Hotel Conf. Ctr. Pkg Lots & 5thMEMORANDUM August27,2002 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Hotel/Conference Center Parking Lots & Fifth Street Construction Sealed bids were received for the Hotel/Conference Center Parking Lots & Fifth Street Construction Project. Public Works Director Mike Koch recommends award ofthe contract to the Iow bidder, Portzen Construction, Inc., in the amount of $1,097,207.48, which is 30.76% under the engineer's estimate. It is also recommended that the parking lot be constructed of Portland Cement Concrete. I concur with the recommendation and respectfully request Mayor and City Council approval. ____________________ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM August 26, 2002 TO: Michael C. Van Milligen, City Manager FROM: Michael A. Koch, Public Works Director SUBJECT: Hotel/Conference Center Parking Lots & Fifth Street Construction INTRODUCTION The enclosed resolution provides for the award of the Hotel/Conference Center Parking Lots & Fifth Street Construction Project. DISCUSSION The project will consist of the construction of two parking lots in front of the hotel along Bell Street---one for the Hotel and the second lot for the shared Hotel/Conference Center. The other portion of the project will be the construction of Fifth Street from Bell Street to the easterly end, which was recently deleted from the Bell Street Construction Project. The project will include the installation of a 37-foot wide concrete roadway on Fifth Street; historic lighting for the street; parking lot lighting; landscaping along Fifth Street; an irrigation system; and an entrance into the hotel from Bell Street. The Hotel parking lot will include 215 parking stalls, and the Hotel/Conference Center lot will have 132 stalls. The parking lots were bid as PCC concrete, with an altemate bid of asphalt. Included in the parking lot construction will be the removal of benzene-contaminated soil from a previous use of the property, in an estimated amount of $60,000. Sealed bids were received on the project on August 22, 2002. Portzen Construction Inc. of Dubuque, Iowa, submitted the Iow bid in the amount of $1,097,207.48. This amount is 30.76% under the engineer's estimate. The parking lot portion of the project was bid with an alternate of asphalt. Portzen's bid included a cost-savings of $86,293.30 for asphalt. A summary of the bids received is as follows: Base Alternate Portzen Construction Inc. $1,097,207.48 $1,010,207.48 Tschiggfrie Excavating Co. $1,110,640.01 $1,046,660.45 RECOMMENDATION I recommend that the contract be awarded to Portzen Construction Inc. in the amount of $1,097,207.48, and that the parking lot be constructed of Portland cement concrete. BUDGET IMPACT The summary of the project costs is as follows: Bid Award Construction Contract $1,584,700.65 $1,097,207.48 Contingency 158,470.06 109,720.75 Engineering 261,475.61 164,581.12 Total Project Cost $2,004,646.32 $1,371,509.35 Fifth Street $ 949,648.12 $ 649,716.24 Parking Lots 1,054,998.20 721,793.11 $2,004,646.32 $1,371,509.35 The Bell Street and Fifth Street improvement projects will be funded from the Fiscal Year 2003 General Obligation Bonds ($377,500) and the balance from Road Use Tax Funds. The parking lot improvements will be funded from the Fiscal Year 2003 General Obligation Bonds in the amount of $947,000. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution awarding the construction contract to Portzen Construction, Inc. MAK/vjd Prepared by Michael Felderman, Civil Engineer cc: Pauline Joyce, Administrative Services Manager Jim Kolf, Durrant RESOLUTION NO. AWARDING CONTRACT Whereas, sealed proposals have been submitted by contractors for the Hotel/Conference Center Parking Lots & Fifth Street Construction Project pursuant to Resolution No._______and notice to bidders published in a newspaper published in the City of Dubuque, Iowa on the 12th day of July, 2002. Whereas, said sealed proposals were opened and read on the 22nd day of August, 2002, and it has been determined that the bid of Portzen Construction, Inc. of Dubuque, Iowa, in the amount of $1,097,207.48 was the lowest bid for the furnishings of all labor and materials and performing the work as provided for in the plans and specifications. