Locust Street Connector_Central Avenue Traffic Control Fiber OpticsTHE CITY OF Dubuque -~.., ~~ ~T T~ ~ AlaAmedcal~ty ~,J I Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Locust Street Connector and Central Avenue Traffic Control Camera and Fiber Optic Improvements Project Iowa DOT Project NO. STP-A-946-0(1)--86-31 DATE: March 27, 2009 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Locust Street Connector and Central Avenue Traffic Control Camera and Fiber Optic Improvements Project, as completed by Price Industrial Electric, in the final contract amount of $404,821.40, which is a 1% decrease from the original contract in the amount of $408,622.00. I concur with the recommendation and respectfully request Mayor and City Council approval. Mi ael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY QF .- Dubuque '~II~®' 1VIa5tea~pi~Ge On the 1VIISStSSlrppi Zoos TO: Michael C. Van Milligen, City Manager ,, FROM: Gus Psihoyos, City Engineer -~ DATE: March 27, 2009 SUBJECT: Locust Street Connector and Central Avenue Traffic Control Camera and Fiber Optic Improvements Project Iowa DOT Project No. STP-A-946-0(1)--86-31 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Locust Street Connector and Central Avenue Traffic Control Camera and Fiber Optic Improvements Project, Iowa DOT Project No. STP-A-946-0(1)--86-31. BACKGROUND On December 3, 2007, the City Council approved (Res. 570-07) an agreement with the Iowa Department of Transportation (Iowa DOT) and the City of Dubuque (City) for the funding of the Primary Highway Improvements Project No. 2008-16-019, Final Traffic Control System Improvements (Iowa DOT Project No. STP-A-946-0(1)--86-31). Under ICAAP funding, 80 percent (80%) or $330,090 of the total eligible project items are reimbursable. The traffic control system improvements were made throughout the City including the integration of a computer-based transportation management system to monitor, control, change, and evaluate traffic conditions. Traffic signal improvements were also made on Locust Street at the US 20 and US 151/61 intersections. The Primary Highway Improvements Project No. 2008-16-019, Final Traffic Control System Improvements provided for the following: - Locust Street at US 20 and US 151/61 Intersections: Traffic signal improvements at the intersections near the Locust Connector, which included the three intersections on Locust Street at Charter, US 20, and the Locust Connector. It also included connecting the two intersections on US 151/61 at the Locust Connector and Jones Street. This project included installation of fiber and conduit along US 52 from City Hall to the Locust Connector at US 151/61. Communication equipment was installed at the primary intersections along US 52 and at the referenced 5 intersections. This project provided remote monitoring capabilities and extended the traffic signal interconnect back to City Hall. - Traffic Signal Control System: The integration of a computer-based transportation management system to monitor, control, change, and evaluate traffic conditions on US 20 and all future coordinated corridors within the entire City. DISCUSSION The Locust Street Connector and Central Avenue Traffic Control Camera and Fiber Optic Improvements Project was completed by Price Industrial Electric of Hiawatha, Iowa, in the final contract amount of $404,821.40, which is a 1.0% decrease from the original contract in the amount of $408,622.00. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $404,821.40. BUDGET IMPACT The summary of the project costs is as follows: Award Final Construction Contract (No Software) $408,622 $404,821.40 Contingency 45,910 0.00 Engineering/Contract Administration 36,728 33,300.87 Engineering Design 14,100 14,100.00 Total Project Cost $~ $452,222.27 Of the $404,821.40 in construction costs, $323,857.12 (80%) is reimbursable from Federal ICAAP funds for this project. The funding summary for the project is as follows: CIP Funding Source 3001852 Traffic Signal Operations Center 3001266 Traffic Signal Interconnect 1011133 Traffic Signal Mastarm Retrofit 1021609 Fiber Optic Conduit -Private Subdivisions & Misc. Projects 1021017 Fiber Optic Conduit -Paving Projects Total Project Funding Amount $293,708.43 27,667.51 11,067.01 36,776.77 83,002.55 $452,222.27 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $404,821.40 to Price Industrial Electric for the Locust Street Connector and Central Avenue Traffic Control Camera and Fiber Optic Improvements Project. Prepared by Jon Dienst, PE cc: Roger Walton, District Staff Engineer, Iowa DOT Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer Chris Kohlmann, Information Services Manager David Ness, PE RESOLUTION NO. 109-09 ACCEPTING THE LOCUST STREET CONNECTOR AND CENTRAL AVENUE TRAFFIC CONTROL CAMERA AND FIBER OPTICS IMPROVEMENTS PROJECT (IOWA DOT PROJECT NO. STP-A-946-0(1)--86-31) AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Locust Street Connector and Central Avenue Traffic Control Camera and Fiber Optics Improvements Project (Iowa DOT Project No. STP-A-946-0(1)--86-31) (the Project) has been completed and the City Engineer has examined the work and, filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Traffic Signal Operations Center fund, Traffic Signal Interconnect fund, Traffic Signal Mastarm Retrofit fund, Fiber Optic Conduit-Private Subdivisions & Misc. Projects fund and the Fiber Optic Conduit-Paving Projects fund appropriation for the contract amount of $404,821.40 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 6th day of April, 2009. Roy D. Buol, Mayor Attest: Kevin S. Firnstahl, Assistant City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE LOCUST STREET CONNECTOR AND CENTRAL AVENUE TRAFFIC CONTROL CAMERA AND FIBER OPTICS IMPROVEMENTS PROJECT (IOWA DOT PROJECT NO. STP- A-946-0(1)--86-31) The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Locust Street Connector and Central Avenue Traffic Control Camera and Fiber Optics Improvements Project (Iowa DOT Project No. STP-A-946- 0(1)--86-31), that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $452,222.27. Dated this 3rd day of April, 2009. City Engineer Filed in the office of the City Clerk on the 3rd day of April, 2009. Kevin S. Firnstahl, Assistant City Clerk City of ®ubuque a Engineering ®ivision Final Payment Form PAYMENT NO: COUNCIL FINAL DATE: March 26, 2009 PROJECT NAME: ICAAP -Locust Connector -Camera & Fiber Optic - STP-A-946-0 (1) --86-31 LETTING DATE: 6/17/2008 CONTRACTOR: Price Industrial Electric CONTRACT AMOUNT: $408,622.00 BID ITEM DESCRIPTION UNIT UNIT COST CTO DATE AMOTO DATENED EXCAVAT/ON 0010 2511-6745900 -Removal of Sidewalk 0020 2511-7526004 -Sidewalk, P.C. Concrete, 4 in. 0030 2515-2475006 -Sidewalk, P.C. Concrete, 6 in. 0040 2515-6745600 -Removal of Paved Driveway 0050 2523-0000310 - Handholes and Junction boxes 0060 2525-0000100 -Traffic Signalization 0070 2528-8445110 -Traffic Control 0080 2533-4980005 -Mobilization 0090 2599-9999005 -Connect to Existing Handhole or Cabinet 0100 2599-9999005 -Fiber Optic Hub Cabinet Install 0110 2599-9999005 -Fiber Vault, 48 in. 0120 2599-9999009 -Conduit, Rigid PVC, 1 in. Conduits 0130 