Loading...
Eagle Point Water Plant Clear Well Reservoir Rehab Phase IITHE CITY OF Dubuque aia~~ DAB E t - Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Eagle Point Water Plant Clear Well Reservoir Rehabilitation Phase II (Coating) Project - CIP 740-1828 DATE: March 26, 2009 Water Department Manager Bob Green recommends City Council approval of the Plans, Specifications, Form of Contract and the Estimated Cost of $52,000 for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation Phase II (Pipe Coating) Project. I concur with the recommendation and respectfully request Mayor and City Council approval. 1 _----- Mic ael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Bob Green, Water Department Manager THE CITY OP DuB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Bob Green, Water Department Manager Dubuque All-AmericaC~y "~ 2007 March 25, 2009 SUBJECT: Eagle Point Water Plant Clear Well Reservoir Rehabilitation Phase II (Coating) Project - CIP 740 1828 INTRODUCTION The attached Resolution is in reference to the Public Hearing on the Plans and Specifications Form of Contract for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation (Coating) Project. BACKGROUND The Eagle Point Water Plant provides the City with its potable water. After the water is treated and filtered it is stored in two clear wells located at the Water Plant before being pumped into the Water Distribution System. The west clear well was constructed in 1880 and has a storage capacity of 650,000 gallons. This clear well was built using large lime stone blocks for the floor and walls. A concrete roof was added several years later. Since its construction, the interior has received gunite treatment and repairs. Earlier this year as Phase I of this project, the structure was rehabilitated and is now prepared for its final stage of repair with the internal coating of its internal transmission pipes. DISCUSSION The scope of this project consists of repairs to the west clear well. They are as follows: Phase I Completion: The west clear well has had the following improvements made: Anew concrete stub wall, new double tee roof with a concrete top; new roof openings. Phase II Task: The west clear well is now scheduled for the following improvements: • Apply a protective coating to the west tank interior transmission pipes. • Power wash support column bases • Clean and disinfect clear well for service BUDGET IMPACT The estimate of probable cost for the Clear Well Rehabilitation Phase II (Pipe Coating) Project is as follows: Construction Contract $ 40,000 Contingency 6,000 Construction Engineering & Inspection 6,000 Total Estimated Project Cost $ 52,000 NOTE: The total remaining balance of funds approved in support of this project through the State Revolving Loan Fund (SRF) is $168,915. This phase of the project will be funded through prior approved monies from the State Revolving Loan Funds. (City Water Department CIP Fund Code 740 1828). RECOMMENDATION I am recommending that the City Council adopt the Resolution approving the Plans, Specifications, Form of Contract and the Estimated Cost for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation Phase II (Pipe Coating) Project. ACTION TO BE TAKEN The City Council is requested to approve