ideniif~ed
niche opportunities and begin to formulate necessary
incentive actions.
Identification of Niche Opportunities
and Benchmarks
$8,500
Weeks 11-13
Identify and quantify, by type of land uses, the Ievel of
development achievable within the downtown planning area
in the short-, mid-, and long-term and the associated public
in frasl~uct~re improvements.
Leland Team
RFP Added Value Assigx~ments
X 5.1
X 5.2
X 5.3
Use the nrarket findings to refine the development
concept plans, inco~-porating those land use and business
opportunities ideniified which represent the most
promising prospects for investment in the market and
which benefit downtown and the community. Post the
refined concept plans on the City's web page and include it in
the Mainstreet newsletter for review and comment.
To monitor the progress of implementing the plan, a
variety of qualitative and quantitative benchmarking
variables will be identified. The market analysis will
provide baseline measures for quantitative benchinarking.
Qualitative benchmarking variables will relate to the
goals and aspirations of downtown, stakeholders and can
be reflected by periodic s~akeholder s~rveys. Qualitative
benclimarks can relate to.the perception of Downtown's
quality of life, including safety; cleanl~ess; vitality; etc.
Facilitate a Downtown Planning Committee meeting to
review the identified niche opportunities and
benckrnarks.
~lI Leland Co;~ultin Grou , Real Estate Strategists 6
g ~
Work Task 6.0:
Budget:
Timing:
Objective:
Concept Plan Refinement and Design Recommendations
$20,500
Weeks 14-20
Based on the results of work completed in previous tasks,
recommend urban design elements and physical
infrastructure improvements required to implement projects
in Downtown Dubuque.
Leland Team
RFP Added Value Assig?maents
X
X
X
X
X
X
X
6.1 Analyze potential traffic circulation impacts resulting
from the development and redevelopment land use
alternatives. Identify modifications to the existing
roadway end parking infrastructure.
6.2 Analyze potential subsurface utility impacts from the
development and redevelopment ]o_nd use alternatives.
6.3 Based on on-site visits to downtown, review of past
plannJ.ng efforts, and the identified
development/redevelopment opportunities, identify
public open spaces which could expanded end/or
preserved, as well as any connections which should be
encouraged in order to ~urther the plan vision.
6.4 Prepare prelkninary cost estimates for private investment
projects and associated public improvements.
6.5
Prepare recommendations regarding select design
elements which should be incorporated into the
downtown master plan by area or district in order to
create a physical environment which supports and
encourages private investment.
6.6
Working with the development strategists on the team,
identify key public projects which are consistent with the
overall theme for Downtown Dubuque or for the
individual distxicts and which will most effectively
leverage private investment.
6.7 Prepare a draft framework plan graphic depicting the
location and extent of the suggested private and public
improvements.
I~ Leland Consulting Group, Real Eslale Strategistx 7
X
Work Task 7.0:
Budget:.
Timing~
Objective:
X
6.8 Prepare (4-5) "snap-shot" character sketches depicting Lhe
scale, style and overall character of the proposed public
and/or private improvements.
6.9 Provide an update of the planning process and plan
elements to the City Council at a council work session.
Positioning and Investment Strategies
$7,500
Weeks 21-24
Prepare a positioning and invest3nent strategy for Downtown
Dubuque that capitalizes on niche opportunities unique to the
marketplace.
Leland Team
RFP Added Value Assignments
X 7.1
X 7.2
Work Task 8.0:
Budget:.
TimLug:
Objective:
Based upon the findings of the market analysis, incinding
market inc[icators and trends, identification of
development opportunities, market potential and capacity
of the local delivery system, the Leland Team will
develop recommended niche strategies for Downtown
Dubuque. Niche strategies will be delineated by
economic segment (i.e. office, retail, housing, etc). Post the
niche strategies on the City's web page and include them in the
Mainstreet newsletter for review and comment.
Develop priorities for public and private investinent ~o
realize the Downtown's market potential and niche
opportunities. The Lei,and Team will develop priorities
and a sequencing timetable. The project planning
committee will be involved in a priority setting process to
help guide the investment strategy.
Implementation Strategy and Final Plan
$15,500
Weeks 25-28
Prepare a s~rategy and the necessary tools (final plan)
including a summary of potential public and private:
resources designed to attract private and leverage public
investment.
