Port of Dubuque Outdoor Plaza Phase I ProjectTHE CITY OF Dubuque Ap DUB E 1 I Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Port of Dubuque Outdoor Plaza -Phase I CIP3601855 DATE: March 9, 2009 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Port of Dubuque Outdoor Plaza Project - Phase I as completed by Nauman Nursery in the final contract amount of $334,025.16, which is an 18% increase from the original contract of $283,000. Coordination with the simultaneous construction of the McGraw-Hill Parking Lot resulted in the need for the following extra work: additional brick pavers at the front entrance to the building; and additional mulch for landscaping. The City's contractor also provided sod placement for McGraw-Hill in the amount of $8,815. The City was directly reimbursed by McGraw-Hill for this work. The second area of extra work involved the necessary addition of a small equipment building to house gate control telecommunication equipment and electrical service panels for the parking lot lighting. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:Iw Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer 1 Dubuque THE CTTY OF T_.~T~R Al AIt~aCIIY ~V L MQSteY~'IIeCe On tj1E MiSSISSi~J~'ll 2007 TO: Michael C. Van Milligen, City Mana e FROM: Gus Psihoyos, City Engineer _. SUBJECT: Port of Dubuque Outdoor Plaza -Phase I CIP 3601855 DATE: March 5, 2009 INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Port of Dubuque Outdoor Plaza Project -Phase I. BACKGROUND The Port of Dubuque Outdoor Plaza Project - Phase I included: - An approximate 45- by 30-foot public outdoor plaza area between the Bell Street sidewalk and the front entrance to the office building for McGraw-Hill Companies. - An approximate 100- by 40-foot greenspace park area between the 5th Street sidewalk and the McGraw-Hill Companies building. As part of the development agreement with McGraw-Hill, the City of Dubuque was also responsible for the design and construction of a gated control system for the 513-space parking lot constructed by McGraw-Hill Companies for its employees. The parking lot is used as a festival site for the Port of Dubuque, with electric and water services sufficient to support these events. DISCUSSION The Port of Dubuque Outdoor Plaza Project - Phase I was completed by Nauman Nursery of Dubuque, Iowa, in the final contract amount of $334,025.16, which is a 18.0% increase from the original contract amount of $283,000. Coordination with the simultaneous construction of the McGraw-Hill Parking Lot resulted in the need for the following extra work: additional brick pavers at the front entrance to the building; and additional mulch for landscaping. The City's contractor also provided sod placement for McGraw-Hill in the amount of $8,815. The City was directly reimbursed by McGraw-Hill for this work. The second area of extra work involved the necessary addition of a small equipment building to house gate control telecommunication equipment and electrical service panels for the parking lot lighting. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $334,025.16. BUDGET IMPACT The project cost summary for the Port of Dubuque Outdoor Plaza Project - Phase I is as follows: Construction Contract - Construction Contingency (5%) Construction Subtotal CHANGE ORDER #1 CHANGE ORDER #2 (SAVINGS) CHANGE ORDER #3 Total Project Cost Estimate $ 254, 315 12 715. $ 267,030 267 030 297 150 Award $ 283,000 14 150 $ 297,150 Final $283,000.00. 0 $283,000.00 + 73,177.70 - 25,658.54 + 2,912.00 $334,025.16 The Outdoor Plaza work also included several separately-bid construction projects: storm sewer extension; fiber optic conduit installation; water hydrant installation for festivals; parking gate equipment installation; and installation of electrical service panels for festivals. The project funding summary for all phases is as follows: CIP No. Fund Description Fund Amount 3601855 McGraw-Hill Land Sale (General) $379,738 7001050 Ice Harbor/Port of Dubuque Utilities 136,393 7001521 Port of Dubuque Existing Lots 45,945 7001511 Port of Dubuque Fiber Optics 76,166 7301958 Parking Construction Fund (Cash Balance) 200,000 7001052 Conference Center -Savings 102,455 McGraw-Hill Sodding Reimbursement 8,815 City-Wide CIP Savings 118,000 Available Total Project Funding $1,067,512 r The Port of Dubuque Outdoor Plaza Project - Phase I was funded with monies from McGraw-Hill Land Sale (General) (CIP 3601855) in the amount of $344,025.16. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $334,025.16 to Nauman Nursery for the Port of Dubuque Outdoor Plaza Project -Phase I. Prepared by Steven Sampson Brown, Project Manager cc: Cindy Steinhauser, Assistant City Manager David Heiar, Economic Development Director Jenny Larson, Budget Director Laura Carstens, Planning Services Manager Gil Spence, Leisure Services Manager Bob Fritsch, Park Division Manager Tim Horsfield, Parking System Supervisor Kyle Kritz, Associate Planner RESOLUTION NO. 98-09 ACCEPTING THE PORT OF DUBUQUE OUTDOOR PLAZA PROJECT - PHASE I AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Port of Dubuque Outdoor Plaza Project - Phase I (the Project) has been completed and the City. Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the McGraw-Hill Land Sale (General) (CIP 3601855) appropriation for the contract amount of $334,025.16 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 16th day of ?'arch /; 2009. ~~1 /~ ~/ ;` Roy D. Buol, Mayor Att ~t: eanne F. Schneider, CMC, City Clerk CITY ENIN ER's CERTIFICATE ®F FINAL C®fV1PLETl®N F THE P®RT ®F ®lJEl1Ql1E ®l1T®®®R PLAZA PR®JECT - PFIA~ I The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Port of Dubuque Outdoor Plaza Project -Phase I, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $334,025.16. Dated this 16th day of rlarch , 2009. :} ~~ City Engineer Filed in the office of the City Clerk on the 16th day of March ~~ 2009. - - Kevin So F rnstahlg Assistant City Clerk APPLICATION AND CERTIFICATE FOR PAYMENT colvsTRUCTION MANAGER-ADVISER EDITION AIA DOCUMENT G702/CMa PAGE 1 OF 2 PAGES TO OWNER: City of Dubuque PROJECT: POD -Outdoor Plaza APPLICATION NO.: 5 Distribution to: 50 West 13th St. Dubuque, IA PERIOD TO: 1.31.08 OWNER Dubuque,lA 52001 FROM CONTRACTOR: Nauman Nursery, Inc. ........... 100.00 ........... 333, 925.16 4101 Pennsuylvania Ave CONTRACT DAT 5.16.07 ARCHITECT Dubuque,lowa 52002 CONTRACTOR CONTRACT FOR: Material & Equipment Phase 1 Vi a Architect: The Durrant Group Inc. e un erslgne ontractor certl lest at to t e est o t e ontracto s now a ge, In or- Application is made for payment, as shown below, in connection with the Contract. mation and belief the Work covered by this Application for Payment has been completed Continuation Sheet AIA Document G703, is attached. ~ in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and pay- 1.ORIGINAL CONTRACT SUM ............ ........... 283,000.00 ments received from the Owner, and that current payment shown herein is now due. 2. Net Change by Change Orders ......................... ........... 51,025.16 CONT O . 3. CONTRACT SUM TO DATE . ............ (LINE 1 +2),,., 334,025.16 B Date: ~~ O~ 4. TOTAL COMPLETED AND STORED TO DATE ........... 334,025.16 S t o (Column G on G702) County of: 5. RETAINAGE: Subscribed and sworn to before a.0 % of Completed Work ..... ............ 100.00 me this day of (Columns D + E on G703) b. 0 % of Stored Material ..................... n nn (Columns F on G703) Total Retainage (Line 5a + 5b or Total in Column I of G703) .......... . TOTAL EARNED LESS RETAINAGE ....... . (Line 4 less line 5 Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYM ........... 333,925.16 (Line 6 from prion Certificate) 8. CURRENT PAYMENT DUE .. ............ ........... 100.00 9. BALANCE TO FINISH, INCLUDING RETAINA( .......... . (Line 3 less Line 6) CHANGE ORDER SUMMARY ADDITIONS EDUCTIONS Total changes approved in previous months b Owner 73,771.70 (25,658.54) Total a proved this Month 2,912.00 TOTAL ~ 76,683.70 (25,658.54) NET CHANGES b Chan a Ord 76,683.70 51,025.16 PROJECT NO.: 07001.00 CONSTRUCTION MANAGER Notary Public: My Commission expires: CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-site observations and the data comprising this application, the Construction Manager and Architect certify to the Owner that to the best of their knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor in entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED ................... $ ~ ~~ 0.00 (Attach explanation if amount certified differs from the amount applied for. Initial all figures on this application and on the Continuation Sheet that changed to conform to the amount certified.) CONSTRUCT M AG B ~ Date: l 2/ ~~ ARCHITECT: B ~ ~ Date: ~ Q This Certificate is not negotia le. The AMOUNT CERTIFIED is payable onl to the Con- tractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this contract. APPLICATION AND CERTIFICATE FOR PAYMENT colvsTRUCrION MANAGER-ADVISER EDITION AIA DOCUMENT G702/CMa PAGE 1 OF 2 PAGES TO OWNER: City of Dubuque PROJECT: POD -Outdoor Plaza APPLICATION NO.: 5 Distribution to: 50 West 13th St. Dubuque, IA PERIOD TO: 1.31.08 OWNER Dubuque,lA 52001 FROM CONTRACTOR: Nauman Nursery, Inc. 4101 Pennsuylvania Ave Dubuque, Iowa 52002 CONTRACT FOR: Material & Equipment Phase 1 PROJECT NO.: 07001.00 CONSTRUCTION MANAGER CONTRACT DAT 5.16.07 ARCHITECT CONTRACTOR Via Architect: The Durrant Group Inc. ~~ ~~ ~~C~ siynea ~.onrractor cernnes tnat to the best of the Contractor's knowle g~ e; m o mation and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and pay- ments received from the Owner, and that current payment shown herein is now due. CONT O . B ~ Date: ~O(~ l p~ S t o: - County of: Subscribed and sworn to before me this day of Application is made for payment, as shown below, in connection with the Contract. Continuation Sheet AIA Document G703, is attached. 