the Resolution adopting the Plans, Specifications, Form of Contract and the Estimated Cost for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation Phase II (Pipe Coating) Project. BG:ve Attachments cc: Jenny Larson, Budget Director Jeanne Schneider, City Clerk File 34326 00050-1 RESOLUTION NO. 116-09 EAGLE POINT WATER PLANT CLEAR WELL RESERVOIR REHABILITATION PHASE II (PIPE COATING) PROJECT APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE EAGLE POINT WATER PLANT WEST CLEAR WELL RESERVOIR REHABILITATION PHASE II (PIPE COATING) PROJECT. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation Phase II (Pipe Coating) Project, in the estimated amount of $52,000, are hereby approved. Passed, adopted and approved this 6th day of April, 2009. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, Assistant City Clerk V1 h rOl h--I v ~I w oa H V1 1~1 V a W O O w V o ~ ~ ~ •~ ~ .~ ~ U ~ O -~ ~ ~U ~ O O ~ O o~ ~ ~ O ~ c~ .~~~30 ~ ¢' ~ ~ ~ 3 a• .~ bs U ~ ~ ~ •~ ~ ~ ~ ~ -~s -d Q ... ~, ~ ~ O ~ .-~ 3 ~~1 ,~ ~ ~1 ~ . ~ 3 .~' ~ ~, ~ U Q-' ~ ~ ~ ~ 3 3 bn ~, (~ ~ ~ .~ 0 4, .~ ~ o a~ a; W ~ ~ v °o ~t•~U ~N ~; ~ a~ ~ o ,~~~~N w ~ ~ ~ ~ o'~ ~ ~ ~~~ ~ ~~ N p ~ ci.~' ~ O ~ ~ ~ --i U fs. U "C7 ~i 3 O >-, 0 U U ~ Q Q o 4-~ G." U a 0 ~ I ~~ 0 ~° .~ o a~i ~ ~ U ~ .~ ~ ~ _O O U .'~ Q ~° ,Uy r G~ 0 z ,~ ,.-, Who ~ ~. N W _' CL m m w a w F- E u- ~_ W Z ni ~ ~ ~u 0 Y y E [C E C°.' Qoa ~ U g 4 fl.. - ``AI~I toN cgv~~t°~=~a$$m.csu mS>~~~~aiE~o om ~1~~ > >`~ ~ momEv m.o~ v ~ m 5 3 U m7 O C ~ ~ _ 4 C~.mo ~C7a~° ~ o m w_ ~U ~_~;~ m'c ~,~,~ ma, ~ ~- ~~L o ~,c~ "~~~~ $c~ ~ p~~ ~ ~ r c °'- ~ o ~~ ~« ~ a m-- ~comrmoem ~ ... °. ov c~ _ ar$ w v - 041E°t=-«.~i- 3 3 i,s~Zmtc~3.8v~ m L c~c«~Y °~m~~~~ tc~° ~° y Lmo ~mco'r5 ~ ~-~.~.~~~mm ~` m€ v~FF'o^go ac mUc~4T ~c3 0 0;'0 ~ r~Sra~ ~oc~vB~~aEm$ $ m~ao - «$,w3m ~8 '~ an E ~ adc 3 aim z c coi.c4 a ~ ° o ~ ~_'~ ~U,~ o m a6~m ~5~m m- c D. .~ o .~_ ~v m,~~~'S'g~ m c . c °~ ~~ ~ ~ ~ ~ ~T ° 3 ~ ~ v °m-a .'~. mco° orb cL °c «o 'oTi off. uiv ~ x ~ E u'S `o m L' -°>""->` ~.~ a~~j ~~ g Ro o m••$~ 1Q- a 3-~ ~t m c ~_~ ma~ B ~ 8 ~~rv~~~~ ~ ~~ ~U~ ~~ 9i5«.rjt~~ ~~~~ E >~ 7Z -t' m rn ~ Ev ~'S 3p°~~ =~m~~ _ ~ °~ ~®a° TSffi~o~~m~£o ~cT'3.,~~oV,~ ~om°~ e o o`o~caS$WS~c.. ~`m_-m m ~ mm d oc Wm >:nm~>>~°ac°'L,~c9~ '3~.a~cmmma~>.d.~rb~~ a~'c o ro aoi~~~~~~mm~tOCin~ g!!'~~ W~~am~a~ar°~c~o °' S a~-a L m-m ~i'- o c o nmao~macmz«.m`c.ra~~, cm me c d~E c o>~ ~;E~"~ ~ ~L m `_ aU ~ ~ ~ mm.~o.~cm... ~v °_> > mo flo -~ L tom 3~e ~~m~m ~rt®.oc ~,~°~'~~"'a. u`~ ~0. ~C m o.c aa~cm ~c3' mwo.u'So.o~'vE~ac~G. m :«mc~3~oLLZm ~.~c~• t rre~ n.~.aT.$~w,r~.,3., ..5~ St t rSU O~?S~~o`occ,mmU-_. m~'~ Q g~p~'C~C k{G T•cCCm T C m~6a0`Od ~ ~~r'~S~S~a ~O>O~mm m~~; ~L..V m~~f.. O~ eY ~.~ Su+ ott~,a m ~ z'pp °5~~c ~o.~m>Om0 o~ $`Ys= ~ ~~"OD-7~~~~ ~m~ ~Lmm m~~~Ygy,.~~~~~''' ~-m~~~ ~~V~~ kaffi CC OC pq C ~~o~LCIO ~~ ~ S m >$ 'amg ~>t ~°L- ~Oj 1IIILLLL7 QQQQ...~~y~ ~'C'~d ~.~F.~{p .~ 2S g$ ~z o~ «~~~ }~;~ ~3 ° mN~c a 3v a°.g ~- ~ v+t ~.- ~~d$ 3~~~.~ m ~fs~ ~c o; ~~'~~ E~t;~c~~s oa~ ~E ~«~'oQ&a m~ ~3p ~° ~mc~m ~~ c $ x~ c'; _ ~ ~ ~og« --... '$ m ~'~~: mp ohm « _ _w ~ ~iooiOUinm v ,~ '~- ww ~ ~ 5 `~'~ L o-xL 8! ~ W ffi mvm3m~ F.. '~ ~mro~~"'; ~ ap ~ m~ q r.~ ~~ cLi~Lm o~ ~~,; m~ m ~ ~ ~ .m z ~ o c o o~ 4 °s4~~~ ovZ E m o-°f ~m ~ mm~~~~~ °' ~ ~ ~~.ooE3 m or Tc"c~c~o~~~ 3c~ec ~n 3-- °S~'.