2001 Asphalt Paving Pro FY 02MEMORANDUM November 12, 2002 TO:The Honorable Mayor and City Council Members FROM:Michael C. Van Milligen, City Manager SUBJECT:2001 Asphalt Paving Project (FY2002) Public Works Director Mike Koch is recommending acceptance of the construction contract for the 2001 Asphalt Paving Project (FY2002), as completed by Portzen Construction, Inc., in the final contract amount of $1,751,883.09. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA November 12, 2002 TO: Michael C. Van Milligen, City Manager FROM: Michael A. Koch, Public Works Director SUBJECT: 2001 Asphalt Paving Project (FY2002) INTRODUCTION The enclosed resolutions provide for the accePtance of the construction contract for the 2001 Asphalt Paving Project (FY2002). DISCUSSION Work has been completed on the project by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $1,751,883.09. The project included: 1. Kaufmann Avenue Realignment 2. Asphalt Resurfacing Projects a. Etm Street - 12th to 22nd and 24th to 26th b. Kaufmann Avenue - 22nd to the Quarry c. 22nd Street - Kniest to Kaufmann 3. Miscellaneous Projects a. 5th Street Parking Lot b. Veteran's Memorial Parking Lot c. Airport FOB Parking Lot d. Eagle Point Park Entrance Road e. Fiber Optic Along Kaufmann Avenue The 2001 Asphalt Paving Project also included resurfacing of Jackson Street, from 30th to 32nd Streets which was part of a storm sewer repair project, and the resurfacing of Rising and Oak Streets which were part of a sanitary repair project. RECOMMENDATION I recommend that the City Council accept the improvements and the final contract be established at $1,751,883.09. BUDGET IMPACT A summary of the project cost is as follows: Bid Final Construction Contract $1,694,717.78 $1,751,883.09 Contingency 162,084.05 0 Engineering 89,146.23 61,315.91 Total Project Cost $1,945,948.06 $1,813,199.00 The project is funded as follows: Fiber Optic Conduit Fifth Street Parking Lot Veteran's Memorial Parking Lot Airport FOB Lot Watermain Replacement Sanitary Sewer Repair Storm Sewer Repair Remainder of Streets Fund Eagle Point Park Total Project Funding Parking Construction Fund Sales Tax Fund Parking Sales Tax Fund General Fund Sanitary Sewer Fund Storm Sewer Fund Sales Tax Fund/ Road Use Tax Sales Tax Fund Bid $ 116,643.90 35,289.56 78,479.05 24,544.44 66,687.00 115,789.24 132,115.72 1,347,691.07 28,708.08 $1,945,948.06 Final $ 100,684.09 40,220.70 76,651.30 14,336.39 93,765.08 89,713.64 77,724.61 1,292,338.78 27,764.41 $1,813,199.00 The Fiscal Year 2002 appropriation for the Annual Street Program $2,515,000 was funded by the Road Use Tax and the 1% Local Option Sales Tax Fund. The 2001 Asphalt Paving Project, as outlined, will require $1,393,022.87 of the appropriation. The remaining balance is to be used for the Wartburg and White Street Reconstruction Projects. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final construction cost. Prepared by Michael Felderman, Civil Engineer cc: Pauline Joyce, Administrative Services Manager Pamela Myre, Economic Development Bob Green, Water Department Manager Andrew Perry, Airport Manager Bob Boleyn, Airport Operations/Maintenance Supervisor Gil Spence, Leisure Services Manager RESOLUTION NO. 605-02 ACCEPTING IMPROVEMENT Whereas, the contract for the 2001 Asphalt Paving Project (FY2002) has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the Road Use Tax Fund and the 1% Local Option Sales Tax Fund in amount equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this 18th day of November, 2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 606-02 FINAL ESTIMATE Whereas, the contract for the 2001 Asphalt Paving Project (FY2002) has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $1,813,199.00 and the said amount shall be paid from the Road Use Tax and the 1% Local Option Sales Tax Fund of the City of Dubuque, iowa. Passed, approved and adopted this 18th day of November ,2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk Construction Estimate BELL STREET RECONSTRUCTION ITEM CODE ITEM UNIT UANTITY UNIT COST TOTALCOST 1 2102-425070 SPECIAL BACKFILL 2 2102-2710070 EXCAVATION, CL 10, RI)WY+BORROW 3 2105-8425005 TOPSOIL, FURN+SPREAD 4 2110-3825010 GRANULARMAT'L 5 2123-7450020 SHLD FINISH, EARTH 6 2213-6745500 RMVL OF CURB 7 2301-1032080 STD/S-F PCC PAV'T, CL C CL 2, 8" 8 2503-7275018 SWR, 1500D STORM, 18" 9 2510-6745850 RMVL OF PAV'T I0 2512-1750006 CURB+GUTTER, PCC 11 ,2515-2475007 DRIVEWAY, PCC, 7" 12 2518-6910000 SAFETY CLOSURE 13 2527-9263111 PAINTED PAV'T MARK, WATERBORNE 14 2528-8445110 TRAFFIC CONTROL 15 25334980005 MOBILIZATION 16 2599-9999005 STORM SEWER, INTAKE 104-B 17 2599-9999005 18 2599-9999005 19 2599-9999005 20 2599-9999005 MONUMENTS, DIRECTIONAL MONUMENTS, ENTRY ELECTRICAL SERVICE HANDHOLE TON CY CY TON STA STA SY LF SY LF SY EACH STA LS LS EACH EACH EACH EACH EACH 21 2599-9999005 22 2599-9999005 23 2599-9999005 24 2599-9999009 25 2599-9999009 26 2599-9999009 27 2599-9999009 28 2599-9999009 INSTALLATION OF CIRCUTS INTO AN EXIST EACH HISTORIC STREET LIGHT w/PC BASE EACH INTERSECTION STREET LIGHT EACH FURNISH AND INSTALL SCH 40 PVC, 2" LF FURNISH AND INSTALL SCH 80 PVC, 3" LF FURNISH AND INSTALL 2@SCH 80 PVC, 2" LF DIRECTIONAL BORING,2" LF DIRECTIONAL BORING, 3" LF 29 2599-9999009 ELECTRICAL CABLE #10 XHHW GROUND LF 30 2599-9999009 ELECTRICAL CABLE #I0 XHHW LF 31 2599-9999009 ELECTRICAL CABLE #8 XHHW LF 32 2599-9999009 ELECTRICAL CABLE #6 XHHW LF 33 2599-9999009 ORNAMENTAL FENCE LF 34 2599-9999010 IRRIGATION SYSTEM LS 35 2599-9999018 REMOVAL & SALVAGE OF BRICK SY 36 2599-9999018 SIDEWALK, PCC, 4" - COLOR SY 37 2599-9999018 STD/S-F PCC PAV'T, CL C CL 2, 8" COLOR SY 38 2601-2639010 SOD SQ 39 2611-200o TREE, FURN+INSTALL (WITH WARRANTY) EACH 1310 2393 1107 1341 22.8 0.4 1997 25 569 1498 149.8 5 30.31 1 1 2 2 2 6 12 1 71 4 5200 304 260 26O 367 5950 17200 8200 11500 961 I 350 5021 245 210 116 $I0.00 $5.25 $14.00 $10.50 $I25.00 $I2,000.00 $22.00 $27.00 $3.O0 $14.00 $36.00 $50.00 $30.00 $6,500.00 $6,500.00 $1,500.00 $50,00O.00 $60,000.00 $6,000.00 $500.00 $2,000.00 $6,000.00 $4,000.00 $4.80 $5.60 $5.80 $11.00 $12.00 $O.75 $0.75 $1.25 $I.50 $125.00 $20,0O0.00 $5.00 $50.00 $60.00 $3O0.00 $400.00 $13,100.00 $12,563.25 $15,498.00 $14,080.50 $2,850.00 $4,800.00 $43,934.00 $675.00 $1,707.00 $20,972.00 $5,392.80 $250.00 $909.30 $6,500.00 $6,500.00 $3,000.00 $100,000.00 $120,000.00 $36,0O0.00 $6,000.00 $2,000.00 $426,000.00 $16,000.00 $24,960.00 $1,702.40 $1,508.00 $2,860.00 $4,404.00 $4,462.50 $12,900.00 $10,250.00 $17,250.00 $120,125.00 $20,0O0.00 $1,750.00 $251,050.00 $14,700.00 $63,000.00 $46,400.00 Construction Contract $1,456,053.75 P~RTIAL PAYMENT: PROJECT NAME: CONTRACTOR: CODE 2 3 I103.0200 4 1103.0210 5 1105.0100 6 1105.0102 7 1201.0100 8 1203.0100 9 1205.0200 10 1301.0500 16 1301.1300 19 1301.I305 20 1301.1400 21 22 1301.1800 23 1301.2100 24 1303.0102 25 1304.0100 26 1403.0301 27 I403.0301 28 1404.0134 29 I4O4.0546 30 1404,0554 31 1406.o100 150L2370 32 33 34 35 36 37 38 39 40 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 City of Dubuque F/NAL 2001 Asphalt Paving Projects Port.eh Construction. Inc. ITEM Clearing & Grubbing 12" to 15" New Tree Excavation, Unclassified Excavation. Header Backfill Limestone Backfill Topsoil Graded Stone Base 3" Crushed Stone Base Bedding Stone, (I ") Clean Removal of Asphalt Pavemeat PAine or Tack Coat Cleaning and Preparation ACC Furl Depth Repak Patohes ACC Leveling Course Fabvle Reinforcement, Petromat ACC Binder Course ACC Surface Comse ACC Surface Course (Headers) DAT] Nov. 8, 2002 CONTRACT AMOUNT: $1,578,073.88 QTY. UNIT COST TO DATE COST ACC Surface Course SHRP PG 64-34 ACC Hand Patching Rebar g4 Each Each CY CY Ton SY Ton Ton Ton SY Gallon SY SY Ton SY Ton Ton Ton Ton Ton LF Each Ton SY LF LF Remove and Replacement of PC Coneret~ Curb & Cmt~er (12 LF PCC Handicapped Ramp, 4", Remove and Constrtmt SF $450.00 2 $900.00 $275.00 0 $0.00 $7.50 666 $4,995.00 $32.18 101 $3,250.18 $5.59 1073.47 $6,000.70 $15.00 756.01 $ll,340.15 $12,30 2541.51 $31,260.57 $9.50 0 $0.00 $10.30 657.6 $6,773.28 $2.61 880.3 $2,297.58 $1.50 8655 S12,982.50 $1.08 81064.19 $87,549.33 $52.92 51 $2,698.92 $33.84 4238.8 $I43,440.99 $i.50 2097 $3,145.50 $36.87 3173.09 $116,991.83 $39.22 2476.02 $97,109.50 $69.69 71.07 $4,952.87 $39.74 6364.67 $252,931.99 $69.69 647.62 $45,132.64 $1.00 0 $0.00 $275.00 186 $51,150.00 $69.69 0 $0.00 $4.62 31734.95 $146,615.47 $0.67 100757 $67~07.19 $13.80 2600.71 $35,889.80 $23.75 2142 $50,872.50 $2.55 3423.2 $8,729.I6 $36.00 62.29 $2,242.44 $2.55 3602.55 $9,186.50 $75.00 0 $0.00 PCC Driveway, 6", Remove and Constcuet SY PCC SidewaLk, 4", Reraov¢ and Construct SF Flowable Mortar CY Sanitary Sewer Mmahole, Replace, Complete Location: Kaufmann Ave Marthole No. 16-K LS Manhole No. 17-K LS Manhole No. 18-K LS Manhole No. 19-K LS Manhole No. 20-K LS Manhole No. 21~K LS Manhole No. 22-K LS Manhole No. 23-K LS Manhole No. 24-K LS Manhole No. 25-K LS Manhole No. 26-K LS Manhole No. 27-K LS Manhole No. 28-K LS Manhole No. 29-K LS Manhole No. 30-K LS Manhole No. 31 -K LS Manhole No. 32-K LS Manhole No, 33-K LS Manhole No. 34-K LS Manhole No. 35-K LS Manhole No. 36-K LS Location: Elm St Manhole No. I-E LS Manhole No. 2-E LS Manhole No. 3-E LS Manhole No. 4-E LS Mauhole No. 5-E LS Mauhole No. 6-E LS $2,305.00 I $2,305.00 $2,455.00 I $2,455.00 $2,610,00 I $2,610.00 $2,690.00 I $2,690.00 $2,810.00 I $2,810.00 $t,046.00 l $3,046.00 $3,300.00 I $3,300.00 $2,846.00 I $2,846.00 $3,300.00 1 $3,300.00 $2,846.00 1 $2,846.00 $3,500.00 1 $3,500.00 $3,300.00 0 $0.00 $3,105.00 I $3,105.00 $3,300.00 I $3,300,00 $4,640.00 1 $4,640.00 $3,964.00 1 $3,964.00 $4,160.00 1 $4,160,00 $4,350.00 I $4,350.00 $2,846.00 0.84 $2,390.64. $2,846.00 1 $2,846.00 $4,012.00 0 $0.00 $2,810.00 i $2,810.00 $2,810.00 0 $0.00 $3,845.00 1 $3,845.00 $4,720.00 1 $4,720.00 $2,646.00 0 $0.00 $2,405.00 1 $2,405.00 PARTIALPAYMENT: PROJECTNAME: CONTRACTOR: CODE 59 60 61 62 63 64 1501.1011 65 1501.1012 1502.2201 66 67 68 69 70 71 15012280 72 1501.2910 73 15022115 74 1502.2510 75 1502.2511 76 1502.2540 77 1502.2560 78 1503.I391 79 1503.1391 80 1503.1391 81 1503.1391 82 1503.1391 83 1503.2646 84 1503.2660 85 1503.2660 86 1503.2616 87 1503.2626 88 1503.2628 89 1503.2663 90 1503.2663 91 1503.2708 92 1503.2708 93 1503.2708 94 1503.2708 95 1503.2708 96 1503.2719 97 1503.2719 98 1503.2900 99 1503.4256 100 t503.4256 101 1503.4256 402 1503.4256 403 1503.4256 404 1601~200 105 [602.0100 406 1705.0200 107 t801.0000 108 2000.0000 109 110 A-1 1901.0100 A-2 1910.0000 E-t FINAL City of Dubuque 2001 Asphalt Paving Projects Portzea Consmmtion, Inc. ITEM Manhole No. 7-E LS Manhole No. 8-E LS Manhole No. 9-E LS Manhole No. 10-E LS Manhole No. II-E LS Sanitary Sewe~ Pipe, 8" Liner LF Sanitary Sewer Pipe, 12" Liner LF Storm Sower Manhole, Remove and Replace, Complete Location: Elm St Maxthole No. 1 SE ~ach Manhole No. 2SE Each Manhole No. 3SE Each Manhole No. 4SE Each Manhole No. 5SE Each Sanita~ Sewer Manhole, Ring (Frame) and Cover Each Saalta~ Sewer, 4" C.I.P. Lateral LF RCP Storm Sewer 15" LF Storm Sewer, Intake 101-B Each Storm Sewer, Intake 101-B Special Each Storm Sewer, Intake 104-B Special Each Storm Water Curb Opeaing Neenah R-3262-3 Each Warermam 6" DIP, Push on J(fmt w/Polywarp, Class 52 LF Watermain 8" DIP, Push on Joint w/Polywarp, Class 52 LF Watermain 10" DIP, Push on Joint w/Polywasp, Class 52 LF Watermaln 12" DIP, Push on Joint w/Polywarp, Class 52 LF Watemmm 20" DIP, Push on Joint w/Polywarp, Class 52 LF DATI Nov. 8, 2002 CONIRACT AMOUNT: $1,578,073.88 QTY. UNIT COST TO DATE COST $2,905.00 I $2,905.00 $1,990.00 i $1,990.00 $2,105.00 0 $0.00 $I,790.00 0 $0.00 $2,646.