Leland Team
RFP Added Value Assignments
~ll Leland Co~ulting Group, Rea] £~ta~e Srrategis~s 8
X
8.1
To implement the development strategy, a menu of tactics
will be developed. Tactics wilt include a variety of
project, program and regulatory initiatives. Priorities and
sequencing for suggested tactics will be based upon the
priorities established for public and private investment
which will enable downtown to compete more effectively
for new investment.
X
8.2 Identify sources of funds to implement the downtow~
strategy from a variety of public omd private sottrces.
X 8.3
Identify development incentives necessary to attract
investment and create a more favorable environment for
private investment, including: land write-dowus; taxing
policies: rent abatement progranzs; and others.
X 8.4
Outth~e the variety of financing tools and sources that can
be used. including: tax increment financing; special
assessment districts; leases; bond financing; commur~ty
development block grants; urban development action
grants; private investment dollars; and, other programs.
X
8.5 Synthesize the final framework plan depicting land
use/private redevelopment areas, green space, trrban
design, transportation and parking improvements.
X
8.6 Facilitate a Downtown Planning Committee meeting to
review the implementation strategy and discuss the final
public meeth~g/presentation.
Phase [[h Final Presentations and Deliverables
Work Task 9.0.'
Budget:.
Timing:
Objective:
Public Open House and Presentation
$5,500
Weeks 29-32
Provide the City, stakeholders and interested citizens and
opportunities to explore and understand the master plan for
Downtown, Dubuque.
Lelm~d Team
RFP Added Value Assignments
X
9.1 Facilitate I-2 public open houses to display the Downtown
Master Plan to the conununity. Post the plan on the City's
web page and include it in the Mainstreet newsletter for review
r~ Lelaad Consuhing Group, Real £xta[e Sa,'a[egists 9
X
X
X
9.2 Facilitate a Downtown Planning Committee meeting to
review the open houses and discuss refinements and
format for City Council presentations.
9.3 Work with the city and client team to identify potential
investor audiences for receipt of future developer
solicitations for the identified catalyst projects. Prepare
portions of RFP documents which express the vision and
issues for downtown's future.
9.4 Present the Downtown Master Plan to the City Council.
[] Leland Cot~ultmg Groep, Reai £sta[e St~ ateg~sts'
10
PROJECT SCHEDULE
I LeL~nd Convtd~ing Grov~p, RealEstate Strategists
PROJECT BUDGET AND TIMING
PROJECT BUDGET
Task Description
1
2
3
4
5
6
7
8
9
Project Orientation and Initiation
Capacity of the "Delivery System' Analysis
Planning Workshop/Retreat
Market Indicators and Trends
Identification of Niche Opporttmities
Concept Pla~ Refinement/Design Recommendations
· Positioning and Investment Strategies
Implementation Strategy and Final Plan
Public Open House and Presentation
Total Professional Fees:
Estimated Project Expenses (15%):
Total Project Budge~
PROJECT TIMING
Task
1
2
3
4
5
6
7
8
9
Description
Project Orientation and Imtiation
Capacity of the "Delivery System" Analysis
Planning Workshop/Retreat
Market Indicators and Trends
Identffication of Niche Opportunities
Concept Plan Refinement/Design Recommendations
Positioning and Investment Strategies
Implementation Strategy and Final Plan
Public Open House and Presentation
$2,500
$1Z500
$~000
$~500
$8,500
$20,500
$Z500
$15,500
$5~500
$s6~ooo
$12,9oo
$98.900
Weeks 1-3
Weeks 2-5
Weeks 6-7
Weeks 8-10
Weeks 11-13
Weeks 14-20
Weeks 21-24
Weeks 25-28
Weeks 29-32
Total Project Timing:
* Some tasks wilI be completed concurrently.
30 to 32 Week.s.
