Loading...
Chavenelle Road_Giese Mfg Access°f0: The Honorable Mayor and City Council Members F®M: Michael C. Van Milligan, City Manager SU JECT°: Giese Access on Chavenelle Road ®ATE: March 30, 2009 Economic Development Director David Heiar recommends City Council approval of an agreement between Giese Properties, LLC and the City of Dubuque authorizing the City to modify the site access points to the Giese Manufacturing site in the Dubuque Industrial Center West. Giese Manufacturing has agreed to the changes to their property access. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligan MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager David J. Heiar, Economic Development Director ~:~;.tbu~~r.!e a ~; `~ I I Y f, ~~~ i 200 March 28, 2009 TO: Michael C. Van Milligen, City Manger FROM: David J. Heiar, Economic Development Director R Giese Access ®n Chavenelle Rd. ACIZC ROIJ N Giese Manufacturing, located in the Dubuque Industrial Center West (DICW), currently has two street accesses on to Chavenelle Road. The City intends to construct a new street adjacent to the east side of the Giese site to serve the expansion of the DICW, formerly known as the North Siegert Farm. The proposed street is abutting the second access point to the Giese site and would create traffic issues. ®ISCl1SION The City's consulting engineers on this project, IIW Engineers, are recommending that the second access point on to Chavenelle be eliminated and that a new access be provided to Giese Manufacturing off of the proposed new street (see attached diagram). The cost of these modifications would be included in the design and bid package for the construction of the new street which will be funded in part by the recently awarded RISE grant from the IDOT. Giese Manufacturing has agreed to these changes to their property access. RECOMMN®ATION/ACTION STEP That the City Council authorized the City Manager to sign the attached agreement between Giese Properties, LLC and the City of Dubuque authorizing the City to modify the site access points to Giese Manufacturing site in the DICW. F:\USERS\DHeiar\DICW\Giese Access on Chav Rd memo.doc THE CITY OF ~ Dubuque - ~ DUB E ~-~~ar~ 1 1 Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Giese Access on Chavenelle Road DATE: March 30, 2009 Economic Development Director David Heiar recommends City Council approval of an agreement between Giese Properties, LLC and the City of Dubuque authorizing the City to modify the site access points to the Giese Manufacturing site in the Dubuque Industrial Center West. Giese Manufacturing has agreed to the changes to their property access. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager David J. Heiar, Economic Development Director THE CITY OF !~. DL~B E Masterpiece on the Mississippi Dubuque ~~ ~~~ 2007 March 28, 2009 TO: Michael C. Van Milligen, City Manger FROM: David J. Heiar, Economic Development Director` RE: Giese Access on Chavenelle Rd. ~, t` ~ ~~,~" BACKGROUND Giese Manufacturing, located in the Dubuque Industrial Center West (DICW), currently has two street accesses on to Chavenelle Road. The City intends to construct a new street adjacent to the east side of the Giese site to serve the expansion of the DICW, formerly known as the North Siegert Farm. The proposed street is abutting the second access point to the Giese site and would create traffic issues. DISCUSSION The City's consulting engineers on this project, IIW Engineers, are recommending that the second access point on to Chavenelle be eliminated and that a new access be provided to Giese Manufacturing off of the proposed new street (see attached diagram). The cost of these modifications would be included in the design and bid package for the construction of the new street which will be funded in part by the recently awarded RISE grant from the IDOT. Giese Manufacturing has agreed to these changes to their property access. RECOMMENDATION/ACTION STEP That the City Council authorized the City Manager to sign the attached agreement between Giese Properties, LLC and the City of Dubuque authorizing the City to modify the site access points to Giese Manufacturing site in the DICW. F:\USERS\DHeiar\DICW\Giese Access on Chav Rd memo.doc AR NIENT E EEN TH CITY OF ®UBUQUE, IOVV,4 AN® GIE PROPERTIES, LLC This Agreement, dated for reference purposes the day of 2009, is made and entered into by and between the City of Dubuque, Iowa (City) and Giese Properties, LLC, an Iowa limited liability company with its principal place of business at Dubuque, Iowa (Giese). Whereas, Giese is the owner of Lot 1 of Lot 1 of Dubuque Industrial Center West 5th Addition in the City of Dubuque, Iowa (the Property); and Whereas, the Property is served by an access onto Chavenelle Road as shown on Exhibit 1.2 attached hereto; and Whereas, City intends to construct a new street abutting the Property as shown on Exhibit 1.2; and Whereas, in consideration for City constructing an access from the new street onto the Property as shown on Exhibit 1.2, Giese has agreed to allow City to remove the access onto Chavenelle Road, on the terms and conditions set forth herein. NOW, THEREFORE, IT IS AGREED BY AND BETWEEN THE PARTIES AS FOLLOWS: SECTION 1. Giese grants to City, its agents and employees, access to the Property for the purpose of removing the access onto Chavenelle Road and constructing a new access onto the proposed street abutting the Property, all as shown on Exhibit 1.2. SECTION 2. The removal of the access onto Chavenelle Road and construction of a new access onto the proposed street shall be at City's sole cost. SECTION 3. The construction of the new street shall also include sidewalks abutting the Property and along the new street at City's sole cost. SECTION 4. City shall, at least 45 days prior to commencing significant construction activity, provide to Giese in writing the date on which City anticipates it will begin construction and the approximate length of time required for such construction. SECTION Prior to construction, City shall first submit to Giese for written approval, which shall not be unreasonably denied or delayed, a concise description of the facilities proposed to be constructed, including engineering drawings, if required by City, together with maps and plans indicating the proposed location of all such facilities. SECTION 6. Any contractor or subcontractor employed by City for work or construction must be properly licensed and insured under the laws of the State and all applicable local ordinances. City shall require that each such contractor or subcontractor agrees to have the same obligations with respect to its work as City would have if the work were performed by City. City shall be liable for all activities carried out by its contractors, subcontractors and employees at City request. SECTION 7. If City disturbs a pavement, sidewalk, driveway or other surfacing, or landscaping, or other structure, either on private property or in public rights-of- way, City shall replace and restore all pavement, sidewalk, driveway or other surfacing, or landscaping disturbed, in substantially the same condition and in a good; workmanlike, timely manner. Such restoration shall be undertaken within no more than ten (10) days after the damage is incurred, weather permitting, and shall be completed as soon as reasonably possible thereafter. City shall guarantee and maintain such restoration for at least one year against defective materials or workmanship. SECTION ~. To the fullest extent permitted by law, City shall indemnify and hold harmless Giese from and against all claims, damages, losses and expenses, including but not limited to attorneys' fees, arising out of or resulting from City's use of the Property, provided that such claim, damages, loss or expense is attributable to bodily injury, sickness, disease or death, or injury to or destruction of property including loss of use resulting there from, but only to the extent caused in whole or in part by negligent acts or omissions of City, City's subcontractor, or anyone directly or indirectly employed by City or City's subcontractor or anyone for whose acts City or City's subcontractor may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder. CITY OF ®UBUQU, IOWA Michael Van Milligen City Manager Thomas W. Giese F:\USERS\DHeiar\GieseWgreement.docx 2 P.i~FkT~47tHP-0T ~H.k~€~,~+~Tuw'h~7147-0f... €~?i1$1 1... .. Fb