Loading...
Resolution FY 2010 Building Permit FeesTHE CITY OF DUBUQUE Masterpiece on the Mississippi Dubuque All-American City 2007 March 3, 2009 TO: Michael C. Van Milligen, City Manager FROM: Rich Russell, Building Services Manager SUBJECT: Permit Fee Revisions INTRODUCTION The purpose of this memorandum is to submit to you a copy of one proposed resolution for your review and approval. This resolution would revise City of Dubuque permits fees. DISCUSSION These proposed changes will allow the Building Services Department to meet the budget recommendations for revenue. The fees are increased an average of 15%. This increase is the second of two planned for the replacement of the licensing revenue. RECOMMENDATION I recommend adoption of the attached resolution and that the changes be effective July 1, 2009. cc: Jenny Larson, Budget Director Preparers Rich Russell, Building Dept., 50 W. 13t" St., Dubuque, IA 52001, 563-589-4150 RESOLUTION NO. 92-2009 (92-09) RESOLUTION APPROVING AN INCREASE IN BUILDING PERMITS FEES Whereas, due to the loss of licensing revenue and requirement to meet aself- support target for the Building Department code enforcement activity, an increase in the building, mechanical, plumbing and electrical permit fees has been proposed for the Fiscal Year 2010 operating budget. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the building permit fees for one and two-family dwellings and related projects be established as follows: For projects between $1 and $500: $13.25 For projects between $501 and $2000: $13.25 for the first $500 plus $2.15 per additional $100, For projects between $2001 and $30,000: $45.50 for the first $2000 plus $8.50 per additional $1000, For projects between $30,001 and $50,000: $283.50 .for the first $30,000 plus $6.35 per additional $1000, For projects between $50,001 and $100,000: $410.50 for the first $50,000 plus $4.25 per additional $1000, For projects $100,001 and above: $623.00 plus $3.55 for each additional $1000 thereafter. In addition to the building permit fee, plan review fees, when plans are required, shall be assessed at the rate of $52.00 per hour of review time, with a minimum one-hour charge. An issuance fee ®f $5.00 will als® be charged. Section 2. That the building permit fees for all other building projects be established as follows: For projects between $1 and $500: $26.50 For projects between $501 and $2000: $26.50 for the first $500 plus $13.25 per additional $500, For projects between $2001 and $25,000: $66.25 for the first $2000 plus $10.60 per additional $1000, For projects between $25,001 and $50,000: $310.05 for the first $25,000 plus $7.95 per additional $1000, For projects between $50,001 and $100,000: $508.80 for the first $50,000 plus $5.30 per additional $1000, For projects between $100,001 and $500,000: $773.80 plus $43.65 for each additional $10,000, For projects over $500,001: $2519.80 for the first $500,000, plus $35.70 for each additional $10,000 thereafter. In addition to the building permit fee, plan review fees, when plans are required, shall be assessed at the rate of $52.00 per hour of review time, with a minimum one-hour charge. An issuance fee of $5.00 will also be charged. Section 3. That the mechanical permit fees be established as follows: Unit Fee Forced Air System (to include $16.00 100,000Btu Forced Air System (over $19.50 100,000Btu Floor Furnace, Wall Heater $16.00 includin vent Unit Heater, Han in Heaters $16.00 A pliance vent $14.00 Alteration, addition to any $16.00 s stem Boilers, Compressors: up to & include 3Hp or $16.00 100,000Btu >3Hp to 15 Hp, or 100,000 to $29.00 500,000Btu >15Hp to 30 Hp, or 500,000 to $39.00 1,000,OOOBtu >30 Hp to 50Hp, or 1,000,000 $60.00 to 1,750,000Btu >50 H , or>1,750,000Btu $99.00 Air Handling Unit (CFM to $11.50 10,000 Air Handling Unit (CFM $19.50 >10,000 Evaporative cooler (not $11.50 portable Vent Fan, (single duct exempt $8.00 in residential Hood w/mechanical