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the contract for the above improvement be awarded to Portzen Construction, Inc. and the Manager be and is hereby directed to execute a contract on behalf of the City of Dubuque for the complete performance of the work. BE IT FURTHER RESOLVED: That upon the signing of said contract and the approval of the contractor's bond, the City Treasurer is authorized and instructed to return the bid deposits of the unsuccessful bidders. Passed, approved and adopted this_______day of__________,2002. _______________________ Terrance M. Duggan, Mayor Attest: ________________________________ Jeanne F. Schneider, CMC, City Clerk HOTEL CONFERENCE CENTER PARKING LOTS AND FIFTH STREET CONSTRUCTION BID SCHEDULE NO. DESCRIPTION QUAN1TY 5th Parking Total UNff IOTAL S~t Lot Quantity PRIEE PRICE Porteen Construction, lne. Total Bid = $ $L097,207.48 UNIT COST TOTAL COST Diff Tsohlggfrie Excavating Co. UNIT COST TOTAL COST 1 Clearing and Grubbing LS 2 Unclassified Excavation CY 3950 6238 3 Curb/Gut~r (Type A) LF 5350 4 Concrete Pavement (8" - ~p. Dr. Sec.) SY 2887 2535 5 Concreta Pavement (6" - Typ. parking Sec.) SY 11240 60ranular Material TON 840 4005 7 6" StagingBas¢ TON 3850 8 1/2" Hot Mix Asphalt Surfaco Cour~ (Service Road TON 86 9 3/4" Hot Mix Asphalt Binder Course (Service Road) TON 258 10 Crashed Stone Base (Service Road) TON 687 11 Saw Cutting (Concrete) LF 135 12 Curb/Outter Removal LF 130 13 Driveway, PCC, 7" SY 91 194 14 Sidewalk, PCC, 4" SF 383 881 15 Storm Sewer Manhole Ring/Cover (Adjus0 EA 1 16 Catch Basin 10lB (Complete) EA 3 9 1dA Catch Basin 104 B (Complule) EA 2 17 Catch Basin 10lC (Complete)_ EA 5 18 15" R.C.P- Storm Sewer, 1500 D LF 68 642 1SA 24" R.C.P. Storm Sewer, 1500 D LF 194 18B 42" R.C.P. Stom~ S~wer, 1500D LF 161 19 Stabiilzadon Stone TON 1044 150 20 Imported Fill Sand (Starm Sewer) TON 1942 21 Stdping (Parking Lo0 LS 1 2lA Painted Pavement Mad(lugs STA 4.36 22 Traffic Control LS 0.5 0.5 23 Erosion Control LS 0.5 0.5 24 Disposal of Contaminated Material TON 91 g 25 12" R.C.P. Storm Sewer 1500 D LF 46 26 Construction Staking LS 27 Topsoil Furnish and Spread CY 150 28 Storm Sewer Manhole (Complete) EA 2 29 Historic Street Light EA 14 7 30 Histafie Street Light w/PC Base EA 14 7 31 2" Schedule 40 PVC LF 900 475 32 2" Schedule 80 PVC LF 200 1625 33 2" Schedule 80 PVC W/Tracer Wire LF 0 250 1 $500.00 $500.00 10188 $5.00 $81,504.00 5350 $10.00 $53,800.00 5422 $35.00 $189,770.00 11240 $45.00 $505.800.00 4845 $t2.00 $58,140.48 3850 $t4.72 $56,672.00 86 $47,50 $4,085.00 $2,000.00 $2,O00.O0 $5.50 $56,034.00 $12.00 $64,200.00 $26.60 $144,225.20 $22.60 $254,024.00 $9.65 $46,754.25 $9.80 $36,575.00 $44.90 $3,861.40 $44.90 $11,584.20 $10.00 $6,870.00 $3.00 $405.00 $5.00 $650.00 $36.00 $10,260.00 $8.00 $10,112.00 $300.00 $300.00 $1,250.O0 $15,000.00 $1,850.00 $3,700.00 $1,675.00 $8,375.00 $26.00 $18,460.00 $4LO0 $7,954.00 $88.00 $14,168.00 $10.15 $12,119.10 $7.50 $14,565.00 $1,615.00 $1,615.00 $48.15 $209.93 $2,800,00 $2,800.00 $500.O0 $500.00 $75.00 $68,850.00 $24.00 $1,104.00 $0.00 $0.O0 $12.50 $1,875.00 $3,250.00 $6,500.00 $3,055.O0 $64,155.00 $775.00 $16,275.O0 $2.00 $2,750.00 $2.40 $4,380.