NW Arterial Watermain Ext. ProMEMORANDUM October 15, 2002 TO:The Honorable Mayor and City Council Members FROM:Michael C. Van Milligen, City Manager SUBJECT:Northwest Arterial Watermain Extension Project Sealed bids were received for the Northwest Arterial Watermain Extension Project. Water Department Manager Bob Green recommends award of the contract to the Iow bidder, Tschiggfrie Excavating, in the amount of $887,683.35, which is approximately 21% under the engineer's estimate. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Bob Green, Water Department Manager CITY OF DUBUQUE,IOWA MEMORANDUM October 10, 2002 TO: Michael C. Van Milligen, City Manager FROM: Bob Green, Water Department Manager SUBJECT: Northwest Artedal Watermain Extension Project INTRODUCTION: The purpose of this memorandum is to recommend that the City Council approve the attached resolutions adopting the plans and specifications and awarding the contract for the watermain project along the Northwest Arterial and Pennsylvania Avenue. DISCUSSION: This project provides for approximately 17,140 feet of 16 inch watermain and 1,400 feet of 12 inch ductile iron water pipe with accessories to be installed along the Northwest Arterial and Pennsylvania Avenue. The project is a part of a multi phase master plan in providing water to the far west area of the City for residential and industrial growth. Eleven bids were received from contractors for this project. The bids were as follows: Company Bids 1. Brockenstedt Excavating, Inc. Iowa City, Iowa $1,103,580.00 2. Connolly Construction, Inc. Peosta, Iowa $ 907,695.90 3. Denver Construction, Inc. Denver, Iowa $1,089,888.00 4. Drew Cook & Sons Ex. Inc. Dubuque, Iowa $ 903,172.00 5. Fisher Excavating, Inc. Rockford, Iowa $1,057,218.50 6. Horsfield Construction, Inc. Epworth, Iowa $ 937,247.00 7. McClain Excavating, Inc. Peosta, Iowa $ 956,004.20 8. Morris & Co., Inc. Marion, Iowa $1,149,963.00 9. Portzen Construction Dubuque, Iowa $ 902,781.00 10. W. C. Stewart Construction, Inc. Dubuque, Iowa $ 948,352.76 11. Tschiggfde Excavating Dubuque, Iowa $ 887,683.35 The monies for this project will come from the sale of G. O. Bonds through our Capital Improvement Project Fund. The Engineer's estimate for this project was $1,118,070. The Iow bid is approximately 21% under the engineer's estimate and within our proposed budget. ACTION REQUESTED: I recommend that the City Council approve the attached resolutions adopting the plans and specifications and awarding the contract to Tschiggfrie Excavating of Dubuque, Iowa in the amount of $887,683.35. Attach. cc: Bill Baum, Community/Economic Development Manager Mike Koch, City Engineer Pauline Joyce, Administrative Services Manager Mike Brekke, Water Distribution Supervisor File PREPARER: ROBERT M. GREEN, WATER DEPARTMENT MANAGER 1902 HAWTHORNE ST. 589-4291 576 RESOLUTION NO. 576-02 RESOLUTION ADOPTING PLANS AND SPECIFICATIONS Whereas, on 16th day of September, 2002 plans, specifications, form of contract and estimated cost were filed with the City Clerk of Dubuque, Iowa for the installation of approximately 17,140 feet of 16 inch ductile iron watermain along the Northwest Arterial and 1,400 feet of 12 inch ductile iron watermain along Pennsylvania Avenue. Whereas, notice of hearing on the plans, specifications, form of contract and estimated cost was published as required by law. