Kephart Building Improvement Project2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Kephart Building Improvement Project (CIP 360-1976/260-1976/101-1976) DATE: February 23, 2009 City Engineer Gus Psihoyos is recommending that a public hearing be set for March 16, 2009, to consider the Kephart Building Improvement Project. I concur with the recommendation and respectfully request Mayor and City Council approval. Mich el C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF ~,~ ~T T L V Maste~ptece on the Mtsstsstppt TO: Michael C. Van Milligen, City Mana er FROM: Gus Psihoyos, City Engineer SUBJECT: Kephart Building Improvement Project (CIP 360-1976/260-1976/101-1976) DATE: February 20, 2009 INTRODUCTION D~u,,b~u q,,u~/e AI '~II~a' zoos The enclosed resolutions authorize the public bidding procedure for the Kephart Building Improvement Project. BACKGROUND The Kephart Building is a two-story building consisting of approximately 6,200 square feet of floor space on the first floor and approximately 2,800 square feet on the second floor. The building also has a shallow, unfinished basement (ceiling height of 6 feet) that is primarily suitable for the building's utility services and some storage space. After a consultant selection process was conducted, the City Council approved the selection of The Durrant Group of Dubuque to provide architectural design and construction services for the project. DISCUSSION After a thorough review of the building condition by Durrant, the scope of work for the renovation project is as follows: General Nature of Public Improvement. In general, the project consists of a remodel to the first floor and basement of the former Kephart Music Building, located at 1157 Central Avenue in Dubuque, Iowa. 1. First Floor - Conversion of the space to the Multicultural Family Center. - Selective demolition. - Addition of a sprinkler system. - Addition of a stairwell and elevator to all levels. - Work in these areas will include wood studs and gypsum board, new finishes, a fireplace, ADA required improvements, new furnishings and new HVAC/electrical systems. - A portion of salvaged materials from the Roshek Building will be re-used, including some bathroom fixtures and accessories, and ceiling tile. 2. Basement - Selective demolition. - Addition of a sprinkler system. - Work will include partial renovation to include stairwell and elevator, new mechanical and electrical spaces. 3. Second Floor - No work will occur at this time. Other Miscellaneous exterior work will include masonry tuckpointing and reworking the existing storefront to include a new entry. The existing roof materials will be removed and replaced on the high and low roofs with new insulation and a single ply membrane. PROJECT SCHEDULE Initiate Public Bidding Process March 2, 2009 Advertisement for Bids March 6, 2009 Notice of Public Hearing on Plans and Specifications March 6 & 13, 2009 Public Hearing March 16, 2007 Pre-Bid Meeting March 19, 2009 Receipt of Bids March 31, 2009 Award of Contract April 6, 2009 Project Substantial Completion July 24, 2009 RECOMMENDATION It is recommended that the City Council establish the date of the public hearing and authorize the City Clerk to advertise for proposals for the Kephart Building Improvement Project. BUDGET IMPACT The estimate of probable cost for the Kephart Building Improvement Project is as follows: PROJECT COSTS ESTIMATE Construction Hard Costs Base Construction Work $ 583,820 Earl Deconstruction Bid Packa a Com leted $ 20,400 Contin enc - 13%"` $ 79,700 Hazardous Material Abatement $ 10,000 Fixtures, Furnishin s & E ui ment $ 32,000 Communications/Data/Securit $ 25,000 Total -Bid Project Cost 750 920 O tional Construction Add Alternates: 1 Li ht Tubes on Low Roof + $ 8,400 2 Low Roof Perimeter Securit Fence + $15,000 3 Base Cabinets at Kitchen Counter + $ 4,800 Pro'ect Soft Costs En r./Arch./LEED Cert. Fees $ 61,794 Cit En ineerin Fees $ 10,000 Misc. Costs -Builders Risk Ins., Cleanin , Tem . Si ns, etc. $ 11,000 Total - Pro'ect Soft Costs 82 794 TOTAL PROJECT COST ` $ 833,714 "Contingency is increased to 13% due to the age of the building. The project will be funded from CIP 3601976 and 2601976, with a total of $861,021 in funds available for the project. This amount leaves $28,000 in funding available to be used to allow selection of Add Alternatives or further Fixtures, Furnishings & Equipment purchases. ACTION TO BE TAKEN The City Council is requested to establish the date of the public hearing and to authorize the City Clerk to advertise for proposals through the adoption of the attached resolutions. cc: Jenny Larson, Budget Director Rich Russell, Building Services Manager RESOLUTION NO. 86-09 KEPHART BUILDING IMPROVEMENT PROJECT PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: the proposed plans, specifications, form of contract and estimated cost for the Kephart Building Improvement Project, in the estimated amount $833,714, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. a public hearing will be held on the 16t" day of March, 2009, at 6:30 p.m. in the Historic Federal Building .Council Chambers at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. The Kephart Building Improvement Project is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four but not more than forty-five days before the date for filing bids before 2:00 p.m. on the 31St day of March, 2009. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:30 p.m. on the 6th day of April, 2009, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Passed, adopted and approved this 2nd day of March, 2009. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE KEPHART BUILDING IMPROVEMENT PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque,_ Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Kephart Building Improvement Project, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 16th day of March, 2009, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: In general, the project consists of a remodel to the first floor and basement of the former Kephart Music Building, located at 1157 Central Avenue in Dubuque, Iowa. 1. First Floor - Conversion of the space to the Multicultural Family Center. - Selective demolition - Addition of a sprinkler system. - Addition of a stairwell and elevator to all levels. - Work in these areas will include wood studs and gypsum board, new finishes, a fireplace, ADA required improvements, new furnishings and new HVAC/electrical systems. - A portion of salvaged materials from the Roshek Building will be re-used, including some bathroom fixtures and accessories, and ceiling tile. 2. Basement - Selective demolition. - Addition of a sprinkler system. - Work will include partial renovation to include stairwell and elevator, new mechanical and electrical spaces. 3. Second Floor - No work will occur at this time. Other Miscellaneous exterior work will include masonry tuckpointing and reworking the existing storefront to include a new entry. The existing roof materials will be removed and replaced on the high and low roofs with new insulation and a single ply membrane. Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the day of , 2009. Jeanne F. Schneider, CMC, City Clerk NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT KEPHART BUILDING IMPROVEMENT PROJECT Time and Place for Filing Sealed Proposals. Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 ~.m. on March 31, 2009, in the Office of the City Clerk, City Hall -First Floor, 50 West 13t Street, Dubuque, Iowa. Time and Placed Sealed Proposals Will be Opened and Considered. Sealed proposals will be opened and bids tabulated at 2:00 p.m. on March 31, 2009, at City Hall -Conference Room A, 50 West 13t" Street, Dubuque, Iowa, for consideration by the City Council (Council) at its meeting on April 6, 2009. The City of Dubuque, Iowa, reserves the right to reject any and all bids. Time for Commencement and Completion of Work. Work on each improvement shall be commenced within 10 days after the Notice to Proceed has been issued and shall be fully completed by July 24, 2009. Bid Security. Each bidder shall accompany its bid with a bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be in the amount of ten percent (10%) of the amount of the contract and shall be in the form of a cashier's check or certified check drawn on astate-chartered or federally chartered bank, or a certified share draft drawn on astate-chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satisfactory to the governmental entity. The bid bond shall contain no conditions excepted as provided in this section. Contract Documents. Copies of the contract documents may be obtained by contractors at Tri-State Blueprint & Framing Company, 696 Central Avenue, Dubuque, Iowa 52001 (Voice: 563.556.3030). A plan deposit of $50.00 per set of construction documents is required. Deposits will be refunded upon return of the construction documents in good condition within ten (10) days after bid opening. Preference for Iowa Products and Labor. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. General Nature of Public Improvement. Kephart Building Improvement Project CI P: 3601976/2601976/1011976 In general, the project consists of a remodel to the first floor and basement of the former Kephart Music Building, located at 1157 Central Avenue in Dubuque, Iowa. 1. First Floor - Conversion of the space to the Multicultural Family Center. - Selective demolition - Addition of a sprinkler system. - Addition of a stairwell and elevator to all levels. - Work in these areas will include wood studs and gypsum board, new finishes, a fireplace, ADA required improvements, new furnishings and new HVAC/electrical systems. - A portion of salvaged materials from the Roshek Building will be re-used, including some bathroom fixtures and accessories, and ceiling tile. 2. Basement - Selective demolition. - Addition of a sprinkler system. - Work will include partial renovation to include stairwell and elevator, new mechanical and electrical spaces. 3. Second Floor - No work will occur at this time. Other Miscellaneous exterior work will include masonry tuckpointing and reworking the existing storefront to include a new entry. The existing roof materials will be removed and replaced on the high and low roofs with new insulation and a single ply membrane. Pre-Bid Construction Conference. Each prospective bidder is encouraged to attend the Pre-Bid Construction Conference to be held at 10 AM on March 19, 2009, at the Kephart Building, 1157 Central Avenue in Dubuque, Iowa. Attendance by all prospective bidders is not mandatory but highly recommended. Published in the Telegraph Herald, March 6, 2009.