[] Ldand Consulting Group, Real Estate Strategists
APPENDIX
~i Le~nd Consulting Group, Re~l Esrate S~'~zvegists
LELAND CONSULTING GROUP
RELEVANT PROJECT EXPERIENCE
Downtown/Urban Renewal Experience
Client Project Loc~tion
City of Colorado Springs
City of Colorado Springs
Downtown Lincoln Association
City of Lincoln
City of Lincoln
Denver Urban Renewal Authority
Denver Urban Renewal Autho~4ty
City of Desxver/DURA
City of Denver/DURA
Lakewood Redevei Authority
Lakewood Redevel Authority
City of Westminster
Arvada Urban Renewal Authority
Edgewater Rede~el Authority
City of Midland
City of Pueblo
City of Tualatin
City of Bremer tom
City of Bellingham
City of Eugene
City of Bend
City of Coos Bay
City of Santa Fe
Urbm7 Land Ensfitute (ULI)
Urban Land lnstit~tte (ULI)
City of Ktrkland
City of Belllngham
City of SeaTac
Southwest DoWntown Urban Renewal Plan
Downtown Investment Strategy
Downtown Investment Strategy
Old Federal BvSlding I:'re-D~eiopment Study
Urbmx Entertain Market/Economic Analysis
Northeast Park Hill Redevelopment Analysis
St. Luke's Economic Benefit Study
L$ght Rail Sta~4on Development Anaiysis
Convention Center Hotel Feasibility Study
Colfax/Wadswor~ Revitalization Survey
Villa Itelia Blight Study
Westminster City Center Redevel Study
Mazket Analysis and Revenue Forecasts
Mmeket A~vlysis and Revenue Forecasts
Dwntwn Business Plan astd Economic Profile
Dwntwn Housing Market Strategy
Downtown Bi.mess Developmemt Plan
Downtown Riverfront Investment Strategy
16t~ Street Mai1 Economic Benefit Study
Creekiront Neighborhood Plan
Downtown Plan
Downtown Redevelopment Strategy
Wateffront/CBD Revitalization S~ategy
Downtown lnvestmeiat Strategy
Downtov. m Investment Strategy
Dovmtown Investment S~rategy
Downtown Investment Strategy
Rallyard Redevelopment F~ Analysis
Downtown Revitalization Report
Downtown Revitalization Report
Downtown Development Strategy
Colorado Springs, CO
Colorado Springs, CO
Lincoln, NE
Lincoln. NE
ld-ncoln, NE
Denver. CO
Denver. CO
Denver, CO
Denvar, CO
Lakewood, CO
Lakewood, CO
Westminster, CO
A~vada. CO
Edgewat~r. CO
Des Molnes. IA
Corpus Christi, 7X
Midland. TX
Pueblo. CO
Denver, CO
Denver. CO
Beaver ton, OR
Tualatin, OR
Bremerton, WA
Bellingham, WA
Eugene, OR
Bend, OR
Coos Bay, OR
Santm Fe, NM
Bell~gham, WA
Portland, OR
Portland, OR
LELAND CONSULTING GROUP
DOWN~O~ AND COMMUNiTY-WIDE RELNVES~ENT PROJECTS - SAMPLE
SOUTHWEST DOWNTOWN URBAN RENEWAL PLAN
Colorado Springs, Colorado
Leland ConsulHng Group is cwrentty engaged by the City of Colorado Springs to assist
in preparing oa~ urban renewal plan for the Southwest Downtown redevelopment a~ea.
As a follow-up to the Downtown Development Strategy, LCG is providing the following
services: community and stakeholder interviews; analysis of Southwest Downtown area
characteristics which will affect development and redevelopment potential; evaluation of
the region's economic and demographic trends; identification of residential, office, retail,
and industrial development oppor~axities; a bl~ght study documenHng qualifying
conditions for ~rrban renewal; formulation of strategies designed to attract private sector
investment to the Southwest Downtown area; evaluation of appropriate vehicles for
implementation of the development strategies; and, a summary of potential public and
prix~ate resources to f-urther these efforts.
1VI~RKET ANALYSIS AND DEVELOPMENT PROGRAM FOR DOWNTOWN R1VEKFP, ONT PROJECT
Pueblo, Colorado
Lel~md Consulting Group recenHy completed a market study and development program
for the proposed Historic Arkansas River Project (HARP) in downtov~ Pueblo,
Colorado. Se~ices provided include: o~nalysis of site characteristics which affect
development potenHal; evaluation of Pueblo and Southern Colorado economic and
demographic trends; esHmates of Hm~g and development of residential and commercial
uses; projections of pricing by development type; and, formulation of strategies designed
to attract private sector investment to the project.
ARVADA URBAN RENEWAL AUTHOP, iTY
Market Study and Review of Financial Forecast
P~incipals of Leland Consulting Group assisted the Arvada Urban Renewal Authority in
conducting a market study for retail, hotel and office development as pa~t of a tax
increment financing bond issue. Services provided include a review of the Authority's
forecast of sales and property tax revenues attributable to the project to determine
support for debt service on the bonds. The report was included in a prospects in order
to market the bonds.
