IDOT - Local Detour Agrement for SW Arterial, Hwy 20 Overpass Copyrighted December 18, 2017 City of Dubuque Consent Items # 18. ITEM TITLE: lowa Department of Transportation - Local Detour Agreement for Southwest Arterial Interchange Bridge Over US Highway 20 SUMMARY: City Manager recommending authorization for the Mayor to execute an agreement with the lowa Department of Transportation for the use of local roads as an authorized detour route for the Southwest Arterial Overpass Interchange Bridge Over US Highway20 Project. RESOLUTION Approving the lowa Department of Transportation Agreement for use of local agency roads as detours for the Southwest Arterial Overpass Bridge over US Highway 20 SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type Southwest Arterial Overpass Bridge Over US Highway City Manager Memo 20-NNM Memo Staff Memo Staff Memo Resolution Resolutions Local Detour Agreement Supporting Documentation Detour Sheets Highlighted Supporting Documentation THE CITY OF Dubuque � AIFA�erlwGh UB E '�� III► Masterpiece on the Mississippi Z°°'�w'2 7A13 2017 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Southwest Arterial Overpass Bridge Over US Highway 20 lowa Department of Transportation — Local Road Detour Agreement lowa DOT Project No. NHSX-032-1(42)-3H-31 DATE: December 13, 2017 Assistant City Engineer Robert Schiesl recommends City Council authorization for the Mayor to execute an agreement with the lowa Department of Transportation for the use of local roads as an authorized detour route for the Southwest Arterial Overpass Interchange Bridge Over US Highway 20 Project. I concur with the recommendation and respectfully request Mayor and City Council approval. �� �� ��� Mic ael C. Van Milligen �� � MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Robert Schiesl, Assistant City Engineer THE CTTY OF Dubuque �" ui��oeee�qry DUB E 'il��i;' Masterpiece on the Mississippi Z°°' Z°'Z 2013 2017 TO: Michael C. VanMilligen Gus Psihoyos, City Engineer FROM: Robert Schiesl, Assistant City Engineer SUBJECT: Southwest Arterial Overpass Bridge Over US Highway 20 lowa Department of Transportation - Local Road Detour Agreement lowa DOT Project No. NHSX-032-1(42)--3H-31 DATE: December 13, 2017 INTRODUCTION The enclosed resolution authorizes the Mayor to execute an agreement with the lowa Department of Transportation (lowa DOT) for the use of local roads as an authorized detour route for the Southwest Arterial Overpass Interchange Bridge Over US Highway 20 Project. BACKGROUND The Southwest Arterial Overpass Interchange Bridge Over US Highway 20 bids on December 19, 2017 in Ames. Work on the overpass bridge is anticipated to begin in March /April 2018 and is required to be completed by June 28, 2019. During times of the overpass bridge construction, when the contractor installs the overhead bridge beams and the architectural truss members, the eastbound lanes of US Highway 20 will need to be closed. During the short duration highway closure, eastbound US 20 traffic will be detoured onto North Cascade Road. Westbound US 20 traffic will be detoured onto the westbound interchange ramp. The project will require the contractor to work nights (10 PM to 5 AM) to complete the placement of the overhead bridge beams and the architectural truss members. The nighttime closure of the eastbound lanes of US 20 and the detour onto North Cascade Road will only be allowed during non-peak (10 PM to 5 AM) hours, Sunday night through Friday morning. All other bridge construction operations will