Lower Bee Branch Creek Floating Island Project Acceptance Copyrighted
December 18, 2017
City of Dubuque Consent Items # 24.
ITEM TITLE: Lower Bee Branch Creek Floating Island Project
Acceptance
SUMMARY: City Manager recommending acceptance of the
construction contract for the Lower Bee Branch Creek
Floating Island Project as completed by ENCAP, Inc.
RESOLUTION Accepting the Lower Bee Branch Creek
Floating Island Project and authorizing the payment of the
contract amount to the contractor
SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt
Resolution(s)
ATTACHMENTS:
Description Type
Lower Bee Branch Creek Floating Island Project-NNM City Manager Memo
Memo
Staff Memo Staff Memo
Engineer's Certificate Executed Supporting Documentation
Resolution Resolutions
THE CITY OF Dubuque
�
AIFA�erlwGh
UB E '�� III►
Masterpiece on the Mississippi Z°°'�w'2
7A13 2017
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Lower Bee Branch Creek Floating island Project
CIP# 7201654, Project #4X0003
DATE: December 13, 2017
City Engineer Gus Psihoyos is recommending acceptance of the construction contract
for the Lower Bee Branch Creek Floating Island Project, as completed by ENCAP, Inc.,
in the final contract amount of$176,045, which is 10.67°k under the original contract of
$197,075. The reduced project cost was due to re-configuration of the anchor systems
for each island.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
�� �� ���
Mic ael C. Van Milligen �� �
MCVM:jh
Attachment
cc: Crenna Brumwell, City Attorney
Teri Goodmann, Assistant City Manager
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
,.�~_ Dubuque
Tl-�{E Ci'I'Y OF �" �
�✓
Dr T� � All-America City
u E �
Mc�sterpiece vrr tlzc Mississippi �
��,�,:.��,�1.����.z�„-
TO: Michael C. Van Milligen, City Manager�-w�--�
�d 1-�: ..�-�
FROM: Gus Psihoyos, City Engineer � �._,.�,
SUBJECT: Lower Bee Branch Creek Floating Island Project
CIP# 7201654, PROJECT# 4X0003
DATE: December 12, 2017
INTRODUCTION
The enclosed resolution provides for the acceptance of the construction contract for the
Lower Bee Branch Creek Floating Island Project.
BACKGROUND
In October of 2010 the City Council passed Resolution 390-10 authorizing an
application for Vision lowa River Enhancement Community Attraction and Tourism
(RECAT) grant funding specifically for amenities associated with the Bee Branch Creek
Restoration Project. One of the amenities included is to construct a floating island
system in conjunction with the construction of the Bee Branch Creek Restoration
Project.
In April of 2011 the City Council passed Resolution 114-11 approving and authorizing
the execution of the RECAT Grant Agreement.
The RECAT grant application and grant agreement include funding for a floating island
to be constructed as part of the Bee Branch Creek Restoration Project, located within
the 16th Street Detention Basin.
The proposed floating island system is a form of a wetland which will "bio-mimic" natural
floating wetland systems invented by Nature. Vegetated with native plants, it is a
beautiful, natural and sustainable eco-system which provides many benefits, from
habitat restoration to water cleansing.
When a floating island is launched, a whole diverse eco-system is created which
attracts life in all its forms, from microbes to nymphs, to butterflies, to fish, birds.... all
the way up the food chain. Figure 1 shows the multitude of benefits provided by floating
island systems.
.a4 s �.u a v fn. w 4 .+ s 6 i
;`'r� �'��.��� 4 i•iar, 1+ �s'Ir��r i sra�r� etr,i
i"i�+•'� X1���1 � A .. � i�� "r! �En ���,��Jl�ri�i,"� �
�� � �
. - ,�_ ��I;��� �,v�v�;�t3�rlcl���;�ic�u�:�1
.
� . R d���It+t��It t,r,�i.ty
� �
(41i�t{4t(� lt h'.�'�f1�k'�w�Hy _
iM�t^���£?P'U't?it[]t
�:�.' • � � ► .