> .HY:'~- m.,mm~Y2 _~ m3 m n~mc ~$a~~iommm m p5 .~e00 'au~ ~-or~ ~r ~o me°~ ~~°~.. c :°.o~E.~~., cL~. ~ _E. to~~m ~~m E mw~,cLi+cH~«Ea°yE35'v>OU ~a~a~"~iE >~'Oa3`m~8 m~axi~~.~ va~~Qiv~®°~w3$.°~~ww~<°ia~~'m~83mco~°c~~~~~a aA Z ~ m~m~~~~~5' ~iB ~mao ~ ~'o~o°~~~ ,~~89'$°~a°>c~ma°i ~~~~p~~p~ ~~~~~~~~~o Q LL- O» m m- N F C m N ¢ W ~ 3 E m 3 ~ '~i_=_ c3 ~- ° ~ ~ cU c3- T~ c ~ c yyII~ ~- Z a « m ~$o mdo omc ~ b E~'w a>, tc-- ..i~ccy $ °'E~~ pC1~ ~ J C70 mEa$ ~~~ ~3aQUoQ~ U mm YL~~~...$~vtq`° ~ ~~~b ~ m'$ ~ °.~ p~~1-3 -O=FF «-- e- ° = m ~ u> >Fm--~o T m ma- m g ~-~ m m 3 fs ~ ~^` m `F`<V ~ LaN o a ~~ m y c- a.ffi- cy,~ ~ c p C ~ a~im v.o~ W E ~ m m •° mrX L_ O~~W~. O~W6. ~ ~v m ~~0 ~ ~~ o=QIO~ ~ o m ClQ~Y~t O o5~ ~ ~Y~ T . op ~ ~ m «~ ~ ~L A @~t c d J m m ~~ LL_ v ~a m° o~` ~` v mTi a 3a U~"-~~$.~ ~.mLL«.- ~~~a~~~-a p ~ maV o ESEE o ~ ~ ~n~ L c m w ma io 3 3 ~ .~ ~"~'..~ WO-¢ W~¢~~vw...a-~~ ~mr$ ~aU3~~U ,Lm'o w o-'$~~.._«~~-v -m« $ v.~~; oz .~ao V pdtu Q4 4. m a c m ce ~ w- as o ~-; ~~~ c;=~' c m ~«~ m iv m ~ ~r m ~ ~ - >> J VW~ 0/m y. .. Om~«~~•~ DO m ;m0=O.LwO 3"' t V~.1~ m ~Ow m C~~ O rpn.W g~ m~~.s to 4 $-~'$oY tAOV ~ Elm pooa a.. ~3'~`t~m°,~~~~~m«~~$a=~ ZV~ ~ ¢ Hw oc c~i rL"i ~ `° NocF"i m~o°~ao~.a~ ~~om~~gmo~omo°o~ ~7aonmomm o°mS.c~Ec a Sv~i°~~or.i~3 ~t~~~Nmr3«ioNV-cS ~3un«tn33«o.:.UuN -~a~wo~«oaEwc~~oom..cam a~ ~tAR 24 ~~=~ ~ ~ ~ ~o City ~,~'~~`;'v';~lfa e ~uou~, H O O Mrrs r~l ~+~1 W oa H ~ A ~~s ~~~~ ~~~~ Z~~pp I~ h+~l a O 0 w a W U o ~ ~ ~•~ ~.~ ~ U ~ O ~ ~ 3 4, o ~ 0 vi ~ y o p ~+. ~ U .~ O~ V] c~ .~ ~ ~ ~ ¢• `~ ~ [\ 3 C 'b 69 ~ ~~ ~•~ U ~ ~ ~ a~ '~ -~s (~ .--~ ~ ~ ~ ,~ U ~ x ~ .~ U ~ U ~ ~~~33 H ~ U C~ b~q o Q ~ ~ • r. -z7 ~~~ ~o ~~ Qj ~ U ~ O ,x ~ ~ a~ c~ a ~ ~ ~ a~~'~~~ ~'~ ~~~ N ~ ~ ~ O ~ ~ ~ i--i U S]. U 'G cd 3 0 0 U a' ^~^ ~ L-~ 0 -ts .'., .~ a., Q ~' I ~ ~ 0 ~° -~ U .~ 0 U ~ .~ ~ ~ O 0 U a~ a " Q LLB' "'~° } N }..i W u7 _ ~i--i 2 m m .~ wow H E ",- RS W Z K . ..~ c w o U ]C N E ; r' c, ~ ¢ ~ ~ U ~ g~` 4 <K. d ~~o z 1~H. ~~ ~ m~rn~S ~~ ~~~ ~~ r~~ eo°°g imam mm ~> ~ ~ Zwrsc~e~U~~~'S~s5m~33o~~ ~ ac~r ~m s~~3{s~~t Ur .- 09 BAR 24 a~~~ I I ~ 40 C{~~ lJivi S'. +a lJl1{liE' D~av!~au , IA ~ ~„~ ~, ~. Dubuque ~;~ ~~ ~ ~ ~~° THE CITY OF DIJB E "'"""'~~°y 1 f Masterpiece an the Mississippi m 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Eagle Point Water Plant Clear Well Reservoir Rehabilitation Phase II (Pipe Coating) Project - CIP 7401828 DATE: March 9, 2009 Water Department Manager Bob Green is recommending authorization of the bidding procedure for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation Project, recommending preliminary approval of the plans and specifications, and establishing April 6, 2009 as the public hearing date. concur with the recommendation and respectfully request Mayor and City Council approval. ~,. Mi hac el C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Bob Green, Water Department Manager THE CITY OF Dubuque DT TTY ~ All-AmedcaCity LJ j,1 ' ' Masterpiece on the Mississippi 2007 March 6, 2009 TO: Michael C. Van Milligen, City Manager FROM: Bob Green, Water Department Manager SUBJECT: Eagle Point Water Plant Clear Well Reservoir Rehabilitation Phase II (Pipe Coating) Project - CIP 7401828 INTRODUCTION: The enclosed Resolutions