Ice Harbor West Road & TrailMEMORANDUM September 12, 2002 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Ice Harbor West Road and Trail Sealed bids were received for the Ice Harbor West Road and Trail Project. Public Works Director Mike Koch recommends award of the contract to the Iow bidder, Tschiggfrie Excavating Company, in the amount of $2,171,905.67, which is 38.1% over the engineer's estimate. City staff, Durrant, and llW, the designers for the project, will be meeting with representatives from Tschiggfrie Excavating Co. to look for ways to save money on the project through possible redesigns or value engineering. The outcome of those meetings is, however, totally unknown at this time as to whether any significant savings can be identified. If the City and the cOntractor cannot find any savings in the design as proposed, the $599,297 shortfall will be covered utilizing part of the $904,631 savings from the Mississippi River National Education and Conference Center bids. I concur with the recommendation and respectfully request Mayor and City Council Michael C. Van Milligen ~ approval. MCVM/jh Attachment CC: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM September 11, 2002 TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director Ice Harbor West Road and Trail INTRODUCTION The enclosed resolution provides for the award of the construction contract for the Ice Harbor West Road & Trail Project. DISCUSSION The roadway will be partially located on City property and partially on property owned by the City and leased to the Chicago Central & Pacific Railroad Company. As part of the roadway construction, a 42-inch high decorative barder railing will be installed adjacent to the sidewalk on top of the sheet pile wall at the edge of the Ice Harbor, which will complement the decorative railing installed on the Riverwalk. The barrier railing will also function as a vehicular protective guardrail since the harbor side walkway will be 15 feet higher than the water elevation at normal pool elevation. The barder railing will be strengthened by the installation of decorative cast stone pedestals spaced at approximately 44 feet. Intermediate steel posts will be placed at appropriate 5-foot intervals between, the cast stone pedestals as additional reinforcing for the vehicular guardrail. The cast stone pedestals will have decorative ornamental lights placed on top that will match the lighting theme of the Riverwalk. On the railroad side of the roadway, a 42-inch high safety railing will be installed at approximately 10 feet from the centerline of the railroad tracks that will match the decorative railing installed on the Riverwalk. This safety fence is intended to prevent pedestrians from gaining access to the rail lines. The railroad safety barrier will compliment the harbor side railing, but will not have the level of amhitectural features such as cast stone bollards or lighting. While the roadway will be 24 feet wide to accommodate two-way traffic, it is planned that this traffic be limited to vehicles of less than five (5) tons, and thus no semi or heavy truck traffic. The pavement surface will be traditional concrete paving, and the sidewalk is proposed to be identical to the Riverwalk sidewalk in texture and color. At the southerly end of the sidewalk, there will be a widened area where benches, planters, and trash receptacles will be located. The roadway will tie into the existing pavement on First Street and the existing cul-de-sac will be removed. The project