occur during normal working hours and US Highway 20 traffic will remain open to 4-lane traffic at all times. RECOMMENDATION I recommend that the City Council authorize the Mayor to execute an agreement with the lowa Department of Transportation for the use of local roads as an authorized detour route for the Southwest Arterial Overpass Interchange Bridge Over US Highway 20 Project. ACTION TO BE TAKEN The City Council is requested to authorize the Mayor to execute an agreement with the lowa Department of Transportation for the use of local roads as an authorized detour route for the Southwest Arterial Overpass Interchange Bridge Over US Highway 20 Project through the adoption of the enclosed resolution. Prepared by Robert Schiesl, Assistant City Engineer cc: John Klostermann, Public Works Director Jim Schnoebelen, lowa DOT Roger Walton, lowa DOT F:\PROJECTS\SOUTHWEST ARTERIAL\Interchange- US20 SWA Bridge (42)\Detour Agreement RESOLUTION NO. 388-17 RESOLUTION APPROVING THE IOWA DEPARTMENT OF TRANSPORTATION AGREEMENT FOR USE OF LOCAL AGENCY ROADS AS DETOURS FOR THE SOUTHWEST ARTERIAL OVERPASS BRIDGE OVER US HIGHWAY 20 Whereas, the Iowa Department of Transportation is proceeding with the Southwest Arterial Overpass Bridge Over US Highway 20; and Whereas, eastbound lanes of US Highway 20 may be closed from 10:00 pm until 5:00 am with North Cascade Road serving as a detour route for eastbound traffic; and Whereas, nighttime closures of US 20 will only be allowed during non -peak hours, Sunday night through Friday morning. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That said Agreement for Use of Local Agency Roads with the Iowa Department of Transportation is hereby approved for the Southwest Arterial Overpass Bridge Over US Highway 20. Section 2. That the Mayor be authorized and directed to execute two copies of said Agreement for Use of Local Agency Roads with the Iowa Department of Transportation for the Southwest Arterial Overpass Bridge Over US Highway 20. Passed, approved and adopted this 18th day of December 2017. Attest: Kevj S. Oirnstih , CMC, City Clerk 04 oy D. Buol, Mayor F:\PROJECTS\SOUTHWEST ARTERIALAInterchange - US20 SWA Bridge (42)\Detour Agreement Form 810012wd 06-14 GOIOWADOT AGREEMENT FOR DOT -INITIATED DETOUR OF PRIMARY HIGHWAYS ONTO LOCAL ROADS This Agreement is entered into by and between the Iowa Department of Transportation, hereinafter known as the Department; and the Dubuque City Council , , hereinafter known as the Local Public Agency (LPA). WHEREAS, the Department has determined the necessity to temporarily close primary highway US 20 (eastbound only) from the intersection of US 20 and Stone Valley Drive to the intersection of US 20 and Cedar Cross Road for the purpose of construction, reconstruction, maintenance, natural disasters, or other emergencies; and WHEREAS, it is necessary to provide a detour for the primary highway closure period; and WHEREAS, the LPA agrees to permit the use of its roads as a detour, more particularly described as follows: The detour starts at the Dubuque County Line, proceeds 0.15 miles on North Cascade Road, proceeds 1.48 miles on Cedar Cross Road, and ending at the intersection of US 20 and Cedar Cross Road ; and WHEREAS, Authorized representatives of both the Department and the LPA shall jointly execute and sign a written report concerning the condition of the proposed detour, after jointly inspecting said road, the subject of the proposed detour; said report to be in sufficient detail as to reasonably reflect the