authorize the public bidding procedure for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation Project. BACKGROUND: The Eagle Point Water Plant provides the City with its potable water. After the water is treated and filtered it is stored in two clear wells located at the Water Plant before being pumped into the water distribution system. The west clear well was constructed in 1880 and has a storage capacity of 650,000 gallons. This clear well was built using large lime stone blocks for the floor and walls. A concrete roof was added several years later. Since its construction, the interior piping has developed corrosion requiring them to be cleaned and coated. Earlier this year, Phase I of this project focused on the structure being rehabilitated and now is prepared for its final stage of repair with the internal coating of its transmission pipes. OBJECTIVE: The main objective of Phase II of the project is the internal coating improvements to the pipes and additional cleaning to the west clear well. PROJECT SCHEDULE: The schedule for the project is as follows: Initiate Public Bidding Process March 16, 2009 Publish Notice to Bidders, Advertise for Bids March 20, 2009 Publish Public Hearing Notice on Plans & Specifications March 20, 2009 Public Hearing on Plans & Specifications April 6, 2009 Receipt of Bid Proposals (Bid letting) April 8, 2009 Award Construction Contract April 20, 2009 Project Completion Date May 29, 2009 RECOMMENDATION: It is recommended that the City Council give preliminary approval to the construction plans and specifications for the Eagle Point Water Plant Clear Well Reservoir (Phase II Pipe Coating) Rehabilitation Project, and to establish the date of April 6, 2009 for the public hearing and hereby authorize the City Clerk to advertise for bid proposals. BUDGET IMPACT: The estimate of probable cost for the Clear Well Rehabilitation Pipe Coating Project is summarized as follows: Estimate: Construction Contract $ 40,000 Contingency 6,000 Construction Engineering & Inspection 6,000 Total Estimated Rehabilitation Coating Cost $ 52,000 The interior coating to the west tank transmission pipes was scheduled to take place under a separate contract immediately following completion of the construction rehabilitation to the structure of this tank. The following fund summary is as follows: Funding for this project has been secured through prior approval of a state revolving loan fund. CIP NO. FUND DESCRIPTION FUND BALANCE AMOUNT 7401828 Clear Well Rehabilitation Project $168,915 ACTION TO BE TAKEN: The City Council is requested to establish the date of the Public Hearing and to authorize the City Clerk to advertise for proposals through the adoption of the enclosed Resolutions. Prepared by Bob Green, Water Department Manager cc: Jenny Larson, Budget Director Ken TeKippe, Finance Director File RESOLUTION NO. EAGLE POINT WATER PLANT CLEARWELL RESERVOIR REHABILITATION PHASE II (PIPE COATING) PROJECT PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the Eagle Point Water Plant Clear Well Rehabilitation Project, in the estimated amount of $52,000, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. A public hearing will be held on the 6th day of April, at 6:30 p.m. in the Historic Federal Building Council Chambers at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. The Eagle Point Water Plant Clear Well Rehabilitation Phase II (Pipe Coating) Project is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four but not more than forty-five days before the date for filing bids before 2:00 p.m. on the 8th day of April at 6:30 p.m. .Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at the public hearing at 6:30 p.m. on the 20th day of April, in the Historic Federal Building Council Chambers (Second Floor), 350 West 6th Street, Dubuque, Iowa. Passed, adopted and approved this day of , 2009. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE EAGLE POINT WATER PLANT CLEARWELL RESERVOIR PHASE II REHABILITATION PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation Project, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 6th day of April, 2009, in the Historic Federal Building Council Chambers (Second Floor) 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: • West Clear Well: Epoxy coating sealant on the inner pipes and power wash column support bases in the west clear well. • West Clear Well: Clean and disinfect clear well reservoir for service. Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the day of , 2009. Passed, adopted and approved this day of , 2009. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT EAGLE POINT WATER PLANT CLEAR WELL RESERVOIR PHASE ll PIPE COATING REHABILITATION PROJECT Time and Place for Filing Sealed Proposals. Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on April 8, 2009, in the Office of the City Clerk, City Hall -First Floor, 50 West 13t" Street, Dubuque, Iowa. Time and Place Sealed Proposals will be Opened and Considered. Sealed proposals will be opened and bids tabulated at 2:00 p.m. on April 8, 2009, at City Hall - Conference Room B, 50 West 13t" Street, Dubuque, Iowa, for consideration by the City Council (Council) at its meeting on April 20, 2009. The City of Dubuque, Iowa, reserves the right to reject any and all bids. Time for Commencement and Completion of Work. Work on the west clear well tank shall be commenced after award of the Notice to Proceed. Substantial completion of work on the West Clear Well shall include completion of the sandblasting, pipe coating and disinfection of the tank. The West Clear Well work shall be completed by May 29, 2009. Bid Security. Each bidder shall accompany its bid with a bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be in the amount of ten percent (10%) of the amount of the contract and shall be in the form of a cashier's check or certified check drawn on astate-chartered or federally chartered bank, or a certified share draft drawn on astate-chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satisfactory to the governmental entity. The bid bond shall contain no conditions excepted as provided in this section. Contract Documents. Copies of the construction documents may be obtained from Veenstra & Kimm, Inc., 3000 Westown Parkway, West Des Moines, Iowa 50266, phone (515) 225-8000, upon deposit of $25.00 per set. No refund will be made. Preference for Iowa Products and Labor. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. 