Loading...
NW Arterial Watermain Ext. ProjMEMORANDUM September 10, 2002 TO:The Honorable Mayor and City Council Members FROM:Michael C. Van Milligen, City Manager SUBJECT:Northwest Arterial Watermain Extension Project This project provides for the installation of watermain along the Northwest Arterial, from the intersection of Highway 20 to John F. Kennedy Road. This is part of a multi-phase master plan to provide water for residential and industrial growth to the far west area of the community. Water Department Manager Bob Green recommends initiation of the bidding process for the Northwest Arterial Watermain Extension Project, and further recommends that a public hearing be set for October 21, 2002. I concur with the recommendation and respectfully request Mayor and City Council approval. _____________________ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Bob Green, Water Department Manager CITY OF DUBUQUE, IOWA MEMORANDUM September 3, 2002 TO: Michael C. VanMilligen, City Manager FROM: Bob Green, Water Department Manager SUBJECT: Northwest Arterial Watermain Extension Project INTRODUCTION: The purpose of this memorandum is to inform you that the plans and specifications have been completed and received from Veenstra & Kimm, Inc. of West Des Moines, Iowa for the installation of approximately 17,140 feet of 16 inch ductile iron water main along the Northwest Arterial and approximately 1,400 feet of 12 inch ductile iron water main along Pennsylvania Avenue with accessories. DISCUSSION: This project provides for the installation of approximately 18,540 feet of ductile iron watermain along the Northwest Arterial starting at the Intersection of Highway 20 and proceeding north, northeast to John F. Kennedy Road. This is part of a multi-phase master plan in providing water for residential and industrial growth to the far west area of the community. The monies budgeted for the installation services for this watermain project are from the FY '03 Budget and is in the Engineer's estimated cost of $1,118,070 dollars. The schedule for the project is as follows: Advertisement of Bids Friday, September 20, 2002 Notice of Hearing on Plans and Specifications Friday, October 11, 2002 Receipt of Bids Wednesday, October 9, 2002 Public Hearing Monday, October 21, 2002 Award of Contract Monday, October 21,2002 Completion 120 Days from date of signed contract ACTION REQUESTED: Water Department Staff and I are recommending with your approval that the City Council establish a date for the Public Hearing and authorize the City Clerk to advertise for proposals. Enclosures cc: Pauline Joyce, Administrative Services Manager Barry Lindahl, Corporation Counsel Bill Baum, Community Economic Development Manager Mike Brekke, Water Distribution Supervisor File Preparer: Robert M. Green, Water Department Manager 1902 Hawthorne Street 589-4291 RESOLUTION NO.503-02 PRELIMINARY APPROVAL OF PLANS AND SPECIFICATIONS Whereas, the proposed plans, specifications and form of contract for the installation of approximately 17,140 feet of 16 inch ductile iron watermain along the Northwest Arterial and approximately 1,400 feet of 12-inch ductile iron watermain along Pennsylvania Avenue in the estimated amount of $1,118,070.00 dollars have been prepared by Veenstra & Kimm, Inc. of West Des Moines, Iowa. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The proposed plans, specifications and form of contract are approved and ordered filed in the office of the City Clerk for public inspection. Passed, approved and adopted this 16t.h day of Sept'embe, r2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk Preparer: Robert M. Green, Water Department Manager 1902 Hawthorne Street 589-4291 RESOLUTION NO. 504-02 FIXING DATE FOR HEARING ON PLANS AND SPECIFICATIONS Whereas, the City Council of the City'of Dubuque, Iowa has given it's preliminary approval on the proposed plans, specifications, and form of contract and placed same on file in the office of the City Clerk for public inspection of the construction of approximately 17,400 feet of 16" ductile iron water main along the Northwest Arterial and approximately 1,400 feet of 12 inch watermain with accessories along Pennsylvania Avenue. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That on the 21~ day of October 2002 a public hearing will be held at 6:30 p.m. in the Public Library Auditorium at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and cost of said improvement, and the City Clerk be and is hereby directed to cause a notice of time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be not less than four days nor more than twenty days prior to the day fixed for this consideration. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, contract, or estimated cost of the improvement. Passed, adopted and approved this16th day of September, 2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk Preparer: Robert M. Green, Water Department Manager 1209 Hawthorne Street 589-4291 RESOLUTION N O .505-02 ORDERING BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the installation of approximately 17,140 feet of 16 inch ductile iron water main along the Northwest Arterial and 1,400 feet of 12 inch ductile iron watermain with accessories along Pennsylvania Avenue is hereby ordered to be advertised for bids for construction. Section 2. That the amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the notice to bidders hereby approved as part of the plans and specifications heretofore adopted. Section 3. That the City Clerk is hereby directed to advertise for bids for the construction of the improvement herein provided to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall not be less than four days nor more than twenty days prior to the receipt of said bids at 2:00 p.m. on the 9~h day of October, 2002. Bids shall be opened and read by the City Clerk at said time and will be submitted to the Council for final action at 6:30 p.m. on the 21'~ day of October, 2002. .September........ Passed, approved and adopted this16th day or , 2002 Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk Engineers Estimate NW Arterial Water Main Extension Description 1. Traffic Control 2. Stabilizing Material 3. Water Main in Place 3.1 12" DIP ih Open Cut 3.2 12" DIP Augered w/22" Casing 3.3 16" DiP in Open Cut 3.4 16" DIP Augemd wi 26" Casing 4. Se~ding 5. Field Drain Lines 6. 16" C-.-.-.-.-.-.-.-.-.~ Valves witfl Box 7. 12" Gate Valveswith 8. Hydrant Aesembly 9, Cannections to Existing System 9.1 12" 9.2 16" 10. Strest and Driveway Replacement 10.1 Granular 10.2 ACC 10,3 PCC 10.4 6" Curb and Gutter 11. Replace Riprap 12. Replace Storm Drains 12.1 12" RCP 17-2 15" RCP 12.3 16" RCP 17_4 24" RCP 12.5 36" RCP 13. Erosion Control Mating Units Unit Cost Quantity Extended Cost LS ~ xxx~ $5,000.00 CY $2?_00 20O $4,400.00 LF $40.00 1090 $43,000.00 LF $180.00 120 $21,600.00 LF $45.00 16620 $747,900.00 LF $190.00 680 $129,200.00 L$ xxxxx xxxxx $2D,000.00 LF $,5.00 1000 $5,000.00 Ea. $4,000.00 14 $56,000.00 Ea. $3,CQ0.00 2 $6,CO0.Q0 Ea. $2,500.00 11' $27,500.00 Ea. $3,000.00 3 $9,000.00 Ea, $4,000.00 3 $12,000.00 Tons $30.00 50 $1,500.00 LF $28.0O LF $28.00 LF $56.00 LF $59.00 LF $80.00 SY $1.50 12 $336:00 20 $500.00 72 $4,002.00 48 $2,832.OO 12 $960.00 5000 $7,500.00 Total: $1,118,070.00 9/6t20~2 Veenstm K]mm,[nc