condition of the roadway base, surface, shoulders and bridges; and WHEREAS, the Department will review, and inspect when necessary, the bridges on the detour route and determine the maximum vehicle weight (up to 156,000 pounds) that can be safely carried on these bridges and submit this information to the LPA for its review. The LPA may choose to restrict detour traffic to only vehicles of legal weight or size. If the LPA allows oversize or overweight loads, it shall notify the Department in writing. The Department shall approve the routing of overweight vehicles on the detour route, up to the limits specified by the LPA; and WHEREAS, the Department agrees to perform the following pre -detour maintenance, if any: A pre -detour review was performed on November 7 and no maintenance issues were noted ; and WHEREAS, the Department agrees to maintain the detour and provide all traffic control devices required by the Manual of Uniform Traffic Control Devices (MUTCD), as adopted by the Department pursuant to 761 IAC 130, including the marking of no -passing zones during the period the local agency road(s) and structure(s) are being utilized as a primary road detour; and WHEREAS, Prior to revocation of the detour, the Department shall restore the local agency road to as nearly as possible as good condition as it was prior to its designation as a temporary primary road, or adequately compensate the local agency for excessive traffic upon the local agency road during the period it was used as a temporary primary road, in accordance with Section 313.28 or Section 313.29 of the Iowa Code and Iowa DOT Policy 600.05; and WHEREAS, The detour period is estimated to begin April 1, 2018 WHEREAS, the parties agree to the following additional provisions, if any: and end May 1, 2019 (date) (date) None ; and NOW, THEREFORE, BE IT AGREED that the described road be used as a detour under stipulatio s outlined above. IN WITNESS WHEREOF, The parties hereto have caused this agreement to be executed by pr er officg��r, thereunto duly uthorized as of the dates below indicated. i .i' k Al District Engineer (or designee) Date City representative Iowa Department of Transportation Roy D. Buol, Mayor Printed name and title of city representative 12/18/17 Date County representative Date Printed name and title of county representative 411101NADOT SMARTER 1 SIMPLER 1 CUSTOMER DRIVEN www.iowadot.gov District 6 Office 1 Highway Division 5455 Kirkwood Blvd. SW, Cedar Rapids, IA 52404 Phone: (319) 364-0235 I Fax (319) 364-9614 1 Email: jim.schnoebelen@iowadot.us December 26, 2017 REF: City of Dubuque Detour Agreement Attn: Kevin Firnstahl, Clerk of Court Roy D. Buol, Mayor of Dubuque City Hall - 50 West 13th St. Dubuque, IA 52001 SUBJECT: City of Dubuque Detour Agreement (US20 from the intersection of US20 and Stone Valley Drive to the intersection of US20 and Cedar Cross Drive) Dear Mayor Buol: Attached is your original of the fully executed above -referenced detour agreement between Dubuque County the Iowa Department of Transportation for the above referenced project. Thank you for your cooperation in the processing of this agreement. JRS/hmb Enclosure Sincerely, 9...tgaez, James. R. Schnoebelen, P. E. District 6 Engineer C R3 L ra Form 810012wd 06-14 IOWADOT AGREEMENT FOR DOT -INITIATED DETOUR OF PRIMARY HIGHWAYS ONTO LOCAL ROADS This Agreement is entered into by and between the Iowa Department of Transportation, hereinafter known as the Department; and the Dubuque City Council hereinafter known as the Local Public