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the said plans, specifications, form of contract and estimated cost are hereby approved as the plans, specifications, form of contract and estimated cost of said improvements for said project. Passed, approved and adopted this 21st day of October, 2002. Terence M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk PREPARER: ROBERT M. GREEN, WATER DEPARTMENT MANAGER 1902 HAWTHORNE STREET 589-4291 RESOLUTION NO. 577-02 AWARDING CONTRACT TO TSCHIGGFRIE EXCAVATING OF DUBUQUE, IOWA FOR THE CONSTRUCTION OF APPROXIMATELY 17,140 FEET OF 16 INCH DUCTILE IRON WATERMAIN WITH ACCESSORIES ALONG THE NORTHWEST ARTERIAL STARTING AT THE INTERSECTION OF HIGHWAY 20 AND CONTINUING TO THE NORTHEAST TO JOHN F. KENNEDY ROAD AND FOR THE CONSTRUCTION OF APPROXIMATELY 1,400 FEET OF 12 INCH DUCTILE IRON WATERMAIN WITH ACCESSORIES ALONG PENNSYLVANIA AVENUE FROM THE NORTHWEST ARTERIAL WEST TO THE PENNSYLVANIA WATER TANK. Whereas, the Northwest Arterial Watermain Extension Project has been budgeted; and Whereas, Tschiggfrie Excavating of Dubuque, Iowa has submitted to the City an agreement to conduct construction services of this improvement in the amount of $887,683.35 dollars; and Whereas, funds have been legally appropriated for this expenditure. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the City Manager is authorized to execute the agreement for construction services with Tschiggfrie Excavating of Dubuque, Iowa for the construction of approximately 17,140 feet of 16 inch ductile iron water pipe and 1,470 feet of 12 inch ductile iron water pipe with accessories along the Northwest Arterial and Pennsylvania Avenue in the amount of $887,883.35. Passed, adopted and approved this 21st day of October, 2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk Proposed N. W. Arterial Water Main Extension 18/18/2882 18:83 t3194GG1808 VEENSTRA & KIMM, INC. October 10, 2002 Robert M. Green Water Department Manager City of Dubuque 50 West 13th Street Dubuque, Iowa 52001-4864 DUBUQUE, IOWA NORTHWEST ARTERIAL WATER MAIN EXTENSION RECOMMENDATION TO AWARD CONTRACT The City of Dubuque received and opened bids for the Northwest Arterial Water Main Extension Project on October 9, 2002. A total of eleven bids were received as follows: Contractor Base Bid Alternate I Alternate 2 Bockenstedt $ 1,091,080.00 $10,000.00 $2,500.00 $1,103,580.00 Excavating, Inc. Connolley $904,495.90 $1,$00.00 $1,700.00 $907,695.90 Construction, Inc. Denver $1,071,3§8.00 $15,000.00 $3,500.00 $1,089,888.00 Construction, ]nc. Drew Cook & Sons $897,672.00 $4,000.00 $1,500.00 $903,172.00 Ex., Inc. Fisher Excavating, $1,052,568.50 $1,650.00 $3,000.00 $1,057,218.50 Inc. Horsfield $912,247.00 $20,000.00 $,5,000.00 $937,247.00 Construction, Inc. McClain $949,254.20 $3,750.00 $3,000.00 $956,004.20 Excavating, Inc. Bob Green OCtober 1 o,, 2002' Page 2 Contractor ~ i Alternate I Alternate~2~ : ~ Morris & Co. Inc. $1,139,339.00 $6,624.00 $4,000.00 $1,149,963.00 Portzen $897,731.00 $2,550.00 $2,500.00 $902,781.00 Construction, ]nc. WC 5tewert · · $933,257.76 $13,395.00 $1,700.00 $948,352.76 Construction, Inc. Tschlggfrie $878,483.35 $4,400.00 $4,800.00 $887,683.35 Excavating Co. Inc. The apparent Iow total bid wa~ submitted by Tschiggfrie Excavating Co., Inc. of Dubuque, Iowa in the amount of $887,683.35. Attached is a bid tabulation for the project. The Engineer's Estimate of cost for construction of the project was $1,118,070.00. The iow bid submitted by Tschigg'frie Excavating, Co. Inc. was 21% below the Engineer's Estimate of cost. The apparent Iow bidder is experienced in this type of work and has worked on various similar types of work for the City. Based on a review of the bid received it would be our recommendation that the bid is fair and reasonable and responsive to the bidding documents. ']'he proposals for the alternate work also appears fair and reasonable. We would recommend that the City of Dubuque award contract to Tschiggfrie Construction Co., Inc. in the amount of $878,483.35 based on its bid received on October 9, 2002. This contract would include the base bid proposal and the proposals for Alternates 1 and 2. if you have any questions regarding the project, please contact us at 466-1000. VEENSTRA & KIMM, INC. Leo F. Foley, P.E. Enclosures 3439 !