Flora & Sutton Pools Playg FinaMEMORANDUM November 22, 2002 TO:The Honorable Mayor and City Council Members FROM:Michael C. Van Milligen, City Manager SUBJECT:Flora Pool and Sutton Pool Water Playground Project Leisure Services Manager Gil Spence is recommending acceptance of the Flora Pool and Sutton Pool Water Playground Project, as completed by Portzen Construction, in the final contract amount of $758,045.50. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gil D. Spence, Leisure Services Manager CITY OF DUBUQUE, IOWA MEMORANDUM November 20, 2002 TO: Michael C. Van Milligen, City Manager FROM: Gil D. Spence, Leisure Services Manager SUBJECT: Flora Pool and Sutton Pool Water Playground Project INTRODUCTION The purpose of this memorandum is to recommend that the city Council accept the Flora Pool and Sutton Pool Water Playground Project. DISCUSSION The Flora Pool and Sutton Pool Water Playground Project has been completed by Portzen C'Onstruction in the final contract amount of $758,045.50. A summary of the project costs is as follows: Bid Amount Final Costs contract $725,021.00 $725,021.00 change order #1 - 11,081.50 change order #2 - 14,728.50 change order #3 - 7,214.50 TOTAL $725,021.00 $758,045.50 Change order #1 is at Flora Pool and included a number of items. The larger items are additional p. ipe and drain pipe for the SCS equipment ($3,800), additional storm water catch basin ($2,100), auto fill device ($3,950) and change from grass seed to sod ($1,200). Change order #2 is at Sutton Pool and was to adjust site improvements to allow the pool to fit within the site constraints. The original Sutton Pool-drawings provided the engineer for this project were not accurate, creating the need to make these adjustments continued page two Change order #3 is also at Sutton Pool and includes a number of items. The larger items would be 420 square feet of added pool deck ($2,100), relocate water main ($2,000), and auto fill device ($3,950). ACTION STEP The action requested is that the City Council adopt the attached resolutions accepting the improvements and setting the final cost. GDS:et attachments Preparer: Gil D. Spence Address: 2200 Bunker Hill Rd Phone: (563) 589-4263 RESOLUTION NO. 622-02 ACCEPTINGIMPROVEMENT WHEREAS, the contract for the FLORA POOL AND SUTTON POOL WATER PLAYGROUND PROJECT has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the General Fund in amount equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this 2nd day of December ,2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk PK Preparer:. Gil D. Spence Address: 2200 Bunker Hill Rd Phone: (563) 589-4263 RESOLUTION NO. 623-02 FINAL ESTIMATE WHEREAS, the contract for the FLORA POOL AND SUTTON POOL WATER PLAYGROUND PROJECT has been completed and the Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs; NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $758,045.50, and the said amount shall be paid from the General Fund of the City of Dubuque, Iowa. Passed, approved and adopted this 2nd day of December ,2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk PK