34326 00050-1 RESOLUTION NO. EAGLE POINT WATER PLANT CLEAR WELL RESERVOIR REHABILITATION PHASE II (PIPE COATING) PROJECT APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE EAGLE POINT WATER PLANT WEST CLEAR WELL RESERVOIR REHABILITATION PHASE II (PIPE COATING) PROJECT. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation Phase II (Pipe Coating) Project, in the estimated amount of $52,000, are hereby approved. Passed, adopted and approved this day of , 2009. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, City Clerk 34326 00050-1 SRF. Bidders will be required to comply with the President's Executive Order No. 11246. The requirements for bidders and contractors under this order are explained in the Federal grant documents. Bidders will be required to take affirmative steps to involve Minority Business Enterprise (MBE) and Women's Business Enterprise (WBE) in the work under the contract. Bidders shall complete the applicable certification attached to the proposal. The certification shall include a listing of MBEs and WBEs, the work and estimated dollar amount to be performed by each such enterprise, and the percentage of the total bid to be used for minority or women's business enterprise(s). The bidder commits itself to the goals for MBE/WBE participation contained herein and all other requirements, terms and conditions of these bid conditions when it submits a properly signed bid. Any bidder or equipment supplier whose firm or affiliate is listed in the GSA publication "List of Parties Excluded from Federal Procurement and Nonprocurement Programs" will be prohibited from the bidding process. Anyone submitting a bid who is listed in this publication will be determined to be a nonresponsive bidder in accordance with 40 CFR Part 31. A Contractor's Suspension/Debarment Certification will be contained in the specifications; however, this certification should not preclude any interested party from ascertaining whether the certifying person is actually on the "List of Parties Excluded from Federal Procurement and Nonprocurement Programs". Payment of the cost of said project will be made from any one or a combination of the following sources at the sole discretion of the City Council: (1) cash to be derived from the proceeds of the issuance and sale of Sewer Revenue Bonds, which will be payable solely and only out of the future net revenues of the Municipal Sewage Utility, and/or from such other cash funds on hand of said Utility as may be lawfully used for said purpose; (2) cash derived from the proceeds of the issuance and sale of General Obligation Bonds of said City; (3) cash from such general funds of said City as may be legally used for such purpose; (4) cash from proceeds of a State Revolving Loan fund; and (5) cash from public facilities set-aside fund. 34326 00050-2 General Nature of Public Improvement. Eagle Point Water Plant Clear Well Reservoir Phase II Pipe Coating Rehabilitation Project CIP 7401828 The scope of this project consists of sandblast and removal of the bitumunious coating of interior piping and pipe stubs, surface preparation and application for coating of the interior piping and pipe stubs, and cleaning of bitumastic coating from the wedding cake foundations in the West Clear Well. Clean and disinfect West Clear Well for service. 34326 00050-1