Agency (LPA). WHEREAS, the Department has determined the necessity to temporarily close primary highway US 20 (eastbound only) from the intersection of US 20 and Stone Valley Drive to the intersection of US 20 and Cedar Cross Road for the purpose of construction, reconstruction, maintenance, natural disasters, or other emergencies; and WHEREAS, it is necessary to provide a detour for the primary highway closure period; and WHEREAS, the LPA agrees to permit the use of its roads as a detour, more particularly described as follows: coPporuH r tort}S o`r AIortya ctns,c e R.o�a1 The detour starts at the Dubuque Cie, proceeds 0.15 miles on North Cascade Road, proceeds 1.48 miles on Cedar Cross Road. and ending at the intersection of US 20 and Cedar Cross Road _ -The tde4nt, u4 c iv\ lt„deg 4.27 aw, IrC n.. Oq tiru e CI9 tt teliA PCACAS 4 4 i)+4) c - eu,,A LS 2c c rtinlc_l ; and WHEREAS, Authorized representatives of both the Department and the LPA shall jointly execute and sign a written report concerning the condition of the proposed detour, after jointly inspecting said road, the subject of the proposed detour; said report to be in sufficient detail as to reasonably reflect the condition of the roadway base, surface, shoulders and bridges; and WHEREAS, the Department will review, and inspect when necessary, the bridges on the detour route and determine the maximum vehicle weight (up to 156,000 pounds) that can be safely carried on these bridges and submit this information to the LPA for its review. The LPA may choose to restrict detour traffic to only vehicles of legal weight or size. If the LPA allows oversize or overweight loads, it shall notify the Department in writing. The Department shall approve the routing of overweight vehicles on the detour route, up to the limits specified by the LPA; and WHEREAS, the Department agrees to perform the following pre -detour maintenance, if any: A pre -detour review was performed on November 7 and no maintenance issues were noted ; and WHEREAS, the Department agrees to maintain the detour and provide all traffic control devices required by the Manual of Uniform Traffic Control Devices (MUTCD), as adopted by the Department pursuant to 761 IAC 130, including the marking of no -passing zones during the period the local agency road(s) and structure(s) are being utilized as a primary road detour; and WHEREAS, Prior to revocation of the detour, the Department shall restore the local agency road to as nearly as possible as good condition as it was prior to its designation as a temporary primary road, or adequately compensate the local agency for excessive traffic upon the local agency road during the period it was used as a temporary primary road, in accordance with Section 313.28 or Section 313.29 of the Iowa Code and Iowa DOT Policy 600.05; and WHEREAS, The detour period is estimated to begin April 1, 2018 A i Week Pei -lock wid th $Nn.S lArr a FOo.w+e. (date) WHEREAS, the parties agree to the following additional provisions, if any: None and end May 1, 2019 (date) NOW, THEREFORE, BE IT AGREED that the described road be used as a detour under stipulatiodts outlined above. ; and IN WITNESS WHEREOF, The parties hereto have caused this agreement to be executed by pr,6Ver officers thereunto dulyuthorized as of the dates below indicated. )4u Ar—A • (�(. � - 12-240-2011 / ► �! � 12/18/17 District Engineer (or des' e Date City repre ntative Date Iowa Department of Transportation Roy D. Buol, Mayor Printed name and title of city representative County