Loading...
911 High Bluff Retaining Wall Reconstruction AcceptanceTHE crrY oz= Dubuque -~~ ~T T~ ~ AII-Ar~ricaC~y ~,..J 1 -~ ~ ~ ~ Masterpiece on the Missssiirp1 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 911 High Bluff Retaining Wall Repair Project DATE: February 10, 2009 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 911 High Bluff Retaining Wall Repair Project, as completed by Arensdorf Trucking & Excavating, Inc., in the final contract amount of $112,371.04. This cost was $8,952.12 higher than anticipated due to the fact that an additional 10 feet of wall needed repair to securely fasten it to either end of the existing retaining wall. I concur with the recommendation and respectfully request Mayor and City Council approval. ,. ~ L~ Mic ael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque DT T~ ~ AA-Ameri~aCny LJ Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Man FROM: Gus Psihoyos, City Engineer . ~.- SUBJECT: 911 High Bluff Retaining Wall Repair Project CIP 3502089 DATE: February 9, 2009 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 911 High Bluff Retaining Wall Repair Project. BACKGROUND On October 13, 2008, the City Council authorized (Resolution 359-08) emergency repairs to a retaining wall on private property behind 911 High Bluff and street pavement of Thomas Place. This project was necessitated due to the impending collapse of the private retaining wall endangering the private residence and also the nearby street pavement. The property owner of 911 High Bluff was notified by the City that it was proceeding with the repair due to the property owner's failure to complete the work in a timely manner. Based on Iowa Code § 384.103 and § 364.12(3)(c), and through the competitive quotation process for public improvements, this project was awarded on October 20, 2008 to Arensdorf Trucking & Excavating, Inc. of Anamosa, Iowa, in the amount of $103,418.92. DISCUSSION The 911 High Bluff Retaining Wall Repair Project was completed by Arensdorf Trucking & Excavating, Inc. of Anamosa, Iowa, in the final contract amount of $112,371.04. Award Final Construction Contract Contingency Construction Engineering & Inspection Total Project Cost $103,418.92 $112,371.04 10,341.89 0 17.064.12 27,368.19 $130,824.93 $139,739.23 The increased construction cost is based on the need to remove and repair an additional 10 feet of wall so that the wall repair is securely fastened to either end of the existing retaining wall. At a later Council meeting, the Engineering Department will request a public hearing to approve an assessment for the property owner of 911 High Bluff Street. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract in the amount of $112,371.04 to Arensdorf Trucking & Excavating, Inc. for the 911 High Bluff Retaining Wall Repair Project. BUDGET IMPACT The project funding summary is as follows: CIP No. Fund Description 3502089 High Bluff/Thomas Wall Total Project Funding Fund Amount $139,739.23 $139,739.23 Due to the project cost, the associated street repair of Thomas Place will be handled as a separate project. It is the intent of the Engineering Department to initiate this project in spring, 2009, as part of the City's annual street program. ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract in the amount of $112,371.04 to Arensdorf Trucking & Excavating, Inc. for the 911 High Bluff Retaining Wall Repair Project. Prepared by Jon Dienst, PE cc: Barry Lindahl, City Attorney Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer RESOLUTION NO. 51-09 ACCEPTING THE 911 HIGH SLUFF RETAINING WALL REPAIR PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 911 High Bluff Retaining Wall Repair .Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the High Bluff/Thomas Wall Capital Improvement Program appropriation (GIP#3502089) for the contract amount of $112,371.04 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 16th day of February, 2009. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 911 HIGH SLUFF RETAINING WALL REPAIR PROJECT The undersigned City Engineer of the Ci#y of Dubuque, Iowa, hereby certifies that he has inspected the 911 High Bluff Retaining Wall Repair Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $139,739.23. Dated this 11th day of February, 2009. City Engineer Filed in the office of the City Clerk on the 11th day of February, 2009. Jeanne F. Schneider, CMC, City Clerk THE CTTY OF DUB E Masterpiece on the Mississippi 'ARTIAL PAYMENT NO: City of Dubuque -Engineering Division Council Final Payment Form COUNCIL FINAL PROJECT NAME: 911 HIGH BLUFF RETAINING WALL REPAIR DATE: February 6, 2009 CONTRACTOR: ARENSDORF EXCAVATING & TRUCKING, INC. CONTRACT AMOUNT: 5103,418.92 BID ITEM DESCRIPTION UNIT UNIT COST OUANTITY AMOUNT EARNED TO DATE TO DATE DEMOLITION & REMOVAL 1 Structure Removal LS $ 22,684.21 1.00 $ 22,684.21 2 Excavation (Unclassified) CY $ 3.85 340.00 $ 1,309.00 3 Remove Railing & Posts LF $ 5.56 110.00 $ 611.60 STONE & PAVEMENT 4 PC Concrete Pavement, (7") w/Integral Curb, Class "C" SY $ 45.00 $ - 5 Graded Stone Base, 3/4" TONS $ 13.07 73.18 $ 956.46 6 HMA 300k Surface Course, 1/2" (PG 64-22) TONS $ 70.00 $ - 7 PC Concrete Curb & Gutter, 2.5' Construct LF $ 20.00 $ - 8 PC Concrete Sidewalk, 4" Construct SF $ 5.56 $ - SANITARY SEWER 9 8" DIP w/Bedding LF $ 43.87 $ - 10 8" x 4" DIP Tee EA $ 385.00 $ - 11 4" DIP Lateral w/ Bedding LF $ 16.59 $ - 12 Locate Existing Lateral/Exploration EA $ 497.37 $ - RETAINING WALL ITEMS 13 Structural Concrete CY $ 652.48 66.25 $ 43,226.80 14 Engineered Fill TONS $ 14.77 139.46 $ 2,059.82 15 Satisfactory Soil CY $ 11.03 $ - 16 Geofoam Fill CY $ 90.00 75.30 $ 6,777.00 17 Geotextile Fabric SY $ 8.33 88.00 $ 733.04 18 4" Perforated CPE Drain Tile 19 Chain Link Fence LF $ 6.76 67.00 $ 452.92 LF $ 44.69 105.25 $ 4,703.62 MISCELLANEOUS 20 Sawcut Pavement -Regardless of Type LF $ 4.00 $ - 21 Erosion Control Plan -Operating Procedures LS $ 842.11 1.00 $ 842.11 22 Traffic Control and Safety Control LS $ 555.56 1.00 $ 555.56 23 Mobilization & Miscellaneous LS $ 9,911.58 0.95 $ 9,416.00 TOTAL AMOUNT EARNED TO DATE: $ 94,328.15 CHANGE ORDER -EXTRA WORK ITEMS Macadam under Footing TONS $15.53 42.42 $ 658.78 Structure Removal LS $16,000.00 1.00 $ 16,000.00 Sawcutting of Wall Footing LF $4.00 18.00 $ 72.00 Geofoam CY $62.75 20.91 $ 1,312.10 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: E 18,042.89 TOTAL AMOUNT EARNED TO DATE: E 112,371.04 TOTAL DUE CONTRACTOR: S 112,371.04 ENGINEERING: S 27,368.19 TOTAL CONSTRUCTION COST: S 139,739.23 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael V ' igen, City Man ger City of D b ,Iowa APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Arensdorf Excavating & Trucking, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full,Gs}e-~ttlement for all claims for said improvement. CONTRACTOR: ~~~- ~ S i~v~-~ ~~~~' 1 TITLE: ~ ''"`~ DATE: '~ ~~ ~ - ~~ City of Dubuque -Engineering Division THE CITY OF Council Final Payment Form DUB E Masterpiece on the Mississippi 'ARTIAL PAYMENT NO: COUNCIL FINAL DATE: February 6, 2009 PROJECT NAME: 911 HIGH BLUFF RETAINING WALL REPAIR CONTRACTOR: ARENSDORF EXCAVATING 8 TRUCKING, INC. CONTRACT AMOUNT: $103,418.92 QUANTITY AMOUNT EARNED BID ITEM DESCRIPTION UNIT UNIT COST TO DATE TO DATE DEMOLITION & REMOVAL 1 Structure Removal LS $ 22,684.21 1.00 $ 22,684.21 2 Excavation (Unclassified) CY $ 3.85 340.00 $ 1,309.00 3 Remove Railing & Posts LF $ 5.56 110.00 $ 611.60 STONE & PAVEMENT 4 PC Concrete Pavement, (7") w/Integral Curb, Class "C" SY $ 45.00 $ - 5 Graded Stone Base, 3/4" TONS $ 13.07 73.18 $ 956.46 6 HMA 300k Surface Course, 1/2" (PG 64-22) TONS $ 70.00 $ - 7 PC Concrete Curb & Gutter, 2.5' Construct LF $ 20.00 $ - 8 PC Concrete Sidewalk, 4" Construct SF $ 5.56 $ - SANITARY SEWER 9 8" DIP w/Bedding LF $ 43.87 $ - 10 8" x 4" DIP Tee EA $ 385.00 $ - 11 4" DIP Lateral w/ Bedding LF $ 16.59 $ - 12 Locate Existing Lateral/Exploration EA $ 497.37 $ - RETAINING WALL ITEMS 13 