Ice Harbor Maintenance Dredging_Flood Control Gates Project AcceptanceRESOLUTION NO. 638-02 ACCEPTING IMPROVEMENT Whereas, the contract for the 2002 Maintenance Dredging Project - Ice Harbor Flood Control Gate Structure has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the General Fund and the 1% Local Option Sales Tax Fund in amount equal to the amount of his contract, less any retained pementage provided for therein. Passed, approved and adopted this 16th day ofDecember , 2002. Terrance M. Duggan, Mayor Karen M. Chesterman, Deputy City Clerk RESOLUTION NO. 639-02 FINAL ESTIMATE Whereas, the contract for the 2002 Maintenance Dredging Project - Ice Harbor Flood Control Gate Structure has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $113,001.00 and the said amount shall be paid from the General Fund and the 1% Local Option Sales Tax Fund of the City of Dubuque, Iowa. Passed, approved and adopted this 16th day of December ,2002. Terrance M. Duggan, Mayor Attest: Karen M. Chesterman, Deputy City Clerk PURPOSE: ICE HARBOR GATES MAINTENANCE DREDGING 2002 City of Dubuque - Engineering Division Final Payment Form PAYMENT NO: Council Final DATE: 2~-Nov-02 PROJECT NAME: 2002 Maintenance Dredging Project Ice Harbor Flood Control Gate Structure CONTRACT AMOUNT: $89,950.00 CONTRACTOR: J.F. BRENNAN COMPANY, INC. BID ITEM UNIT UNIT COST QUANTITY AMOUNT EARNED TO DATE TO DATE 1 Mobilization and Demobilization LUMP SUM $18,400.00 1.0 $18,400.00 2 Mechanical Dredging Ice Harbor Flood Control Gate Structure Cu. Yd. $8.50 10650.00 $90,525.00 3 Survey, Pre - Post Dredge Cress Sections LUMP SUM $1,000.00 1.0 $1,000.00 TOTAL DUE CONTRACTOR: ENGINEERING: TOTAL CONSTRUCTION COST: $t09,925.00 [ $3,076.00 [ .3,oo .oo CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager City of Dubuque, Io~/v~ Michael A, Koch, Public Works Director City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, ~,,~ ~/~'~rl,"/~',~i/ _/t~ ~./~, cont~or for the above improvement, does hereby a~ept the above '~cta[ Due Contra~or", as full se~[ement for all claims for said improvement. ,, TITLE: y/~ ~/~ ~ MEMORANDUM December 10, 2002 TO:The Honorable Mayor and City Council Members FROM:Michael C. Van Milligen, City Manager SUBJECT:2002 Maintenance Dredging Project Ice Harbor Flood Control Gate Structure Public Works Director Mike Koch is recommending acceptance of the construction contract for the 2002 Maintenance Dredging Project - Ice Harbor Flood Control Gate Structure, as completed by J.F. Brennan Company, in the final contract amount of $109,925, which is 22.2% over the original contract of $89,950. Since the bid for this project came in at $2.50 per cubic yard less than estimated, it was decided to remove 10,650 cubic yards of dredge material, instead of the originally planned 8,300 cubic yards of dredge material. This project will be funded from the remaining balance of $42,200 in the Harbor Maintenance Dredging Capital Improvement Program, a carryover balance from Fiscal Year 2001 for Ice Harbor Gates Dredging in the amount of $51,400, and $20,000 from the FIoodwall Post Flood Repair Program, budgeted in the Operations and Maintenance Department, for a total available budget of $113,600. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM December 10, 2002 TO:Michael C. Van Milligen, City Manager FROM:Michael A. Koch, Public Works Director SUBJECT:2002 Maintenance Dredging Project Ice Harbor Flood Control Gate Structure INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the 2002 Maintenance Dredging Project - Ice Harbor Flood Control Gate Structure. DISCUSSION The project involved the removal of 10,650 cubic yards of silt and sand deposits that have accumulated along the river bottom outside of the Ice Harbor Gates. This sediment removal should reduce the annual cleaning costs of the silt of the Ice Harbor Gates. The sediment, which was removed upstream in front of the River's Edge Plaza will also improve docking access of the large excursion vessels, such as the Delta Queen and the American Queen. The 2002 Maintenance Dredging Project - Ice Harbor Flood Control Gate Structure has been completed by J.F. Brennan Company of LaCrosse, Wisconsin, in the final contract amount of $109,925, which is a 22.2% increase from the original contract of $89,950. Based upon anticipated unit costs for dredging, the project was specified to remove approximately 8,300 cubic yards of dredge material. The quantity to be dredged was based upon the available budget, even though there was additional dredge material, 12,500 cubic yards, which could have been removed to reach the intended base elevation. Since the bid come in $2.50 per cubic yard les than estimated, it was decided to remove the remaining dredging material under this contract rather than to initiate another dredging contract for the remainder of the material. RECOMMENDATION I would recommend that the City Council accept the improvement and recommend that the final contract amount be established at $109,925.00. BUDGET IMPACT The construction cost for the 2002 Maintenance Dredging Project - Ice Harbor Flood Control Gate Structure is as follows: Bid Award Final Dredging Contract $ 98,300.00 $89,950.00 $109,925.00 Contingency 9,800.00 9,800.00 0 Engineering & Inspection 5,400.00 5,400.00 3,076.00 Total Project Cost $113,500.00 $105,150.00 $113,001.00 The project wilt be funded from the remaining balance amount of $42,200 under the Harbor Maintenance Dredging Capital Improvement Program, a carryover balance from Fiscal Year 2001 for Ice Harbor Gates Dredging in the amount of $51,400, and $20,000 from the FIoodwall Post Flood Repair Program, budgeted in the Operations and Maintenance Department, for a total available budget of $113,600. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final contract amount. Prepared by Bob Schiesl, Civil Engineer cc: Pauline Joyce, Administrative Services Manager Don Vogt, Operations & Maintenance Manager John Klosterman, Operations & Maintenance Supervisor Tom Mack, US Army Corps of Engineers