Loading...
Asphalt Overlay Access Ramp Project Three Acceptance Copyrighted December 18, 2017 City of Dubuque Consent Items # 22. ITEM TITLE: Asphalt OverlayAccess Ramp Project Three Acceptance SUMMARY: City Manager recommending acceptance of the construction contract for the 2017 Asphalt Overlay Access Ramp Project Three as completed by Midwest Concrete, Inc. RESOLUTION Accepting the 2017 Asphalt Overlay Access Ramps Project Three and authorizing the payment of the contract amount to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type 2017 Asphalt Overlay Access Ramp Project Three-NNM City Manager Memo Memo Staff Memo Staff Memo Engineer's Certificate Executed Supporting Documentation Resolution Resolutions THE CITY OF Dubuque � AIFA�erlwGh UB E '�� III► Masterpiece on the Mississippi Z°°'�w'2 7A13 2017 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2017 Asphalt Overlay Access Ramp Project Three (CIP 2501227) (CIP 3001615) DATE: December 12, 2017 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 2017 Asphalt Overlay Access Ramp Project Three, as completed by Midwest Concrete, in the final contract amount of$89,047.25, which was 11 .57°k over the contract amount of$79,815.49. The overage was for extra sidewalk and curb costs associated with the new traffic signal installations at Windsor Avenue and E 22"d Street and for two additional ramps installed at Queen Street and 22"d Street. Sufficient funds have been identified. I concur with the recommendation and respectfully request Mayor and City Council approval. �� �� ��� Mic ael C. Van Milligen �� � MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque � D `J � E Aq•A�c�ki Cit� ll� ��1 Il Masterpiece on the Mississippi x°°''z°1Z xoia•zai7 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer . . SUBJECT: 2017 Asphalt Overlay Access Ramp Project Three (CIP 2501227) (CIP 3001615) DATE: December 11, 2017 INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the 2017 Asphalt Overlay Access Ramp Project Three. BACKGROUND The project replaced twenty-four non-compliant access ramps with thirty-four compliant, directional ramps as per Public Right of Way Accessibilities Guidelines (PROWAG) specifications in conjunction with the Public Works Asphalt Overlay Program and involved the intersections of: • Windsor Avenue and Garfield Avenue, two ramps • Windsor Avenue and Rhomberg Avenue, two double ramps and two single ramps • Windsor Avenue and Lincoln Avenue, two double Ramps and two single ramps • Windsor Avenue and Providence Street four single ramps • Windsor Avenue and E 22nd Street, four double ramps • Windsor Avenue and Regent Street, two single ramps • Windsor Avenue and E 24th Street, two single ramps • E 22�d Street and Queen Street, two single ramps DISCUSSION The 2017 Asphalt Overlay Access Ramp Project Three was completed by Midwest Concrete of Peosta, lowa in the final contract amount of$89,047.25, 11.57% over the contract amaunt of$79,815.15. The overagP was for extra sidewalk and curb costs �associated with the new traffic signal installations at Windsor Avenue and E 22�d Street. Also, two additional ramps were installed at Queen Street and 22nd Street. The average cost per ramp was $2,663.97. BUDGET IMPACT The project cost summary for the 2017 Asphalt Overlay Access Ramp Project Three is as follows: Award Final Construction Contract $79,815.15 $89,047.25 Contingency $7,981.52 $9,232.10 Construction Engineering & Inspection $11,972.27 5 532.77 Total Project Cost 99 768.94 $103,812.12 The funding summary for the project is as follows: CIP Fund Description Fund - Amount 2501227 Curb Ramp Program $100,011.80 3001615 Signal Intersection Reconstruct 3 800.32 Total Project Funding . $103.812.12 REQUESTED ACTION The City Council is requested to adopt the attached resolutions accepting the improvements and establish the final contract amount of$89,047.25 for the 2017 Asphalt Overlay Access Ramp Project Three. Prepared by Tom Kopp, Engineering Technician cc: John Klostermann, Public Works Director Renee Tyler, Asst. Public Works Director Jenny Larson, Budget Director Jon Dienst, Civil Engineer II Paul Davis Public Works Supervisor 2 RESOLUTION NO. 392-17 ACCEPTING THE 2017 ASPHALT OVERLAY ACCESS RAMPS PROJECT THREE AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 2017 Asphalt Overlay Access Ramps Project Three (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Curb Ramp Program appropriations and the signal intersection reconstruct appropriations for the contract amount of $89,047.25, Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest: Passed, approved and adopted this 18th day of December ?17. K in S. Firnstahl, CMC, City Clerk h Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2017 ASPHALT OVERLAY ACCESS RAMPS PROJECT THREE The �re�er�igned Cit;r Engir���r of#h� Ci#;� of �ubuqu�, lo�,��, h�r�by� c�rtifi�� that he has inspected the 2017 Asphalt Overlay Access Ramps Project Three, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $103,812.12. -��---- � �� Dated this��' day of e�-ea�.2017. Gus Psihoyos, City Engine r Filed in the office of the City Clerk on the - day o '''r„��,�� ,��"� . ; 2017. : evin Fir�ista I, CMC, City Clerk -- - — k