Loading...
HDR presentation documents City of Dubuque City Council Work Session December 9, 2002 Storm Water Managem~t Bee Branch Drainage Basin Improvements I-DR rrm Council Interview Common Themes · Describe Alternative Selection Froeess · ~ Solve Upstream to Greatest Extent · Urban Conservation/Sustainable Design · Maximize West 32nd Street Detention Cell · Hydrolo~c Assumptions/1999 Experience · Public Outreacb/hfformation Fair · Show a Channel Alignmeaffttow Would it Look? Presentation Outline · Storm Water Management Overview · Bee Branch Drainage Basin · West 32ud Street Subare~ · Where We Go From Here Tools to Manage Storm Water Runoff Reduction Timing Changes Storage Increase Capacity Master Planning Process lnput Bee Branch Drainage Basin ] 2 Bee Branch Drainage Basin Bee Branch Drainage Basin Flood Inundation - Existing System Bee Branch Drainage Basin Flood Minimization Alternative Improvements 3 West 32nd Street Subarea West 32nd Street Drainage Subarea ] 00-Year Alternatives Evaluated West 32nd Street Drainage Subarea Detention Site Alternatives 4 West 32nd Street Subarea Alternative Evaluation Alt Description Capital Cost No. (millions) Con,meats Bee Branch Drainage Basin 100-Year Flood Inundation Remaining Bee Branch Drainage Subareas Remaining Bee Branch Drainage Subareas Detention Site Alternatives Bee Branch Findings Before Alternatives Were Developed Operating Conditions 6 Bee Branch Drainage Basin Flood Minimization Alternative Improvements Bee Branch Drainage Basin Open Channel Floodway Alternative Examples of Open Channels in an Urbanized Area 7 Conceptual Rendering of an Open Channel in Dubuque Where We Go From Here Alignment Development Information Gathering/Public Outreach Commm~t~ Impacts Der erm[uation