2599-9999009 -Conduit, Rigid PVC, Pushed, 2 in. 0140 2599-9999009 -Conduit, Rigid PVC, Pushed, 4 in. w/4 - 1" 0150 2599-9999009 -Fiber Cable; 24 Single Mode and 12 Mult. SY $ 20.00 128.75 $ 2,575.00 SY $ 55.00 122.29 $ 6,725.95 SY $ 25.00 6.57 $ 164.25 SY $ 75.00 6.57 $ 492.75 Each $ 2,400.00 8.00 $ 19,200.00 LS $ 98,300.00 1.00 $ 98,300.00 LS $ 3,000.00 1.00 $ 3,000.00 LS $ 5,000.00 1.00 $ 5,000.00 Each $ 1,200.00 13.00 $ 15,600.00 Each $ 5,200.00 3.00 $ 15,600.00 Each $ 3,400.00 8.00 $ 27,200.00 LF $ 10.50 540.00 $ 5,670.00 LF $ 13.25 717.00 $ 9,500.25 LF $ 26.00 6672.00 $ 173,472.00 LF $ 2.20 10146.00 $ 22,321.20 TOTAL AMOUNT EARNED TO DATE -BASE BID: $ 404,821.40 CHANGE ORDERS.. TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ - TOTAL AMOUNT EARNED TO DATE: $ 404,821.40 TOTAL DUE CONTRACTOR: $404,821.40 ENGINEERING: $47,400.87 TOTAL CONSTRUCTION COST: $452,222.27 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct am nt of all work required to complete the above improvement. ~___ APPROVED: Michael Van Milligen, ity-1G1`anage City of Dubs , to a APPROVED: •~ ,..(/Lr-- ~ /Jt Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Price Industrial Electric contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: Price Industrial Electric City of Dubuque FINAL CONTRACT AMOUNT 05-Mar-09 PROJECT NAME: 2007 CDBG Access Ramp Installation Project ' Contract Amount $38,697.63 CONTRACTOR: Skyline Storage & Tru king `~_ FINAL AMOUNT ITEM UNIT BID QTY. UNIT COST QUANTITY EARNED to Date Demoltion & Removal '. 1. Remove Pavement S.Y. 50.60 $2.50 57.00 $142.50 2. Sawcut, Concrete (Horizontal) L.F. 36.00 $25.00 32.00 $800.00 3. Remove Curb & Gutter L.F. 169.00 $5.00 176.00 $880.00 4, PC Concrete Sidewalk, Removal S. F. 2331.00 $1.25 1714.00 $2,142.50 Excavation & Stone 5. Backfill, Topsoil S.Y. 25.00 $24.00 35.00 $840.00 6. Graded Stone Base TON 28.19 $12.50 114.35 $1,429.38 Pavement 7. PC Concrete Sidewalk, 4" Construct S.F. 952.00 $3.75 569.75 $2,136.56 8. PC Concrete Sidewalk, 6" Construct S. F. 2368.00 $4.25 2330.50 $9,904.63 9. PC Concrete Sidewalk, Thickened Edge -Construct S.F. 115.00 $5.00 $0.00 10. PC Concrete Curb & Gutter, 2.5', Construct ~ L.F. 147.00 $28.00 $0.00 11. PC Concrete Step) Construct __.._____ ,____._ L.F_____ ______20.00_ ___.._____ $45.00 _ _____18.00 ________ $810.00.___..___._____. 12. PCC Straight Curb Install, Up to S. F. 339.00 $15.00 400.00 $6,000.00 40" depth 13. PC Concrete Access Ramp, Each 13.00 $100.00 18.00 $1,800.00 Detectable (Each = 2x4) 14. HMA Patching TON 6.00 $100.00 22.31 $2,231.00 Miscellaneous 15. Combination Hand Railing L.F. 92.00 $50.00 180.00 $9,000.00 16. Sod S.Y. 25.00 $6.00 0.00 $0.00 17. Tree Preservation Measures Lump Sum 1.00 $500.00 0.75 $375.00 18. Erosion Control Lump Sum 1.00 $500.00 0.75 $375.00 19. Traffic Control & Safety Control Lump Sum 1.00 $1,000.00 0.75 $750.00 EXTRA ITEMS Excavation for walk Hours $75.00 9.30 $700.00 Fence Replacement SE 17th & Washington Lump Sum 1.00 $150.00 Sod Yards $6.00 300.00 $1,800.00 Wall Cut Lump Sum $50.00 $50.00 TOTAL AMOUNT EARNED TO DATE _ $42,316.57 Engineering $4,231.66 Total Construction Cost $46,548.23 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the ~rect amount of all work required to complete the above improvement. APPROVED: Michael an Milligen, City Manager City of Dubuqu owa~' APPROVED: ~ --~-°~ ~Z..~ W Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Skyline Storage & Trucking, contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: Skyline Stor ge & r inc !f'~ BY: ~ ~>~r. ..'~ ~ , TITLE: ~-~Y v~-•~ DATE: ~j~f ~.~cs,