Loading...
Stormwater Mgmt HDR Work Session ReportMEMORANDUM December 5, 2002 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Stormwater Management WORKSESSION December 9, 2002 The worksession on stormwater management with a presentation by HDR Engineering will be held on December 9, 2002 at the Dubuque Carnegie-Stout Public Library's third- floor auditorium. Dinner will be served at 5 p.m. in the rotunda with the worksession beginning at 5:30 p.m. Background materials are attached. A copy of the Drainage Basin Master Plan was previously distributed. MCVM/ksf Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Mike Koch, Public Works Director Gus Psihoyos, Assistant City Engineer City of Dubuque City Council Work Session December 9, 2002 Storm Water Management Bee Branch Drainage Basin Improvements I-DR rrm Presentation Outline Council Interview Common Themes · Describe Alternative Selection Process · Solve Upstream to Greatest Extent · Urban Conservation/Suste/nable Design · Maximize West 32nd Street Detention Cell · Hydrologic Assumptions/1999 Experience · Publ/c Outreach/Information Fair ~' Show a Channel Alignment/lq[ow Would it Look? · Storm Water Management Overview · Bee Branch Drainage Basin - West 32nd Street Subarea · Where We Go From Here Tools to Manage Storm Water · Runoff Reduction · ImSltmtion Control · Restrict Development · Timing Changes · Storage · Dete~fion · Increase Capacity Master Planning Process Input Bee Branch Drainage Basin Bee Branch Drainage Basin Bee Branch Drainage Basin Flood Inundation - Existing System Bee Branch Drainage Basin Flood Minimization Alternative Improvements West 32nd Street Subarea West 32nd Street Drainage Subarea Alternatives Evaluated - ] 00-Year West 32nd Street Drainage Subarea Detention Site Alternatives 2 West 32nd Street Subarea Alternative Evaluation No. (miltlons) Remaining Bee Branch Drainage Subareas Bee Branch Drainage Basin Flood Inundation- 100 Year Remaining Bee Branch Drainage Subareas Detention Site Alternatives Bee Branch Findings Before Alternatives Were Developed Operating Conditions 3 Bee Branch Drainage Basin Flood Minimization Alternative Improvements Bee Branch Drainage Basin Open Channel Floodway Alternative Examples of Open Channels in an Urbanized Area Conceptual Rendering of an Open Channel in Dubuque Where We Go From Here Alignment Development · Information Gathering/Public Outreach · Coreauu~ty impacts Determination 4 MEMORANDUM November 7, 2002 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Stormwater Study - HDR The work ~ession with HDR on the Stormwater Management Study is scheduled for 5:30 p.m., Monday, December 9, 2002, in the Library Auditorium. Dinner will be served at 5:00 p.m. in the 3rd floor staff lounge. · While this is highly unusual, I have asked HDR to call Council Members and find out about potential questions over the phone or set up an in-person meeting so that HDR will be better prepared for the work session. As of now, I have asked HDR to make a 30 minute presentation about the study and the options considered. They might go longer to incorporate information on questions that have been asked. The remainder of the work session would be questions and answers. have attached historical information, including the study. Michael C. Van Milligen MCVM/jh Attachments cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Pauline Joyce, Administrative Services Manager Mike Koch, Public Works Director Gus Psihoyos, Assistant City Engineer