representative Date Printed name and title of county representative C) 0 z m G) z W-- I— E5 o CD N Z an H N W — J CCI rn CL I CL = 1v7 I I N W 2n W cV CD in _0 O O G7 X DU3UQL E COUNTY LEGEND INTERSTATE HIGHWAY PRIMARY HIGHWAY -DIVIDED PRIMARY HIGHWAY PORTLAND CEMENT CONCRETE ROAD ASPHALT ROAD BITUMINOUS ROAD GRAVEL ROAD EARTHEN ROAD INTERSTATE HIGHWAY UNITED STATES HIGHWAY STATE HIGHWAY COUNTY HIGHWAY RAILROAD PIPELINE AIRPORT HYDROLOGY BRIDGE STATE BOUNDARY COUNTY BOUNDARY CORPORATE BOUNDARY TOWNSHIP LINE SECTION LINE ROAD NAMES UNINCORPORATED PLACE N ABBEY ROAD MMW DESIGN 617 C3I0wAD0T Highway Division PLANS OF PROPOSED IMPROVEMENTS ON THE ENGLISH STANDARD BRIDGE PLANS STANDARD ISSUED REVISED PRIMARY ROAD SYSTEM DUBUQUE COUNTY BRIDGE NEW - PPCB IA 32 (SOUTHWEST ARTERIAL) OVER US 20 AND SOUTH FORK CATFISH CREEK THE IOWA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR HIGHWAY AND BRIDGE CONSTRUCTION, SERIES 2015, PLUS APPLICABLE GENERAL SUPPLEMENTAL SPECIFICATIONS, DEVELOPMENTAL SPECIFICATIONS, SUPPLEMENTAL SPECIFICATIONS AND SPECIAL PROVISIONS SHALL APPLY TO CONSTRUCTION WORK ON THIS PROJECT. DESIGN TEAM WKS & CO. 11/21/2017 1:31:33 PM lu 1 LOCATION MAP PART OF CITY OF DUBUQUE ' PROJECT DIRECTORY NAME: 3103201094 ENGLISH I IOWA DOT Y OFFICE OF BRIDGES AND STRUCTURES L:\Dept\6\7222.1\03 SWA over US20\OGN\31J32042.brg 3106175000 11x17_pdF.pItcfg ®10WA---w �E CALL 1-800-292-8989 www.lowaonecall.com THIS PROJECT IS COVERED BY IOWA DNR FLOOD 11 PLAIN DEVELOPMENT PERMIT NUMBER FP2016-114. 11 REVISIONS CONSTRUCT THIS PROJECT ACCORDING TO THE REQUIREMENTS OF U.S. ARMY CORPS OF ENGINEERS REGIONAL PERMIT NO. 2015-0154. A COPY OF THIS PERMIT 15 AVAILABLE FROM THE IOWA DOT WEBSITE (http://envpermiteJowaaot.gov/CMEPortaIENV/Home.aapx). THE U.S. ARMY CORPS OF ENGINEERS RESERVE THE RIGHT TO VISIT THE SITE WITHOUT PRIOR NOTICE. FILE N0.30467 1 TOTAL SHEETS - LLssJ PROJECT NU BER NHSX-032-1(42)--3H-31 R.O.W. PROJECT NUMBER PROJECT IDENTIFICATION NUMBER 94-31-032-010 N0. INDEX OF SHEETS DESCRIPTION TITLE SHEET 2 2-114 SPS.I-SPS.4 B.I B.I-U.3 1 DESIGN DATA URBAN 2035 AADT 18350 V P 0. TRUCKS 10 SHEET NO. 6 84 99 105 5P5.I B.I APPROVED M MMER ESTIMATE SHEET - DESIGN 617 DESIGN BIT GEOTECHNICAL SHEETS ESTIMATE SHEET FOR ROADWAY ROADWAY SHEETS STANDARD ROAD PLANS STANDARD ROAD PLANS ARE LISTED ON SHEET NUMBER C.2 INDEX OF SEALS NAME JAREMY D. KOTTA BRIAN J.BIRKLAND MICHAEL R.SHIMKUS ERIC IVERSON MICHAEL D. CHAMBERS THERESA STROMBURG-MURPHY ERIC J.TOTT CITY OF DUBUQUE, IOWA TYPE STRUCTURAL DESIGN HYDRAULIC DESIGN STRUCTURAL DESIGN AESTHETIC DESIGN ELECTRICAL DESIGN GEOTECHNICAL ROADWAY 9-15-2017 DATE STRUCTURAL DESIGN 1 hereby certify that this engineering docunent vas prepared by me or under my direct personal supervision and that 1 am a duly licensed Professional Engineer under the laws of the State of Iowa. y- � 5/, SA7 sss���mmm Joremv D. Kotta Meted or Typed Name My license renewal date 1s December 31, 2017 Pages or sheets covered by this seal: SHEETS I THRU 83 Date DUBUQUE COUNTY I PROJECT NUMBER NHSX-032-1(42)--3H-31 (Changed by Addenda 1 SHEET NUMBER 1 -Earth Shoulder Constmcggn T7'V8 •� mP 1 YP. Paved Shoulder/ - Construcllon Sebdraln For Bridge Approach Pavement details refer to Standard Road Plan BR -201 1.� 0 +-2% OA PROFILE GRADE ! 