1. ORIGINAL CONTRACT SUM ............ ........... 283,000.00 2. Net Change by Change Orders ......................... ........... 51,025.16 3. CONTRACT SUM TO DATE . .. (LINE 1 +2),,,, 334,025.16 ....... 4. TOTAL COMPLETED AND STORED TO DATE ........... 334,025.16 (Column G on G702) 5. RETAINAGE: a.0 % of Completed Work ..... ............ 100.00 (Columns D + E on G703) b. 0 % of Stored Material ..................... 0.00 (Columns F on G703) Total Retainage (Line 5a + 5b or Total in Column I of G703) ........... ........... 100.00 6. TOTAL EARNED LESS RETAINAGE ................... 333,925.16 (Line 4 less Line 5 Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYM ........... 333,925.16 (Line 6 from prion Certificate) Notary Public: My Commission expires: CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-site observations and the data comprising this application, the Construction Manager and Architect certify to the Owner that to the best of their knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor in entitled to payment of the AMOUNT CERTIFIED. 8. CURRENT PAYMENT DUE .. ............ ........... 100.00 AMOUNT CERTIFIED ................... $ ~~---~ 9. BALANCE TO FINISH, INCLUDING RETAINAC ........... 0.00 (Attach explanation if amount certified differs from the amount applied for. Initial (Line 3 less Line 6) all figures on this application and on the Continuation Sheet that changed to conform CHANGE ORDER SUMMARY ADDITIONS EDUCTION Total changes approved in revious months by Owner Total approved this Month 73,771.70 2,912.00 (25,658.54) TOTAL 76,683.70 (25,658.54) NET CHANGES b Chan a Ord 76,683.70 51,025.16 to the amount certified.) S CONSTRU AG B ' Date: ~ Z( rJ ARCHITECT: B ' ~ Date: ~ Q ~ . This Certificate is not negotia le. The AMOUNT CERTIFIED is payable onl to the Con- tractor named herein. Issuance payment and acce to f p nce o payment are without prejudice to any rights of the Owner or Contractor under this contract. APPLICATION AND CERTIFICATE FOR PAYMENT colvsTRUCTION MANAGER-ADVISER EDITION AIA DOCUMENT G702/CMa PAGE 1 OF 2 PAGES TO OWNER: City of Dubuque PROJECT: POD -Outdoor Plaza APPLICATION NO.: 5 Distribution to: 50 West 13th St. Dubuque, IA PERIOD TO: 1.31.08 OWNER Dubuque, IA 52001 PROJECT NO.: 07001.00 CONSTRUCTION FROM CONTRACTOR: Nauman Nursery, Inc. 4101 Pennsuylvania Avg Dubuque, Iowa 52002 CONTRACT FOR: Material & Equipment Phase 1 CONTRACT DAT 5.16.07 Via Architect: The Durrant Group Inc. MANAGER ARCHITECT CONTRACTOR Application is made for payment, as shown below, in connection with the Contract. Continuation Sheet AIA Document G703, is attached. 1. ORIGINAL CONTRACT SUM ............ ........... 283,000.00 2. Net Change by Change Orders ......................... ........... 51,025.16 3. CONTRACT SUM TO DATE . ............ (LINE 1 +2),.,. 334,025.16 4. TOTAL COMPLETED AND STORED TO DATE ........... 334,025.16 (Column G on G702) 5. RETAINAGE: a.0 % of Completed Work ..... ............ 100.00 (Columns D + E on G703) b. 0 % of Stored Material ..................... 0.00 (Columns F on G703) Total Retainage (Line 5a + 5b or Total in Column I of G703) ........... ........... 100.00 6. TOTAL EARNED LESS RETAINAGE ................... 333,925.16 (Line 4 less Line 5 Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYM ........... 333,925.16 (Line 6 from prion Certificate) 8. CURRENT PAYMENT DUE .. ............ ........... 100.00 mation and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and pay- ments received from the Owner, and that current payment shown herein is now due. CONT O . B ~ Date: ~~ O`~ S o: County of: Subscribed and sworn to before me this day of Notary Public: My Commission expires: CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-site observations and the data comprising this application, the Construction Manager and Architect certify to the Owner that to the best of their knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Cohtractor in entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED ................... $ ~~-~' 9. BALANCE TO FINISH, INCLUDING RETAINAC ........... 0.00 (Attach explanation if amount certified differs from the amount applied for. Initial (Line 3 less Line 6) all figures on this application and on the Continuation Sheet that changed to conform CHANGE ORDER SUMMARY ADDITIONS EDUCTION Total changes approved in previous months b Owner 73,771.70 25,658.54 Total a roved this Month 2,912.00 TOTAL ~ 76,683.70 25,658.54 NET CHANGES by Chan a Ord 76,683.70 51,025.16 to the amount certified.) S CONSTRUC GE B ~ Date: /~ Z/ D~ ARCHITECT: B ~ ~ Date: ~ 0 This Certificate is not negotia le. The AMOUNT CERTIFIED is payable onl to the Con- tractor named herein. Issuance payment and acceptance of a ment ar 'th t p y e wi ou prejudice to any rights of the Owner or Contractor under this contract.