~1948~1808 VEENSTRA & MIMIC, INC P~ lB:B3 i~1~4661008 VEENSTRA & KI~, INC PAf~ 08 MEMORANDUM September 10, 2002 TO:The Honorable Mayor and City Council Members FROM:Michael C. Van Milligen, City Manager SUBJECT:Northwest Arterial Watermain Extension Project This project provides for the installation of watermain along the Northwest Arterial, from the intersection of Highway 20 to John F. Kennedy Road. This is part of a multi-phase master plan to provide water for residential and industrial growth to the far west area of the community. Water Department Manager Bob Green recommends initiation of the bidding process for the Northwest Arterial Watermain Extension Project, and further recommends that a public hearing be set for October 21, 2002. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Bob Green, Water Department Manager CITY OF DUBUQUE, IOWA MEMORANDUM September 3, 2002 TO: Michael C. VanMilligen, City Manager FROM: Bob Green, Water Department Manager SUBJECT: Northwest Arterial Watermain Extension Project INTRODUCTION: The purpose of this memorandum is to inform you that the plans and specifications have been completed and received from Veenstra & Kimm, Inc. of West Des Moines, iowa for the installation of approximately 17,140 feet of 16 inch ductile iron water main along the Northwest Arterial and approximately 1,400 feet of 12 inch ductile iron water main along Pennsylvania Avenue with accessories. DISCUSSION: This project provides for the installation of approximately 18,540 feet of ductile iron watermain along the Northwest Arterial starting at the Intersection of Highway 20 and proceeding north, northeast to John F. Kennedy Road. This is part of a multi-phase master plan in providing water for residential and industrial growth to the far west area of the community. The monies budgeted for the installation services for this watermain project are from the FY '03 Budget and is in the Engineer's estimated cost of $1,118,070 dollars. The schedule for the project is as follows: Advertisement of Bids Friday, September 20, 2002 Notice of Hearing on Plans and Specifications Friday, October 11, 2002 Receipt of Bids Wednesday, October 9, 2002 Public Hearing Monday, October 21, 2002 Award of Contract Monday, October 21,2002 Completion 120 Days from date of signed contract ACTION REQUESTED: Water Department Staff and I are recommending with your approval that the City Council establish a date for the Public Hearing and authorize the City Clerk to advertise for proposals. Enclosures cc: Pauline Joyce, Administrative Services Manager Barry Lindahl, Corporation Counsel Bill Baum, Community Economic Development Manager Mike Brekke, Water Distribution Supervisor File Preparer:. Robert M. Green, Water Department Manager 1902 Hawthorne Street 589-4291 RESOLUTION NO. -02 PRELIMINARY APPROVAL OF PLANS AND SPECIFICATIONS Whereas, the proposed plans, specifications and form of contract for the installation of approximately 17,140 feet of 16 inch ductile iron watermain along the Northwest Arterial and approximately 1,400 feet of 12-inch ductile iron watermain along Pennsylvania Avenue in the estimated amount of $1,118,070.00 dollars have been prepared by Veenstra & Kimm, Inc. of West Des Moines, Iowa. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The proposed plans, specifications and form of contract are approved and ordered filed in the office of the City Clerk for public inspection. Passed, approved and adopted this day of ,2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk Preparer: Robert M Green~ Water Department Manager 1902 Hawthorne Street 589-4291 RESOLUTION NO. -02 FIXING DATE FOR HEARING ON PLANS AND SPECIFICATIONS Whereas, the City Council of the City'of Dubuque, Iowa has given it's preliminary approval on the proposed plans, specifications, and form of contract and placed same on file in the office of the City Clerk for public inspection of the construction of approximately 17,400 feet of 16" ductile iron water main along the Northwest Arterial and approximately 1,400 feet of 12 inch watermain with accessories along Pennsylvania Avenue. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That on the 21st day of October 2002 a public hearing will be held at 6:30 p.m. in the Public Library Auditorium at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and cost of said improvement, and the City Clerk be and is hereby directed to cause a notice of time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be not less than four days nor more than twenty days prior to the day fixed for this consideration. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, contract, or estimated cost of the improvement. Passed, adopted and approved this day of ,2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk Preparer: Robert M. Green, Water Department Manager 1209 Hawthorne Street 589-4291 RESOLUTION NO. --02 ORDERING BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the installation of approximately 17,140 feet of 16 inch ductile iron water main along the Northwest Arterial and 1,400 feet of 12 inch ductile iron watermain with accessories along Pennsylvania Avenue is hereby ordered to be advertised for bids for construction. Section 2. That the amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the notice to bidders hereby approved as part of the plans and specifications heretofore adopted. Section 3. That the City Clerk is hereby directed to advertise for bids for the construction of the improvement herein provided to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall not be less than four days nor more than twenty days prior to the receipt of said bids at 2:00 p.m. on the 9th day of October, 2002. Bids shall be opened and read by the City Clerk at said time and will be submitted to the Council for final action at 6:30 p.m. on the 21~t day of October, 2002. Passed, approved and adopted this day of ,2002. Attest: Terrance M. Duggan, Mayor Jeanne F. Schneider, City Clerk Engineers Estimate NW Arterial Water Main Extension Description 1. Traffic Control 2. Stabilizing Material 3. Water Main in Place 3.1 12" DIP i~ Open Cut 3.2 12" DiP Augered w/22" Casing 3.3 16- DIP in Open Cut 3.4 16" DiP Augered wi 26" Casing 4. Seeding 5. Fisid Drain Lines 6. 16" Gats Valves witfl Box 7. 12" Gate Valves witfl Box 8. Hydrant Assembly 9. Connections ts F_.x~dng System 9.1 12" 9.2 16' 10. Street and Driveway Replacemest 10.1 Granular 10.2 ACC 10.3 PCC 10.4 6" Curb and Gutter 11. Replace Ripmp 12: Replace Ston'n Drains 12.1 12" RCP 12.2 16" RCP 12.3 16" RCP 12.4 24" RCP 12.5 36" RCP 13. Erosion Control Marling Units Unit Cost Quantity Extended Cost LS xx~x xxxxx $5,000.00 CY $22.00 200 $4,400.00 LF $40.00 1090 $43,600.00 LF $180.00 120 $21,600.00 LF $45.00 16620 $747,900.~0 LF $190.00 680 $129,200.00 LS xx:¢xx xx~x $2O,000.00 LF $5.00 1000 $5,000.00 Ea. $4,000.00 14 $56,000.00 Ea. $3,000.00 2 $6,000.00 Ea. $2,500.00 11- $27,500.00 Ea. $3,QQO.O0 3 $9,000.00 Ea. $4,000.00 3 $12,000.Q0 Tons $2O.00 15 $300.00 SY $6~.Q0 90 $5,850.00 SY $70.00 80 $5,600.00 LF $2O.00 70 . $1,400.00 Tons $30.00 50 $1,500.~0 LF $28.00 12 $336:00 LF $28.00 2O $560.00 U= $56.00 72 $4,032,00 LF $59.00 48 $2,832.00 LF $80.00 12 $960.00 SY $1.50 5000 $7,500.00 Total: $1,118,070.00 Proposed N. W. Arterial Water Main Extension