~0 $2.40 $600.00 3OO% 20% -24% -50% -20% -35% -5% -4% 0% $1.00 SL00 $4.70 $47,883.60 $10.00 $53,5O0~00 $29.35 $159,135.70 $20.50 $230,420.00 $9,65 $46,754.25 $9.65 $37,152.50 $42.75 $3,676.50 $42.75 $11,029.50 $9.70 $6,663.90 $2.35 $317.25 $3.15 $409.50 $32.90 $9,376.50 $3.15 $3,981.60 $250.40 $250A0 $1,620.15 $19,441.80 $2,711.20 $5,422.40 $2,272.85 $11,364.25 $27.20 $19,312.00 $36.35 $7,051.90 $69.90 $11,253.90 $9.65 $11,522.10 $7.50 $14,565.00 $1,542.00 $1,542.00 $45.85 $199.91 $2,800.00 $2,8O0.00 $4,965.75 $4,965.15 $75.55 $69,354.90 $24.50 $1,127.00 $0.O0 $0.00 $12.55 $1,882.50 $2,292.20 $4,584.40 $3,091.05 $64,912.05 $800.00 $16,800.00 $2.05 $2,818.75 $2.40 $4,380.00 $2.40 $600.00 UNIT COST TOTAL COST $2.60 HOTEL CONFERENCE CENTER PARKING LOTS AND FIFTH STREET CONSTRUCTION Total Bid = $ $1,097,207.48 BID SCHEDULE QUANITY Diff 5th Parking Total UNIT TOTAL NO. DESCRIPTION Street Lot Quantity PRICE PRICE UNITCOST TOTALCOST 34 Trenching, 2" LF 1100 2350 3450 2 8800 $3.00 $10,350.00 50% 35 3" Schedule 80PVC LF 60 75 135 8.8 918 $3.20 $432.00 -53% 36 3" Schedule 50 PVC W / Tracer Wire LF 0 140 140 3 420 $3.60 $504.00 20°/0 37 Trenching, 3" LF 60 215 275 3 825 $3.00 $525.00 0% 38 Electrical Cable #10 x HI-P,V Ground LF 1150 2150 3300 0.5 1850 $0.45 $1,485.00 -10% 39 Electrical Cable #10 X HHW LF 2950 1650 4600 2.78 12850 $0.45 $2,070.00 -84% 40 Electrical Cable #8 X HHW LF 1650 3125 4775 0.75 3581.25 $0.70 $3,342.50 -7% 41 Elcoalcal Cable #6 X HHW LF 2800 0 2800 3.5 8800 $1.05 $2,940.00 -70% 42 Quazito Handhole Box and Cover Installed EA I 14 15 200 3000 $285.00 $4,275.00 43% 44 parking LOt Light Pole EA 0 14 14 000 8400 $890.00 $12,460.00 48% 45 Parklng Lot Light PCC Base Complete EA 0 14 14 500 7000 $775.00 $10,850.00 55% 47 lrligation System LS 1 I 2 20000 40000 $19,312.00 $38,624.00 -3% 49 Shrub, Famish t Install (WRIt Warranty) EA 211 0 211 45 9485 $36.75 $7,754.25 - 18% ALTERNATE BID ITEMS (SUBSTITUTES FOR BASE BID NO.'S) A4 1/2,, Hot Mix Asphalt Stufaee Cottrs¢ TON 141 141 47 8527 $32.20 $4,540.20 -31% 3/4- Hot Mix Asphalt Binder tours© TON 423 423 47 10851 $32.30 $13,662.90 -31% A-5 1/2,, Hot Mix Asphalt Surface Course TON 680 680 47 31080 $32.30 $21,964.00 -31% 3/4" Hot Mix Asphalt Binder Course TON 1700 1700 47 79900 $32.30 $54,910.00 -31% A-20 Hauling and Plaelng Stockpiled Fill Sand TON 1942 1942 5 8710 $7.00 $13,594,00 40% $1,584,700.23 $1,304,855.23 $1,097,207.48 $3.25 $438.75 $3.65 $511.00 $2.60 $715.00 $0.45 $1,485.00 $0.45 $2,070.00 $0.65 $3,103.75 $1.05 $2,940.00 $434.00 $6,510.00 $1,000.60 $26,015.60 $900.90 $12,612.60 $869.00 $12,166.00 $6,845.00 $13,696.00 $18,392.50 $36,785.00 $3.50 $3,783.50 $35.00 $7,385.00 $55,000.00 $85,000.00 $30.76 $4,337,16 $30.76 $13,011.48 $30.76 $20,916.80 $30,76 $52,292.00 $8.70 $56,463.00 $10.00 $19,420.00 $1,110,640.01 $1,046,660.45 MEMORANDUM July 9, 2002 TO:The Honorable Mayor and City Council Members FROM:Michael C. Van Milligen, City Manager SUBJECT:Hotel/Conference Center Parking Lots and Fifth Street Construction The Hotel/Conference Center Parking Lots and the Fifth Street Construction Project will consist of the construction of two parking lots in front of the hotel along Bell Street--one for the Hotel and the second lot for the shared Hotel/Conference Center. The other portion of the project will be the construction of Fifth Street from Bell Street to the easterly end, which was recently deleted from the Bell Street Construction Project. The project will include the installation of a 37-foot wide concrete roadway on Fifth Street; historic lighting for the street; parking lot lighting; landscaping along Fifth Street; an irrigation system; and an entrance into the hotel from Bell Street. The Hotel parking lot will include 215 parking stalls, and the Hotel/Conference Center lot will have 132 stalls. The project parking lots will be bid as PCC concrete, with an alternate bid of asphalt. Public Works Director Mike Koch recommends initiation of the bidding process for the Hotel/Conference Center Parking Lots and the Fifth Street Construction Project, and further recommends