EDGEWATER REDEVELOPMENT AU~-IOR1TY
Market Study and Review of a Financial Forecast
Principals of Leland Consulting Group assisted the Edgewater Redevelopment Authority
with a market study and review of a financial forecast. The market a~alysis was
conducted for a large mixed-use project, which included sales tax generating retail
development and adjacent residential uses. Appropriate absorption rates for the
proposed retail and residential uses were developed and the Authority's financial
forecast relative to property and sales tax revenues generated fi:om the project were
reviewed. The report was included in a prospectus in order to market the bonds.
[] Ld~nd Co~.vu/ting Group, RealEstaae S~rateglsu PACE
CENTRAL ISLAi IL VALLEY -- CREEKFRONT NEIGtiBORI-IOOD ~
Denver, Colorado
Leland Consulting Group recently assisted the Downtown Denver Parhaership in
analyzing housing opportunities within the Creekfront Neighborhood in Lower
Downtown and the Central Platte Valley. The Creekfront Neighborhood extends from
Latimer Square into the Cantral Platte Valley to Confluence Park. Services included an
atmiysis of downtown housing supply and demand; the preparation of development
programs for two pilot sites within the Neighborhood, including multi-family
condominiums and apartments, rowhouses, live/work loft units and supporiing
conm~ercial uses; and an economic pro forma analysis of each development program,
considerirtg development and construction costs, housing product sale prices and rental
rates, commercial lease rates and private investor return expectations.
DOWNTOWN DEVELOPMENT STRATEGY
Colorado Springs, Colorado
Leland Consulting Group was engaged by the City of Colorado Springs to assist in
preparing an economic vision and strategic plan for Downtown. Together with
Progressive Urban Management Associates (PUMA), LCG provided the following
services: comanunity and stakeholder interviews; analysis of plarming area
characteristics which will affect development and redevelopment potential; evaluation of
the region's economic and demographic trends; identification of residential office, retail,
and industrial development oppor~tmities; formulation of strategies designed to attract
private sector investment to the downtown area; evaluation of appropriate vehicles for
implementation of the development strategies; and, a summary of potential public and
private resources to further these efforts.
COIF/EX ON T~IE HILL COM3/IERCIAL DISTRICT
Denver, Colorado
Principals of Leland Consulting Group completed a commercial revitalization study for
the Colfax On The ~II Business Association to assist them hi attracting new
businesses/retailers to their shopping district. The analysis focused on determining the
primary trade area from which most shoppers were drawn, the level of retail demand
existing in the trade area, the amount of "leakage" being stff-fered by thg area, specific
types of retail outlets to be pursued, and potential implementation strategies aimed at
expanding the area's drawing power.
CITY OF DENVER/GREATER PARK HILL BUSINESS ASSOCIATION
Denver, Colorado
Principals of Leland Consulting Group completed a retail market study and
revitalization strategy for four shopping areas in the Park Hill Community of Denver,
Colorado. Services included conducting a detailed inventory of retail and other
commercial uses by shopping area; analyzing the socioeconomic characteristics of the
various subareas within the Park Hill community; conducting extensive interviews with
merchants, property owners and residents of the trade area; determining the retail
potentSal of each shopping area; making recom~nendations for stremg-thening their
respective competitive positions; and preparing a plan for implementing recommended
improvemenl~. Throughout the course of the study, the analysts worked closely with a
[] £ehznd Consulting Group, RealEstate Strate~ts P^Glii2
task force consisting of City a~d Greater Park I-till Business Association representatives
to ensure that the recomanended strategies adequately addressed the needs of residents,
merchants and the City.
16T~I STREET MALL MANAGEMENT ECONOMIC BENEFIT STUDY
Denver, Colorado
Principals of Leland Consulting Group completed this economic benefit study for
Downtown Denver, Inc., addressing formation of a Business Improvement Dish-ict (BID)
for the 16th Street Mall in Downtown Denver. The study included an analysis of historic
economic real estate indicators in Downtown Denver, interviews with Downtown
property owners, and an evaluation of the District's tax assessment methodology.