2%--r LOCATION ROAD IDENTIFICATION STATION TO STATION For Bridge Approach Pavement details refer to Standard Road Plan BR -231 and the U Sheets QSWA OA. 73+88.73 GSWA OA 74+65.00 (TTP.) m Granular Subbase 0 Feet Feet P.C. Concrete Pavement Granular Subbase Special Backlit] b_ NHSX-032-1(38)-314-31 Contractor SW ARTERIAL TYPICAL CROSS SECTION FOR PAVING -2 LANE DIVIDED ROADWAY WITH MEDIAN 74+85.00 I - 12 75+85.50(1 �11 2.5 12 5.58' 0 Bddge Omission Ste 75+85.5010 Ste 82+44.50 12 12 WBSWA 160 PRd LE GRADE we (Ti -.2 -"Granular 1 Pavement Sub rale Earth Shou der Finishing 2.5 DIMENSIONS Mi Feel Feel Feet Feel 12 12 12 12 12 12 ROFILE G 1 • E • y C OFFICE ALIGNMENT (OA.) EB SWA 4 PROFILE GRADE EB) 21.--. 1 `q .4 Grading By NHSX-032-1(38)-3H-31 Contractor 0 Inches .—z Granular Subbase Special Backfill by NHSX.032-1(38)-3H-31 Grading By Contractor NHSX-032.1(38)314-31 Contractor P.C. Concrete Pavement Subdraln Earth Shoulder Finishing SW ARTERIAL TYPICAL CROSS SECTION FOR PAVING - 2 LANE DIVIDED ROADWAY WITH MEDIAN LOCATION DIMENSIONS I ROAD IDENTIFICATION STATION TO STATION © I ® 1 I ® I O 1 O Feet Feet Feet Feet Inches Inches 'XSTMuud I 508 SWA 182+44.50 183+50.42 113 & Vadee I Varies 1075 to 13.75 6 10 1 I WEST BOUND WB SWA 282+44.50 283+50.57 ENGLISHI IOWA 20T I DESIGN TEAM WHKS & CO. 8:15:00 AM 11/17/20x7 etott K:\7222 SW Arte rlal\3103201094\!Design \_142)_8 ridge \31032042001.s t DUBUQUE 12 (TTP.) Inches 6 -Earth Shoulder Construction Recreational Trail (Future) 10P.) P.' I .pr4.5' fY 2Y.—.. 3 Paved Construction Normal sections shown maybe appropriately modified for areas specifically dIntersections orauperelevated curves. Curb Type MEDIAN Sea PV -102 TYPE Flush 6" Standard Curb and Gutter Raised Nonnal ms shown for areas specifically d signated by the Engineer such Intersections or superelevated curves. ,pFFSSIOpq! a; TOTT 19992 a Se..... .. I 10 .. *`��``` 6 1 rrI n1 COUIMI I I PROJECT NUMBER NHSX-032-1(42)--3H-31 (Changed by Addenda 12 Lane Divided PAVING w/ Median WHKS1 O Median paving & granular subbase under median paving to be constructed by others. 1 2 Lane Split PAVING w/ Median WHKS 2 0 6' Standard Curb (PV -102) ® 0A Raffle Grade and Dimensions Shown Apply Only at Baseline SSR 0.A. Sta. 82+41.50 03 Median paving & granular subbase under median paving to he constructed by others. 1 hereby certify that thie engineering document was prepared by me or under my direct perecral supervision and that I am a duly licensed Profeeelond Engineer WOOF the lege-o4.f11e State of Iowa. 7 (s 11/17/2017 Erle . Taff. PE. Date License Number 19992 Ny Ilcenae renewd dote le December 3L 2011 Pages or sheat. covered by thle seals SHEETS L.I-L.7. M.IM.4. I 'FEET NUMBER B. 1 J Route Direction No Travel Restrictions Expected County Location Description 511 TRAVEL RESTRICTIONS Feature Crossed Object Type Maint. Bridge No., Type of Structure ID, or FHWA No. Restriction 108-231 08-01-08 TRAFFIC CONTROL PLAN Refer to Tab. 108-26A for traffic control specifics. Staging to be coordinated with NHSX-020-9(211)30-31 project. Limited closures will be necessary on US 20 for setting of beams and setting of the arches. The Contractor will be allowed to close EB U5 20 for placement of overhead bridge beams as follows: - Short duration up to 20 minutes. - 20 minute closures will be restricted to off-peak travel hours each night between 10:00 pm and 5:00 am utilizing traffic control standard TC -451. - Long duration up to 7 hours. - Long duration closures will be restricted to off-peak travel hours each night between 10:00 pm and 5:00 am and shall use the detour shown on sheet 1.2 - The Contractor shall notify the Engineer at least 2 weeks in advance of the proposed closure; the Engineer has final approval of proposed time and duration of closure. A11 lanes