that a public hearing be set for September 3, 2002. I concur with the recommendation and respectfully request Mayor and City Council approval. _____________________ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM July 8, 2002 TO:Michael C. Van Milligen, City Manager FROM:Michael A. Koch, Public Works Director SUBJECT: HoteVConference Center Parking Lots & Fifth Street Construction INTRODUCTION The enclosed resolutions authorize the bidding procedure for the Hotel/Conference Center Parking Lots & the Fifth Street Construction Project. DISCUSSION The project will consist of the construction of two parking lots in front of the hotel along Bell Street-one for the Hotel and the second lot for the shared Hotel/Conference Center. The other portion of the project will be the construction of Fifth Street from Bell Street to the easterly end, which was recently deleted from the Bell Street Construction Project. The project will include the installation of a 37-foot wide concrete roadway on Fifth Street; historic lighting for the street; parking lot lighting; landscaping along Fifth Street; an irrigation system; and an entrance into the hotel from Bell Street. The Hotel parking lot will include 215 parking stalls, and the Hotel/Conference Center lot will have 132 stalls. The project parking lots will be bid as PCC concrete, with an alternate bid of asphalt. Included in the parking lot construction will be the removal of a benzene- contaminated soil from a previous use of the property, in an estimated amount of $60,000. The schedule for the project is as follows: Advertisement for Bids August 2, 2002 Notice of Public Hearing August 16, 2002 Receipt of Bids August 22, 2002 Public Hearing September 3, 2002 Award of Contract September 3, 2002 Completion - Phase I (5th Street) October 15, 2002 Phase II (Parking Lots) October 30, 2002 RECOMMENDATION I recommend that the City Council establish the date of the public hearing and to authorize the City Clerk to advertise-for proposals. BUDGET IMPACT The estimate for the project is: Construction Contract $1,584,700.65 Contingency 158,470.06 Engineering 261,475.61 Total Project Cost $2,004,646.32 Fifth Street $ 949,648.12 Parking Lots 1,054,998.20 $2,004,646.32 The Bell Street and Fifth Street improvement projects will be funded from the Fiscal Year 2003 General Obligation Bonds and the Sales Tax Fund in the amount of $3,007,500. The parking lot improvements will be funded from the Fiscal Year 2003 General Obligation Bonds in the amount of $947,000. ACTION REQUESTED The City Council is requested to establish the date of the public hearing and to authorize the City Clerk to advertise for proposals through the adoption of the enclosed resolutions. MAK/vjd Prepared by Michael Felderman, Civil Engineer cc: Jim Kolf, Durrant Michael Felderman, Civil Engineer East 5th Street RESOLUTION NO. PRELIMINARY APPROVAL OF PLANS AND SPECIFICATIONS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Hotel/Conference Center Parking Lots & Fifth Street Construction Project in the estimated amount of $2,004,646.32 are hereby approved and ordered filed in the office of the City Clerk for public inspection. Passed, adopted and approved this __ day of __________ 2002. _______________________ Terrance M. Duggan, Mayor Attest: _____________________________ Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. FIXING DATE OF HEARING ON PLANS AND SPECIFICATIONS Whereas, the City Council of the City of Dubuque, Iowa has given its preliminary approval on the proposed plans, specifications, and form of contract and placed same on file in the office of the City Clerk for public inspection of the Hotel/Conference Center Parking Lots & Fifth Street Construction Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a public hearing will be held on the 3rd day of September, 2002, at 6:30 p.m. in the Public Library Auditorium at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and cost of said improvement, and the City Clerk be and is hereby directed to cause a notice of time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be not less than four days nor more than twenty days prior to the day fixed for its consideration. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, contract, or estimated cost of the improvement. Passed, adopted and approved this________day of__________,2002. ______________________ Terrance M. Duggan, Mayor Attest: ________________________________ Jeanne, F. Schneider, CMC, City Clerk NOTICE OF HEARING ON PLANS AND SPECIFICATIONS Notice of public hearing on proposed plans and specifications, proposed form of contract and estimate of cost for the Hotel/Conference Center Parking Lots & Fifth Street Construction Project: two parking lots in front of the hotel along Betl Street; and the construction of Fifth Street from Bell Street to the easterly end. NOTICE IS HEREBY GIVEN: The City Council of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimate of cost for the Hotel/Conference Center Parking Lots & Fifth Street Construction Project, in accordance with the provisions of Chapter 384, City Code of Iowa, at 6:30 p.m., on the 3rd day of September, 2002, in the Public Library Auditorium, 360 West 11th Street, in Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimate of cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto or to the cost of the improvements. Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the__________day of _____________,2002. ________________________________ Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 450-02 RESOLUTION ADOPTING PLANS AND SPECIFICATIONS Whereas, on the 10th day of July, 2002, plans, specifications, form of contract and estimated cost were filed with the City Clerk of Dubuque, Iowa for the Hotel/Conference Center Parking Lots & Fifth Street Construction Project. Whereas, notice of hearing on plans, specifications, form of contract, and estimated cost was published as required by law. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the said plans, specifications, form of contract and estimated cost are hereby approved as the plans, specifications, form of contract and estimated cost for said improvements for said project. Passed, adopted and approved this 3rd day of September ,2002. _______________________ Terrance M. Duggan, Mayor Attest: _______________________________ Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 451-02 AWARDING CONTRACT Whereas, sealed proposals have been submitted by contractors for the Hotel/Conference Center Parking Lots & Fifth Street Construction Project pursuant to Resolution NO. 378-02 and notice to bidders published in a newspaper published in the Cit~; ~'~ ~'~buque, Iowa on the 12th day of July, 2002. Whereas, said sealed proposals were opened and read on the 22"d day of August, 2002, and it has been determined that the bid of Portzen Construction, Inc. of Dubuque, Iowa, in the amount of $1,097,207.48 was the lowest bid for the furnishings of all labor and materials and performing the work as provided for in the plans and specifications. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the contract for the above improvement be awarded to Portzen Construction, Inc. and the Manager be and is hereby directed to execute a contract on behalf of the City of Dubuque for the complete performance of the work. ~ BE IT FURTHER RESOLVED: That upon the signing of said contract and the approval of the contractor's bond, the City Treasurer is authorized and instructed to return the bid deposits of the unsuccessful bidders. Passed, approved and adopted this 3rd Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk day of September ,2002. "Terrance M. Dugga~.~ayor