.`�:,,,� ��'� �
�,.
� ti _.
�_.1, .•_ ' � ..
lsk�an�rnc�ferHal 1��c�ot sys��a�s � �r�'. �•^` ..
ra
�stcvidc�a�l�at�surtace e�r�r� ` . � . �
f�r t�r�MC�c�t�lcro�x.�1c, •. ; ¢'
pra�f�ala t��ctit}�sl�uts�rwls • ~- � �
, Fe€��Ehe��v�afc�r �� 7� ��nd sha�cl��r�1s�o�vd�
� ��vc:r�,c�t�,w C�M!Cr tf`tt�,�'�
I
k�a1 sy���rt�s�au��r��iM��ti�n��r�en�a crut
of td��s�t�s E3srd�h F�yd��a�r�t��
Figure 1. Benefits of a floating island system.
DISCUSSION
The Lower Bee Branch Creek Floating Island Project consisted of installing fourteen
floating islands that vary in size from 70 square feet to 300 square feet in area. The total
combined island area is 2,674 square feet. The islands were assembled, planted with
native wetland plants, launched, and anchored to the bottom of the Bee Branch Creek
between the 16th Street bridge and the 16th Street Detention Basin.
The Lower Bee Branch Creek Floating Island Project was completed by ENCAP, Inc. of
DeKalb, Illinois in the final contract amount of$176,045.00, which is 10.67% under the
original contract of$197,075.00. The reduced project cost was due to re-configuration
of the anchor systems for each island. The revised anchor design resulted in less
materials and easier installation.
BUDGETIMPACT
The project cost for the Lower Bee Branch Creek Floating Island Project is as follows:
Award Final
Construction Contract $197,075.00 $176,045.00
Contingency (10%) 18,290.00 0.00
Engineering 30,500.00 34,893.71
Total Project Cost $245,865.00 210.938.71
The project funding summary is as follows:
CIP No. Fund Description Fund Amount
7201654 Bee Branch Creek Restoration Project $210,938.71
RECOMMENDATION
I recommend acceptance of the Lower Bee Branch Creek Floating Island Project
improvements and establishing the final contract amount of$176,045.00.
ACTION TO BE TAKEN
I respectfully request adoption of the attached resolution accepting the improvements,
establishing the final construction contract in the amount of$176,045.00, and
authorizing the payment of the contract amount to ENCAP, Inc. for the Lower Bee
Branch Creek Floating Island Project.
Attach.
Prepared by Deron Muehring
cc: Crenna Brumwell, City Attorney
Jenny Larson, Budget Director
Deron Muehring, Civil Engineer
RESOLUTION NO. 395-17
ACCEPTING THE LOWER BEE BRANCH CREEK FLOATING ISLAND PROJECT
AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE
CONTRACTOR
Whereas, the Public Improvement Contract for the Lower Bee Branch Creek
Floating Island Project (the Project) has been completed and the City Engineer has
examined the work and filed a certificate stating that the Project has been completed
according to the terms of the Public Improvement Contract and that the City Engineer
recommends that the Project be accepted; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved, and the Project
is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from
the Bee Branch Creek Restoration Project appropriation for the contract amount of
$176,045.00 less any retained percentage provided for therein as provided in Iowa
Code chapter 573, and to pay such retainage only in accordance with the provisions of
Iowa Code chapter 573.
Passed, approved and adopted this 18th day of December 201
Attest:
2'i /2 /
Kev n Firnst hI, CMC, City Clerk
111/ .�
fy D. Buol, Mayor
i�
�
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE LOWER BEE G
BRANCH CREEK FLOATING ISLAND PROJECT
The undersigned City Engineer of the City of Dubuque, lowa, hereby certifies that �
he has inspected the Lower Bee Branch Creek Floating Island Project, that the Project
has been perFormed in compliance with the terms of the Public Improvement Contract,
and that the total cost of the completed work is $210,938.71.
,
Dated this � day of 2017. �
Gus Psihoy , City Engineer