DOWNTOWN ECONOMIC VISION AND STRATEGIC PLAN
Lincoln, Nebraska
Leland Consulting Group was engaged by the Downtown Lincoln Association to assist in
preparing an economic vision and strategic plan for Downtown Lincoln. Together with
lVrogTessive Urban Management Associates (PDMA), LCG provided the following
services: community and stakeholder interviews; analysis of planning area
characteristics which will affect development and redevelopment potential; evaluation of
the region's economic and demographic trends; identification of residential, office, retail,
and industrial development opportrrnities; formulation of strategies designed to attract
private sector inveshnent to the downtown area; evaluation of appropriate vehicles for
implementation of the development strategies; and, a summary of poten~al public and
private resources to further these efforts.
HISTORIC LANDMARK PRE-DEVELOPMENT STRATEGY
Lincoln, Nebraska
Lelmad Consulting Group was recently engaged by the City of Lincoln to assist in
preparing a pre-development strategy for an historic landmark in Downtown Lincoln.
The subject property, referred to as the Old Federal Building, was acqu~ed by the City
during the early 1980s. Since that time the building has housed several City, County and
State govervanent offices. As a high-profile landmark in the downtown area, and given
heightened L'~terest by private invesl2nent entities in recent years, the City initiated a
study to analyze the redevelopment potential of the Old Federal Building in downtown
Lincoln. Services which LCG provided included: a market analysis of demand for
various land uses in the downtown area; analysis of the economics of redeveloping the
property, including the need for public-private financial conlxibutions; and, a
redevelopment stxategy which responded to market conditions, addressed
redevelopment economics, and positioned the property for solicitation to prospective
investors and developers.
BLOCK 41 PRE-DEVELOPMENT STRATEGY
Lincoln, Nebraska
Leland Consulting Group recently assisted the City of Lincoln and Downtown Lincoln
Parh~ership in preparing various market and feasibility analyses associated with
development of an entertainment complex on Block 41 in Downtown Lincoln, Nebraska.
The project, as proposed, included commercial service, restaurant and/or entertainment
uses which would capitalize on prevailing market conditions. Growth in both the local
m £eland Co~vdting Group, Real£stave S~raregists PAGE3
and regional markets, as well as the project area's strategic position within the heart of
the C/ty~s employment center and proximate to the University of Nebraska, ampIff-ied the
importance of a thorough analysis to determine the most appropriate land use mix.
Services which LCG provided included: quantLfySng the market potential of sex~eral uses
on a community-wide basis; identifying the opt/mum development program for
marketing the area to various tenant axxd user audiences; testing the economic feasibility
of the proposed project as programmed; and, determining the economic impacts
resulting from development of the Block 41 redevelopment project.
DOWNTOWN BUSINESS PLAN AND ECONOMIC PROFILE
Des Moines, Iowa
Leland Consulting Group Was engaged by the Downtown Des MoLnes Partnership to
assist hr preparing a business plan and economic profile for their downtown. Together
with Progressive Urban Management Associates (PU~iA), LCG provided the following
services: community and stakeholder interviews; analysis of planning area
characteristics which will affect development and redevelopment potential; evaluation of
the City's and region's economic and demographic trends; identification of residential,
office, retail and hotel development opportunities; and, formulation of strategies
designed to attract private sector investment to the downtown area.
WATERFRONT/CENTRAL BUSINESS DISTRICT REVITALIZATION IMPLEMENTATION STUDY
Bremerton, WA
Lehnd ConsullSmg Group recently completed a strategic downtown revitalization plan
for the Bremerton downtown and waterfront. The stady resulted in a revitalization
concept with implementation strategies which are now being pursued by the City of
Bremerton, the Bremerton Chamber of Commerce, the Kitsap Visitors and Convention
Bureau, the Waterfront Development Partners, and with the help of the Leland
Consulting Group in a development advisory capacity. The first of the revitalization
projects is the waterfront marketplace and is in master planning. Funding for the project
is being undertaken by the Port of Bremerten and the City of Bremerton. Construction of
a new ferry facilities and the waterfront plaza are expected to be underway in t994.
MARTtN LUTHER KING, JR. BOULEVARD REDEVELOPMENT STRATEGY
Portland, Oregon
Letand Consulting Group provided market research, development programming and
financial analysis for 12 development and redevelopment projects along Martin Luther
King, Ir. Boulevard. The projects include a combination of owner and rental housing,
retail-commercial space, office buildings, industrial buildings and expansion of existing
manufacturing plants.