of US 20 will remain open to traffic at all other times. Nighttime closures will be allowed Sunday nights through Friday morning. From November 15 through April 1, there will be no work within 40 feet of the active traffic lanes, except to install, maintain, and remove traffic signs and devices. ENGLISH I IOWA DOT I DESIGN TEAM LJHKS & Co. 11/13/2017 2:53:30 PPS etott K:\7222 50 Arterle1\3103101094\ue5Ige\_(n2)_Orjdge\310310n3J0 Existing Measurement Construction Measurement Construction Measurement as Signed 108-25 10-21-14 Projected As Built Remarks Measurement STAGING NOTES Staging to he coordinated with NHSX-020-9(211)--311-31 project. While WB US 20 traffic 1s shifted on to ramp detour:' 1. Construct 5WA bridge piers and beams adjacent to WB U5 20 bridge. While EB US 20 traffic is shifted on to the WO U5 20 bridge: 1. Construct SWA bridge piers and beams adjacent to 88 U5 20 bridge. 2. Place center span beams overnight with traffic stopped during placement of each beam. 04-17-12 COORDINATED OPERATIONS Other work in progress during the same period of time will include the construction of the projects listed. Coordinate operations with those of other contractors working within the same area. Project NHSX-032-1(38)--3H-31 NHSX-020-9(210) -3H-31 NHSX-020-9(211)--3H-31 NHSX-020-9(237)--3H-31 ITS -32-1(51)--25-31 MB -000-6(507)0--77-06 Type of Work IGrading PCC Pvement-G Grade and New Bridge New BridgOptiNew Fiber„c Installation_ HMA Resurfacing Dubuque COUNTY PROJECT NUMBER NHSX-032-1(42)--3H-31 (SHEET NUMBER 7,1 Chanaed by Addenda 100-260 08-01-08 NOTE: ALL SPEED LIMIT SIGNS ON NORTH CASCADE ROAD ARE TO BE COVERED AND REPLACED WITH 35 MPH SIGNS. PROPOSED BRIDGE LOCATION O OMESSAGE #3 & 2 CHESTERMAN RD NORTHEAST IOWA COMMUNITY COLLEGE __ ENGLISH I IOWA DOT 7:49:42 AM 11/21/2017 etott MESSAGE #3 & #4 0 3 DESIGN TEAM O MESSAGE #1 & #2 WHKS & CO. K:\7222 SW Arterial\3103201094\Design\_142)_13r1dge\310321)42J02.sht DUBUQUE K OAKLAND FARMS RD COUNTY I PROJECT NUMBER NHSX-032-1( 2)--3H-31 --rL anae v Addenda 0 1290 F1 DETOUR FOR PLACING ARCHES OVER US 20 SHEET NUMBER J.2 0 PORTABLE DYNAMIC MESSAGE SIGN (PDMS) DETOUR STARTS 01/02/18 MESSAGE #1 EB US 20 CLOSED 01/02/18 MESSAGE #3 FOLLOW DETOUR SIGNS MESSAGE#2 OVER NIGHT MESSAGE #4 ROAD CLOSED R11-2 48" X 30" ® I _ _ ENGLISH 1.10.1.110±.022 TEAM WHKS & CO. 7,40:42 AM 11/21/2017 etott K:\7222 SW Arteria I\3I03201094\ Design \-(42)_6r1dge\31032042J02.sht ROAD CLOSED R11-2 48" X 30" rl Ili 1 rJ tryus �:, 09 M4-10 48"x18" DUBUQUE ® W20-2 48" x 48" DETOUR' IMI DETOUR II M4-8 30" x 15" M3-2 36"x18" M1-4 36" x 36" M5-1 30"x21" M4-8 30"x15" M3-2 36" x 18" 20 M1-4 36"x36" M6-1 30"x21" DETOUR EAST I M4-8 30"x15" M3-2 36"x18" 20 M-0 x 36° x 36" )—� M6-3 d�-c�'•�p 30" x 21" DETOUR IIS M4-8 30" x 15" M3-2 36"x18" M1-4 36" x 36" nM6-1 30"x21" COUNTY PROJECT NUMBER W20-2 48" x 48" DETOUR END DETOUR EAST M4-8 30"x15" M3-2 36"x18" M1-4 36"x36" M5-1 30"x21" M4 -8a 24"x18" M3-2 36"x18" M1-4 36" x 36" R1-1 48"x48" With Flashing LED Lights W3-1 48"x48" with Type 'B' High-intensity Flashing Warning Light NHSX-032-1(42)--3H-31 hanged by Addenda SHEET NUd0ER J.3 48" 23.25 78" 31.5" 23.25 TON 91" j1 I VALLEY D P't PE 10.5" 54" 60" 14 5 1:50 PI 14.5' 0 AHEAD 9.8" ! 34.4" 9.8" 2.6" ENGLISH IOWA DOT I DESIGN TEAM WHKS & CO. DUBUQUE 7:49:43 AM 11/21/201 etott K:\7222 SW Aric3103201094\DesigrU42):Eikage\31032042,102.it 48" 60" 13.2" 33.7" 13.2" HEAVY TURNING TRATFI94 43.5" 8.2- [I" 2.5" corrYI PROJECT 090908 NHSX-032-1(42)--3H-31 166anned by Addenda SHEET NUMBER 4.1.4