exhaust $11.50 exempt in residential Commercial or Industrial $79.00 Incinerator Fuel Gas pipin 1 to 5 outlets $14.00 Fuel Gas piping (>5 outlets, $3.50 $3.00 er outlet Air Condition Unit Hp each $16.00 Water Heater Btu each $11.50 Woodburnin Stove $11.50 Facto Built Fire lace $11.50 Refri eration Unit Hp each $16.00 All other appliances or $11.50 equipment including Temporary heat An issuance fee of $10 will be applied to all permits. Section 4. That the plumbing permit fees be established as follows: Fixture Fee Water Closet (Toilet) $ 8.00 Bathtub $ 8.00 Lavatory (Wash Basin) $ 8.00 Shower $ 8.00 Kitchen Sink $ 8.00 Garbage Disposal $ 8.00 Dishwasher $ 8.00 Laundry Tray $ 8.00 Clothes Washer $ 8.00 Urinal $ 8.00 Drinking Fountain $ 8.00 Service Sink $ 8.00 Shampoo Bowl $ 8.00 Grease Trap $ 8.00 Water Heater $11.50 Gas Piping (1 to 5 outlets) ENTER 1 $14.00 Gas Piping (> 5 outlets, $3.00 per add'I. outlet) $ 3.50 Floor Drain $ 8.00 Roof Drain $11.50 Condensate Drain $11.50 Vacuum Breaker $11.50 Backwater Valve $14.00 Backflow Prevention Device $14.00 Waste Interceptor $14.00 Indirect Waste $14.00 Sewage Ejector $14.00 Water Distribution Piping $14.00 Water Treating Equipment $14.00 Water Service (Main to Property line) $14.00 Water Service (Property line to Building) $14.00 Sanitary Service (Main to Property line) $14.00 Sanitary Service (Property line to Building) $14.00 Misc. $14.00 An issuance fee of $10 will be applied to all permits. Section 5. That the electrical permit fees be established as follows: CITY OF DUBUQUE ELECTRICAL PERMIT FEE SCHEDULE S uare Foota a Fees for New Buildin s S . Ft. Fee First 25,000 s . ft. 0.07 Next 49,999 s . ft. 0.06 New Commercial Office Construction Next 124,999 s . ft. 0.045 Next 299,999 s . ft. 0.03 Over 500,000 s . ft. 0.015 First 25,000 s . ft. 0.03 Next 49,999 s . ft. 0.015 New Commercial Industrial Construction Next 124,999 s . ft. 0.007 Next 299,999 s . ft. 0.0045 Over 500,000 s . ft. 0.001 New Residential Construction (finished living space) Note: for unfinished s aces or outside see the a ro riate unit fees listed below 0.06 Unit Fees for Existin Buildin Remodels or Additions Unit Fee First Transformer $10.50 Signs Additional Transformers $6.00 Gasoline Pum s or Dis ensers $10.00 Swimmin Pool, S a, Hot Tub, Whirl ool $33.00 Tem ora Power & Construction Site Services $19.50 Tem ora Li htin S stems $19.50 Receptacle, switch and ceiling boxes, First 1 thru 20 $0.70 and all other enclosures Number Over 20 $0.30 First 1 thru 20 $0.70 Lighting Fixtures Number Over 20 $0.30 Pole or Platform Fixtures $1.30 Theatrical Li htin Fixtures $1.30 0 to 1 $7.00 Residential and Commercial Over 1 to 10 $8.00 Appliances and Power Apparatus Over 10 to 20 $10.50 (rated in) Tons of BTU, or Kilowatts, or KVAR H Over 20 to 30 $14.00 orsepower KVA, or , or Over 30 $14.00 +.30 er total HP Buswa 100 ft. sections or fraction there of. at $0.70 er foot 0 to 100 Am s $10.00 101 to 400 Am s $16.00 Main Services and/or Sub Panels 401 to 600 Am s $24.00 601 to 1000 Am s $32.00 Over 1000 Am s or over 600 Volts $49.50 Misc. a aratus, conduit, or conductors not covered elsewhere $19.50 Ori final Issuance Fee $10.00 Su lemental Issuance Fee $5.00 no on final ermit can be less than $20.00 no su lemental ermit can be less than $15.00 The Investi ation Penalt Fee, if a licable, is twice the TOTAL Permit Fee Misc. fees that are not covered elsewhere but ma be char ed For each noncom liance reins ection that is needed $ 52.00 each For construction Ian review minimum of one hour $ 52.00 er hour Ins ections outside normal business hours $ 52.00 er hour Ins ection for which no fee is detailed above resale, demolition, dams e, etc $ 52.00 er hour These fees will become effective u on ublication of the resolution. Section 6. That these increases become effective upon publication. Passed, approved and adopted this 9th day of March, 2009. Roy D. Buol Mayor Attest: Jeanne F. Schneider, City Clerk