NORTH OF BURNSIDE PROJECT
Portland, Oregon
Leland Consulting Group was retained by the City of Portland to assist in preparing
short and long-term market assessments, development programming and
implementation strategies for a 30-block area adjacent to Downtown Portland. The
project objective was to identify a number of development opporhmity sites that would
strengthen the Downtown. Identified projects included Union Station renovation,
extension of the Downtown Transit Mall, enhancement of Chinatewn, a new public
[] Leland Co~z~ulting Group, RealEstate Strateodsts PAGE 4
signing system, eventual relocation of social agencies serving the homeless and indigents
and expansion of the Northwest Natural Gas Company headquarters. Most of the
identified projects have subsequently occurred and the balance are now in detailed
planning for implementation.
CITY OF TUALAT1N DOWNTOWN REDEVELOPMENT
Tualatln, Oregon
Leland Consulting Group was retained by the City of Tualatin to plan and execute a
market analysis and work plan for its downtown redevelopment. The redevelopment
area, Tualatin Commons, was the core of the city's original downtown and had seen
successive efforts at project implementation over the prior ten years, none of which
resulted in approval With the help of Leland Consulting Group and building on past
efforts, the public process was started again and a new desigaa and work plan were
approved by the City for implementation.
The new Tualatin Commons is a $20 million mixed-use development clustered around a
3-acre lake incorporating public pedeslxian walks and an exciting array of indoor and
outdoor experiences for use both during the day and at night. ~ilae City of Tualatin is
funding the development of site infrastructure and will recoup a major portion of this
cost througli land sales. Leland Consulting Group is now acting as project manager to
implement design and marketing of the new Tualafin Conunons. The project broke
ground during the Sununer of 1993.
CITY OF FORT WORTH, TEXAS
Fort Worth, Texas
Lelm~d Consulting Group, together with I-INTB, is currently engaged by the City of Port
Worth, Texas to assist in evaluating existing conditions along five urban conmaercial
corridors flcom both an investrnent and urban design perspective. In an effort to
accomplish stakeholder and community objectives, LCG is providing the following
services: conununity and stakeholder workshops; analysis of investment area
chaxacterisfics which will affect development and redevelopment potential; evaluation of
the region's economic and demographic trends; identification of residential, office, retail,
entertainment, and civic development opportunities; formulation of strategies designed
to a~ract private sector investment to the downtown azea; evaluation of appropriate
vehicles £or implementation of the development strategies; and, a summary of potential
public and private resources to further these efforts.
DOWNTOWN HOUSING MARKET STRATEGY
Corpus Christi, Texas
Leland Consulting Group was engaged by the Corpus Christi Downtown Management
District to assist in preparing a downtown housing market strategy. LCG provided the
following services; analysis of planning area characteristics which wi~ affect
development and redevelopment potential; interviews with downtown property owners,
developers, employers, lenders and public officials; evaluation of the City's and region's
economic and demographic trends; identification of housing development opportunities;
and, formulation of strategies designed to attract housing to the downtown area.
m Leland Consulting Group, RealEstate Strate~is= PAOE5
DOWNTOWN MIXED-USE REDEVELOPMENT PROJECT
E1 Paso, Texas
Principals of LeLand Consulting Group conducted a market and economic zmalysis of a
proposed mixed-use redevelopment project in downtown El Paso. The proposed project
was to include retail, enterta/Joment and cultural arts uses. Services provided included:
an analysis of the physical constraints/barriers affecting the site; an evaluation of E1 Paso
market area economic and demographic characteristics; deterutination of the trade area
for the proposed project; estimates of market demand for the proposed uses from various
user groups, including E1 Paso residents, tourists, and Juarez residents; and an evaluation
of incentives and potential funding sources for the proposed developmenL
DOWNrTOWN AND BUSINESS DEVELOPME1WF PLAN
Midland, Texas
Leland Consulting Group was engaged by the City of Midland, Texas to prepare a
revitalization plan for their downtown. Together with Flellmuth, Obata & Kassabaum,
Inc. (HOK), LCG is providing the following services: community and stakeholder
interviews (90 - 100); analysis of planning area characteristics which w/ii affect
development and redevelopment potential; evaluation of the City's and region's
economic and demographic trends; identification of business opportunities and financing
mechanisms; business development strategy; and, formulation of strategies designed to
attract private sector investment to the downtown area.
[] Le~id Consultiv~g Group, RealEsrate Strate~ts PAGE6