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $3,300.00 I $3,300.00 $2,390.00 I $2,390.00 $2270.00 0 $0.00 $2,390.00 1 $2,390.00 $2J95.00 1 $2395.00 $235.00 84 $19,740.00 $35.00 0 $0.00 $30.00 98.5 $2,955.00 $1,250.00 25 $31,250.00 $1,850.00 10 $18,500.00 $2,550.00 1 $2,550.00 $90.00 0 $0.00 $30.00 52.91 $1,587.30 $33.00 7 $231.00 $37.00 16.75 $619.75 $41.00 22 $902.00 $70.70 57.41 $4,058.89 $375.00 0 $0.00 FiRing I Ox 10x6 Anchor Tee Each Fitting 10xl0xI0 MJ Tee Each Fitting 12x12xI2 MJ Tee Each Fitting 12x12x20 MJ Tee Each Filling 20x20x8 MI Tee Each Fitting 20x20x20 MJ Tee Each Reducer 10"x6" MI PE Each Reducer 12"x10" MJ PE Each Valve, Gate (6") RS "O' Ring MJ Each Valve, Gate (8") RS "O" Ring MI Each Valve, Gate [10"~ RS "O" Ring MJ Each Valve. Gate 112") RS "O" Ring MJ Each Valve, Gate 120") RS 'O" Ring MJ Each Water Valve Box, (Slreet) Replace Uppex Sect/oas and Lids Each Water Valve Box. (Slzeet) Replace Middle Sect/on Each $370.00 i $370.00 $415.00 0 $0.00 $2,100.00 0 $0.00 $1,600.00 I $11600.00 $1,950.00 I $I,950.00 $281.00 2 $562.00 $308.00 0 $0.00 $595.00 3 $1,785.00 $725.00 I $725.00 $945.00 I $945.00 $1,200.00 I $1,200.00 $3,045.00 7 $21,315.00 $150.00 55 $8,250.00 $180.00 14 $2,520.00 $1,350.00 0 $0.00 $135.00 3 $405.00 $155.00 2 $310.00 $210.00 2 $420.00 $250.00 0 $0.00 $630.00 17 $10,710.00 Relocate Hydrants MI includes new hydrant ) }:ach Sleeveg441, 6" MJ Each Sleeveg441, 8" MJ Each Sleeve~41, 10" MS Each Sleeveg441. 12" MJ F~ch Sleeve g441, 20" MJ Each Sodding Patches SY Sodding SY Asphalt Sawcet LF Pavement Marking LS Traffic Control LS Flagger Day Plot Car Day ALTERNATE Installing 1~5" PVC duet containing 4 ~ 1" PVC innerduct LF ~ Box (sidewalk) Each $12.60 836 $10,533.60 $4.95 665 $3,291.75 $2.00 2914.6 $5,829.20 $475.00 1 $475.00 $7,844.00 1 $7,844.00 $305.00 66 $20,130.00 $205.00 0 $0.00 0 $11.65 8185 $95,355.25 $444.07 12 $5,328.84 $9.00 27.75 $249.75 PARTIAL PAYMENT: FINAL PROJECT NAME: CO~CTOR: City ofDubuqu¢ 2001 Asphalt Paviug Projects Portzen Constmctio~ Inc. CODE ITEM UNIT E-2 Schedule 40 PVC 6' E-3 RCP 12" E-4 RCP 24" E-5 Intake, 101-C DATI Nov. 8, 2002 CONTRACT AMOUNT: $1,578,073.88 QTY. UNIT COST TO DATE COST LF $6.00 I4 $84.00 LF $28.50 19.5 $555.75 LF $41.50 308.5 $12,802.75 Each $1,800.00 I $1,800,00 Tons $25.00 15.47 $386.75 LS $75.00 12 $900.00 CY $145.00 159.5 $23,127.50 LF $32.00 166 $5,312.00 LF $4.20 483 $2,028.60 LF $11.00 13 $143.00 LF $8.00 6 $4g.00 Each $10.00 I $10.00 LF $25.00 32.5 $812.50 LF $25.00 6 $150.00 LF $21.00 10.5 $220.50 SY $6.25 3909.56 $24,434.75 Each $800.00 2 $1,600.00 LS $3,754.70 I $3,754.70 LF $4.20 71.3 $299.46 LS $1,950.00 1 $1,950.00 LS $210.00 1 $210.00 LS $1,174.00 1 $1,174.00 LS $26,085.00 I $26,085.00 LS $17,540.91 I $17,540.91 ES $6,439.53 1 $6,439,53 LS $2,370.37 1 $2,370.37 LS $7,593.60 1 $7,593.60 LS $1,235.70 l $1,235.70 LS $1,948.00 I $1,948.00 LS $1,001.00 1 ES $398.70 I $398.70 ES $6,016.00 i $6,016.00 LS $3,097.64 1 $3,097.64 LS $16,193.82 1 $16,193.82 TOTAL DUE CONTRACTOR ENGINEERING TOTAL CONSTRUCTION COST $1,751,883.09 $61,315.91 $1,813,199.00 correct mount of ail work required to complete the above improvement, APPROVED: Michael Vau Milligea, City Mauager City of Dubuque,Iowa The undersigned, ~ contractor for the above knpmvement, does hereby accept the above ~Totai Due Contmcto?, as full settlement for all claims for said improvemen[ CONTP, ACTOP~ f~ R'T-~' ,~.,s.f Mmh~ei A Koch Public Works