Structural Concrete CY $ 652.48 66.25 $ 43,226.80 14 Engineered Fill TONS $ 14.77 139.46 $ 2,059.82 15 Satisfactory Soil CY $ 11.03 $ - 16 Geofoam Fill CY $ 90.00 75.30 $ 6,777.00 17 Geotextile Fabric SY $ 8.33 88.00 $ 733.04 18 4" Perforated CPE Drain Tile LF $ 6.76 67.00 $ 452.92 19 Chain Link Fence LF $ 44.69 105.25 $ 4,703.62 MISCELLANEOUS 20 Sawcut Pavement -Regardless of Type LF $ 4.00 $ - 21 Erosion Control Plan -Operating Procedures LS $ 842.11 1.00 $ 842.11 22 Traffic Control and Safety Control LS $ 555.56 1.00 $ 555.56 23 Mobilization & Miscellaneous LS $ 9,911.58 0.95 $ 9,416.00 TOTAL AMOUNT EARNED TO DATE: $ 94 328.15 CHANGE ORDER -EXTRA WORK ITEMS Macadam under Footing TONS $15.53 42.42 $ 658.78 Structure Removal LS $16,000.00 1.00 $ 16,000.00 Sawcutting of Wall Footing LF $4.00 18.00 $ 72.00 Geofoam CY $62.75 20.91 $ 1,312.10 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: S 18,042.89 TOTAL AMOUNT EARNED TO DATE: S 112,371.04 TOTAL DUE CONTRACTOR: 3 112,371.04 ENGINEERING: 5 27,368.19 TOTAL CONSTRUCTION COST: S 139,739.23 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van anager City of u e, Iowa `~~~ APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Arensdorf Excavating 8 Trucking, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: !~ ~~~,~~--z~~c.~v.:.L~~,~ T ~ `` BY: ~- ' ~ ~~-'~. TITLE: ,~ ~ ~ DATE: `~ ~ ~~~ THE CITY OF DUB E Masterpiece on the Mississippi MARTIAL PAYMENT NO: City of Dubuque -Engineering Division Council Final Payment Form COUNCIL FINAL PROJECT NAME: 911 HIGH BLUFF RETAINING WALL REPAIR ~FQY:: A " t c'J I~^"L'J t.,,Y?,, k.:.l` 1 :..1; ~.tiX..~/ Y DATE: February 6, 2009 CONTRACTOR: ARENSDORF EXCAVATING & TRUCKING, INC. CONTRACT AMOUNT: x103,418.92 QUANTITY AMOUNT EARNED BID ITEM DESCRIPTION UNIT UNIT COST TO DATE TO DATE DEMOLITION & REMOVAL 1 Structure Removal LS $ 22,684.21 1.00 $ 22,684.21 2 Excavation (Unclassified) CY $ 3.85 340.00 $ 1,309.00 3 Remove Railing & Posts LF $ 5.56 110.00 $ 611.60 STONE 8~ PAVEMENT 4 PC Concrete Pavement, (7") wllntegral Curb, Class "C" SY $ 45.00 $ - 5 Graded Stone Base, 314" TONS $ 13.07 73.18 $ 956.46 6 HMA 300k Surface Course, 1/2" (PG 64-22) TONS $ 70.00 $ - 7 PC Concrete Curb & Gutter, 2.5' Construct LF $ 20.00 $ - 8 PC Concrete Sidewalk, 4" Construct SF $ 5.56 $ - SANITARY SEWER 9 8" DIP w/Bedding LF $ 43.87 $ - 10 8" x 4" DIP Tee EA $ 385.00 $ - 11 4" DIP Lateral w/ Bedding LF $ 16.59 $ - 12 Locate Existing Lateral/Exploration EA $ 497.37 $ - RETAINING WALL ITEMS 13 Structural Concrete CY $ 652.48 66.25 $ 43,226.80 14 Engineered Fill TONS $ 14.77 139.46 $ 2,059.82 15 Satisfactory Soil CY $ 11.03 $ - 16 Geofoam Fill CY $ 90.00 75.30 $ 6,777.00 17 Geotextile Fabric SY $ 8.33 88.00 $ 733.04 18 4" Perforated CPE Drain Tile LF $ 6.76 67.00 $ 452.92 19 Chain Link Fence LF $ 44.69 105.25 $ 4,703.62 MISCELLANEOUS 20 Sawcut Pavement -Regardless of Type LF $ 4.00 $ - 21 Erosion Control Plan -Operating Procedures LS $ 842.11 1.00 $ 842.11 22 Traffic Control and Safety Control LS $ 555.56 1.00 $ 555.56 23 Mobilization & Miscellaneous LS $ 9,911.58 0.95 $ 9,416.00 TOTAL AMOUNT EARNED TO DATE: S 94,328.15 CHANGE ORDER -EXTRA WORK ITEMS _ Macadam under Footing TONS $15.53 42.42 $ 658.78 Structure Removal LS $16,000.00 1.00 $ 16,000.00 Sawcutting of Wall Footing LF $4.00 18.00 $ 72.00 Geofoam CY $62.75 20.91 $ 1,312.10 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: b 18,042.89 TOTAL AMOUNT EARNED TO DATE: x 112,371.04 TOTAL DUE CONTRACTOR: S 112,371.04 ENGINEERING: S 27,368.19 TOTAL CONSTRUCTION COST: ~ 139,739.23 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail a Corr t amount of all work required to complete the above imp v ent V ~"' APPROVED: Michael Van Mi ' n, ity ager City of D ,Iowa APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, ArensdorF Excavating & Trucking, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for al claims for said improvement. CONTRACTOR: ~ ~ ~ci~z~,~ - ~.. BY: _ ~_, TITLE: .P/r- DATE: ~ C - O j