completion date has been specified for May 23, 2003. BID RESULTS Sealed bids were received on the project on September 10, 2002. Tschiggfrie Excavating Company of Dubuque, Iowa submitted the Iow bid in the amount of $2,171,905.67. This amount is 38.1% over the engineer's estimate. A summary of the bids received is as follows: Roadway & Storm Sewer Watermain Extension Electrical Aesthetics & Landscaping Miscellaneous Tschiggfrie J.F. Brennan Co. Excavating Co. Taylor ConstruCtion $ 767,324.64 $ 820,860.03 $ 1,275,848.60 $ 110,490.15 $ 88,608.80 $ 110,529.00 $ 130,173.88 $ 122,188.89 $ 130,226.40 $ 179,152.10 $ 174,308.55 $ 202,311.75 $ 5,509.25 $ 5,019.00 $ 7,928.00 Total BaseBid: $ 1,192,650.02 $ 1,210,985.27 $ 1,726,843.75 Alternate No. 1 - PS27.5 Sheet Pile $ Alternate No.2 - Limestone Planter $ Alternate No.3 - Storm Sewer, Wetland $ 908,178.75 $ 1,061,673.75 $ 972,135.00 9,000.00 $ 9,648.00 $ 5,000.00 62,076.90 $ 42,204.40 $ 62,152.00 Total BidwithAItemates: $ 2,171,905.67 $ 2,324,511.42 $ 2,766,130.75 RECOMMENDATION I recommend that the contract be awarded to Tschiggfrie Excavating Company in the amount of $2,171,905.67. BUDGET IMPACT The summary of the project costs is as follows: Bid Award Construction Contract Contingency Engineering Design Engineering Estimate Railroad Flagger $1,572,609.35 157,261.00 48,000.00 55,000.00 15,000.00 $2,171,905.67 157,261.00 48,000.00 55,000.00 15,000.00 Total Project Cost $1,847,870.35 $2,447,166.67 The project will be funded as follows: Project Capital Appropriation Water Construction Funds Additional Road Use Tax Funds Received Over State Estimate Elimination of Sound System for Port of Dubuque Road Use Tax Savings FY02 Snow Removal Budget Contingency Needed $1,139,137.00 89,880.00 66,000.00 195,185.00 308,670.00 48,998.00 $1,139,137.00 89,880.00 66,000.00 195,185.00 308,670.00 48,998.00 Total Funding Available $1,847,870.00 $1,847,870.00 City staff, Durrant, and IIW, the designers for the project, will be meeting with representatives from Tschiggfrie Excavating Co. to look for ways to save money on the project through possible redesigns or value engineering. The outcome of those meetings is, however, totally unknown at this time as to whether any significant savings can be identified. Other components of the America's River Project that have come in under budget include the Mississippi River National Education and Conference Center ($904,631) and the Mississippi Riverwalk ($206,712 remaining balance). If the City and the contractor cannot find any savings in the Ice Harbor West Road and Trail design as proposed, the $599,297 shortfall will be covered utilizing part of the $904,631 savings from the Mississippi River National Education and Conference Center bid. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution awarding the construction contract to Tschiggfrie Excavating Company. Prepared by Robert D. Schiesl, P.E., Civil Engineer cc: Pauline Joyce, Administrative Services Manager Mike Jansen, IIW Engineers and Surveyors Julie Neebel, IIW Engineers and Surveyors Jim Kolf, Dun'ant RESOLUTION NO. 490-02 RESOLUTION ADOPTING PLANS AND SPECIFICATIONS Whereas, on the Ist day of August 2002, plans, specifications, form of contract and estimated cost were filed with the City Clerk of Dubuque, Iowa for the Ice Harbor West Road and Trail Project. Whereas, notice of hearing on plans, specifications, form of contract, and estimated cost was published as required by law. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the said plans, specifications, form of contract and estimated cost are hereby approved as the plans, specifications, form of contract and estimated cost for said improvements for said project. Passed, adopted and approved this 16th day of ,September ,2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City-Cl~rk RESOLUTION NO. 491-02 AWARDING CONTRACT Whereas, sealed proposals have been submitted by contractors for the Ice Harbor West Road and Trail Project pursuant to Resolution No.415~0~- and notice to bidders published in a newspaper published in the City of Dubuque, Iowa on the 16th day of August, 2002. Whereas, said sealed proposals were opened and read on the 10th day of September, 2002, and it has been determined that the bid of Tschiggfde Excavating Co. of Dubuque, Iowa, in the amount of $2,447,166.67 was the lowest bid for the furnishings of all labor and materials and performing the work as provided for in the plans and specifications. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the contract for the above improvement be awarded to Tschiggfrie Excavating Co. and the Manager be and is hereby directed to execute a contract on behalf of the City of Dubuque for the complete performance of the work. BE IT FURTHER RESOLVED: That upon the signing of said contract and the approval of the contractor's bond, the City Treasurer is authorized and instructed to retum the bid deposits of the unsuccessful bidders. Passed, approved and adopted this 16th Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk day of September ,2002. ICE HARBOR WEST ROAD AND TRAIL CITY OF DUBUQUE, IOWA BID TABULATION SEPTEMBER t0, 2002 NO. DESCRIPTION QUANTITY 1 Mobilization and Miscellaneous 1 LS 2 Class 10 Excavation 1910 CY 3 Excavation within Sheet Pile Cells 5570 CY 4 Cellular Fill within Sheet Pile Cells 8570 CY 5 Embankment Fill 800 CY 6 Stripping, Salvaging, Stockpiling and Spreading Topsoi 100 CY 7 PSA23 Steel Sheet Pile 51165 SF 8 Splicing Additional Sheet Pile 150 EA 9 Inspection Divers 25 DAYS 10 Concrete Cap 281 LF 11 8" Subdrain Behind Sheet Pile Ceils 300 LF 12 6" Subdrein Within Sheet Pile Cells 435 LF 13 Temporary Shoring 300 LF 14 Modified Macadam 1600 TON 15 3/4" Graded Base Stone 2500 TON 16 3" Crushed Stone Base 244 TON 17 SawCutting (Concrete) 71 LF 18 PCC Surface Removal 369 SY 19 Pavement Replacement (8" PCC with integrel C&G) 2346 SY 20 Reinforced PCC Railroad Crossing 250 SY 21 4"Subdrain 476 LF 22 Connect 4" Subdrain to Inlet 3 EA 23 Sidewalk, 5", Integral Color and Reinforced 7630 SF 24 Intake, 101B 1 EA 25 Adjust Manhole fixture 2 EA 26 15" Storm Sewer (Class ill) 56 LF 27 Modify Existing Catch Basin 1 LS 28 PZ27 Steel Sheet Pile 865 SF 29 Selective Removal, Box Culvert Modificafion 1 LS 30 Structural Concrete, Box Culvert Modification 108.3 CY 31 Plug Manhole and Plug Existing Storm Sewer 1 EA 32 Trench Bedding Stone (Storm) - 15" Pipe 23 TON 33 Trench Select Backfill (Storm) - 15" Pipe 56 LF Subtotal Roadway and Storm TSCHIGGFRIE EX. J.F. BRENNAN CO. UNIT TOTAL UNIT TOTAL PRICE PRICE PRICE PRICE TAYLOR CONST. UNIT TOTAL PRICE PRICE $111,400.00 $111,400.00 $110,128.30 $110,128.30 $400,000.00 $400,000.00 $13.50 $25,785.00 $9.50 $18,145.00 $10.00 $19,100.00 $15.60 $86,892.00 $13.00 $72,410.00 $13.00 $72,410.00 $13.70 $117,409.00 $14.50 $124,265.00 $17.00 $145,690.00 $18.15 $14,520.00 $7.50 $6,000.00 $25.00 $20,000.00 $17.20 $1,720.00 $5.00 $500.00 $18.00 $1,800.00 NO BID NO BID NO BID $90.00 $13,500.00 $150.00 $22,500.00 $140.00 $21,000.00 $850.00 $21,250.00 $2,150.00 $53,750.00 $2,960.00 $74,000.00 $190.80 $53,614.80 $I67.00 $46,927.00 $350.00 $98,350.00 $21.00 $6,300.00 $16.05 $4,815.00 $31.00 $9,300.00 $21.30 $9,265.50 $15.66 $6,812.10 $23.00 $10,005.00 $25,00 $7,500.00 $250.00 $75,000.00 $300.00 $90,000.00 $10.55 $16,880.00 $10.00 $16,000.00 $10.55 $16,880.00 $10.55 $26,375.00 $10.00 $25,000.00 $10.55 $26,375.00 $10.75 $2,623.00 $10.00 $2,440.00 $10.75 $2,623.00 $4.50 $319.50 $3.00 $213.00 $5.00 $355.00 $4.80 $1,771.20 $5.00 $1,845.00 $5.00 $1,845.00 $30.35 $71,201.10 $27~61 $64,773.06 $30.35 $71,201.10 $56.90 $14,225.00 $54.00 $13,500,00 $56.90 $14,225.00 $7.10 $3,379.60 $9.00 $4,284.00 $7.00 $3,332.00 $101.85 $305.55 $150.00 $450.00 $102.00 $306.00 $7.50 $57~225.00 $9.25 $70,577.50 $9.25 $70,577.50 $1,418.45 $1,418.45 $1,350,00 $1,350.00 $1,417,00 $1,417.00 $418~40 $836.80 $225.00 $450.00 $419.00 $838.00 $38.55 $2,158.80 $27.47 $1,538.32 $39.00 $2,184.00 $1,414.75 $1,414.75 $750.00 $750.00 $1,415.00 $1,415.00 $15.00 $12,975.00 $22.00 $19,030.00 $15.00 $12,975.00 $4,983.00 $4,983.00 $7,500.00 $7,500.00 $10,000.00 $10,000.00 $726.30 $78,658.29 $450.00 $48,735.00 $700.00 $75,810.00 $660.70 $660.70 $600.00 $600.00 $661.00 $661.00 $12.00 $276.00 $10.25 $235.75 $12.00 $276.00 $8.60 $481.60 $6.00 $336.00 $9.00 $504.00 $767,324.64 $820,860.03 $1,275,454.60 ICE HARBOR WEST ROAD AND TRAIL CITY OF DUBUQUE, IOWA BID TABULATION SEPTEMBER 10, 2002 Page 2 of 3 NO. DESCRIPTION Water Main Extension 34 Connect to Existing Water Main 35 12" CL 52 DIP with wrap 36 6" CL 52 DIP with wrap 37 8" CL 52 DIP with wrap 38 12" RS Gate Valve with Box 39 8" RS Gate Valve with Box 40 Fittings (Compact Ductile Iron) 41 Boring Set-up with Casing End Seals (Water Main) 42 20" Steel Casing (0.406 wall) with Spacers 43 Select Watermain Backfill 44 Abandon Watermain 45 6" Gate Valve Removal and Salvage to Owner Subtotal Watermain Extension Lighting and City Conduit 5 EA 780 LF 20 LF 12 LF 10 EA 2 EA 2500 LBS 3 EA 98 LF 820 LF 1 LS 1 LS TSCHIGGFRIE EX. UNIT TOTAL PRICE PRICE $783.50 $3,917.50 $48.15 $37,557.00 $35.40 $708.00 $43.20 $518.40 $1,124.20 $11,242.00 $700.20 $1,400.40 $5.35 $13,375.00 $4,426.75 $13,280.25 $165.60 $15,897.60 $14.45 $11,849.00 $596.00 $598.00 $149.00 $149.00 $110,490.15 J. F. BRENNAN CO. UNIT TOTAL PRICE PRICE $1,254.00 $6,270.00 $36.68 $28,610.40 $27.70 $554.00 $29.96 $359.52 $1,567.50 $15,675.00 $858.00 $1,716.00 $2.45 $6,125.00 $2,250.00 $6,750.00 $144.03 $13,826.88 $9.60 $7,872.00 $500.00 $500.00 $350.00 $350.00 $88,608.80 TAYLOR CONST. UNIT TOTAL PRICE PRICE $784.00 $3,920.00 $48.15 $37,557.00 $35.40 $708.00 $43.00 $516.00 $1,124.20 $11,242.00 $700.00 $1,400.00 $5.35 $13,375.00 $4,427.00 $13,281.00 $166.00 $15,936.00 $14.45 $11,849.00 $596.00 $596.00 $149.00 $149.00 $110,529.00 46 Electrical Service 2 EA $7,200.00 $14,400.00 $6,375.00 $12,750.00 $7,500.00 $15,000.00 47 Light Pole and Fixture, Ornamental, Type A 8 EA $2,700.00 $21,600.00 $2,579.00 $20,632.00 $3,000.00 $24,000.00 48 Light Pole and Fixture, Ornamental, Type B 5 EA $3,000.00 $15,000.00 $2,838.00 $14,190.00 $3,600.00 $18,000.00 49 Light Pole and Fixture, Ornamental, Type C 5 EA $3,000.00 $15,000.00 $2,838.00 $14,190.00 $3,600.00 $18,000.00 50 Light Pole Foundation 11 EA $1,194.50 $13,139.50 $850.00 $9,350.00 $600.00 $6,600.00 51 Cast Stone Light Base 8 EA $2,475.90 $19,807.20 $1,911.00 $15,288.00 $2,300.00 $18,400.00 52 Electrical Wire #6 XHHW 3200 LF $0.57 $1,824.00 $0.55 $1,760.00 $0.50 $1,600.00 53 ElectricaIWire #8, XHHW 3338 LF $0.45 $1,502.10 $0.50 $1,669.00 $0.45 $1,502.10 54 Electrical Wire #10, XHHW 3588 LF $0.41 $1,471.08 $0.43 $1,542.84 $0.35 $1,255.80 55 2" Conduit (Sch. 40 PVC) for lighting 2000 LF $3.00 $6,000.00 $4.75 $9,500.00 $2.75 $5,500.00 56 2" Conduit (Sch. 80 PVC) for lighting 320 LF $4.00 $1,280.00 $5.52 $1,766.40 $3.90 $1,248.00 57 3" Conduit (Sch. 40 PVC) for lighting 80 LF $4.75 $380.00 $5~47 $437.60 $5.00 $400.00 58 3" Conduit (Sch. 80 PVC) for lighting 235 LF $10.00 $2,350.00 $6.41 $1,506.35 $13.00 $3,055.00 59 4" Conduit (Sch. 40 PVC) for City awned conduit 2310 LF $4.00 $9,240.00 $5.47 $12,635.70 $3.75 $8,662.50 60 Conduit trenching for City owned conduit 770 LF $4.00 $3,080.00 $4.00 $3,080.00 $3.90 $3,003.00 61 Relocate Railroad Service Pedestal 1 LS $3,000.00 $3,000.00 $835.00 $835.00 $2,500.00 $2,500.00 ICE HARBOR WEST ROAD AND TRAIL CITY OF DUBUQUE, IOWA BID TABULATION SEPTEMBER t0, 2002 Page 3 of 3 NO. DESCRIPTION 62 Hand Hole for lighting 1 EA 63 I~stall 4'x4'x4' PCC Hand Hole 2 EA Subtotal of Electrical Aestetics and landscaping 64 Railroad Fencing 690.75 LF 65 Harbor Railing 325 LF 66 Modular Block Planters 2 EA 67 Landscape Plantings in Planter 2 EA 68 Bench 3 EA 69 Trash Receptacle 1 EA 70 Sod 500 SY Subtotal Aestetics and Landscaping Miscellaneous 71 Traffic Control 1 LS 72 Pavement Marking 1820 LF 73 Erosion Control 1 LS Subtotal Miscellaneous TOTAL BASE BID ALTERNATE ITEM (SUBSTITUTES FOR BASE ITEM) A-7 PS27.5 Steel Sheet Pile 51165 SF A-66 Limestone Planter 2 EA ALTERNATE ITEMS (IN ADDITION TO SASE iTEMS) B-1 66" Storm Sewer (Class Ill) 95 LF B-2 Junction Box #1 1 EA B-3 Structural Concrete, 66" RCP,Headwall 17 CY B-4 Trench Select Backfill (Storm) - 66" Pipe 160 TON B-5 Trench Select Backfill (Storm) - 66" Pipe 95 LF B-6 Demo of Existing Outlet at Sta. 105+98 1 LS Subtotal Storm Sewer Extension TSCHIGGFRIE EX. J. F. BRENNAN CO. UNIT TOTAL UNIT TOTAL PRICE PRICE PRICE PRICE $600.00 $600.00 $336.00 $336.00 $250.00 $500.00 $360.00 . $720.00 $130,173.88 $122,188.89 $160.80 $111,072.60 $155.40 $107,342.55 $174.50 $56,712.50 $170,00 $55,250.00 $1,700.00 $3,400.00 $1,785.00 $3,570.00 $546,00 $1,092.00 $573.00 $1,146.00 $1,175.00 $3,525.00 $1,100.00 $3,300.00 $850.00 $850.00 $825.00 $825.00 $5~00 $2,500.00 $5.75 $2,875.00 $179,152.10 $174,308.55 TAYLOR CONST. UNIT TOTAL PRICE PRICE $500.00 $500.00 $500.00 $1,000.00 $130,226,40 $169.00 $116,736.75 $191.00 $62,075.00 $2,500.00 $5,000.00 $2,500.00 $5,000.00 $1,500.00 $4,500.00 $1,500.00 $1,500.00 $15.00 $7,500.00 $202,311.75 $2,200.00 $2,200.00 $2,200.00 $2,200.00 $2,200.00 $2,200.00 $0.40 $728.00 $0.45 $819.00 $0.40 $728.00 $2,581.25 $2,581.25 $2,000.00 $2,000.00 $5,000.00 $5,000.00 ' $5,509.25 $5,019.00 $7,928,00 ~1~210~985.27 $1,192,650.0~ $17.75 $908,178.75 $4,500.00 $9,000.00 $20.75 $1,061,673.75 $4,824.00 $9,648.00 $19.00 $972,135.00 $2,500.00 $5,000.00 $255.55 $24,277.25 $188.02 $17,861.90 $256.00 $24,320.00 $14,331.90 $14,331.90 $10,400.00 $10,400.00 $14,332.00 $14,332.00 $842.50 $14,322.50 $525.00 $8,925.00 $843.00 $14,331.00 $12.35 $1,976.00 $7.50 $1,200.00 $12.35 $1,976~00 $21.75 $2,066.25 $16.50 $1,567.50 $22.00 $2,090.00 $5,103.00 $5,103.00 $2,250.00 $2,250~00 $5,103.00 $5,103.00 $62,076.90 $42,204.40 $62,152.00 iCE HARBOR WEST ROAD AND TRAIL CITY OF DUBUQUE, iOWA BiD TABULATION SEPTEMBER 10, 2002 Page 4 of 4 SUMMARY BASE BID ALTERNATE ITEM A-7 STORM SEWER EXTENSION GRAND TOTAL TSCHIGGFRIE EX. $1,192,650.02 $908,178.75 $62,076.90 $2,162,905.67 J. F. BRENNAN CO. $1,210,985.27 $1,061,673.75 $42,204.4O $2,314,863.42 TAYLOR CONST. $1,726,449.75 $972,135.00 $62,152.00 $2,760,736.75