Loading...
Signed Contract_Kephart Building Improvement Additional Services #3THE CITY OF DUBUQUE Masterpiece on the Mississippi Dubuque All-American City 2007 TO: Michael C. Van Milligen, City Manager FROM: Steve Sampson Brown, Project Manager DATE: April 17, 2009 SUBJECT: Kephart Building Improvement Project CIP 3601976 INTRODUCTION This memo is to request approval on Additional Services Agreement No. 3 from Durrant on the Kephart Building Improvement Project. DISCUSSION It is recommended that Durrant be retained to provide design and construction administration services for the following: - Informational technology system design. During the design phase, it was determined that the City's Information Systems Department will provide network connectivity to the building. - Security system design. After considering the amount of technical equipment that will be located within the multicultural center, aloes-cost motion sensing alarm system is recommended. - Modification to the roof design in order to accommodate the installation of renewable energy technologies. The cost of Durrant's professional services is estimated to be $15,000.00. The cost of this work was included in the budget that was provided to the City Council for the award of the construction contract. ACTION TO BE TAKEN Your execution and approval of the attached Durrant's Request for Additional Services No. 3 is requested. cc: Jenny Larson, Budget Director Attach. K:IPROJECTSIKephart Building Improvements\Correspondence\2009 04-17-09 MVM Memo re Durrant Request for Additional Services No. 3.doc REQUEST FOR ADDITIONAL SERVICES N0.3 09082.00 MARCH 23, 2009 PAGE 2 OF 2 If this proposal meets with your approval, kindly execute the following Acceptance and return one signed copy to Durrant. Should you have any questions, please do not hesitate to contact us. ACCEPTANCE SIGNATURES Durrant Signature ~ Signature Kevin (. Eipperle, AIA, LEED®AP Name Name Principal in Charge Title Title March 23, 2009 Date Date KjE/ag cc: L. Eichhorn, M. Pasker, C. Monk C:\Doavnrnts and Settings\ngilmore\Local Settings\Tcmponry• Intctnet FBes\ContcntAutlook\1'G8I3ASF\Additional Sendces 3.doc DURRANT' 400 Ice Harbor Drive Dubuque, IA 52001 T 563.583.9131 F 563.557.9078 www.durrant.com Architecture Engineering Planning Project Deliver Financing Interior Design Graphic Design REQUEST FOR ADDITIONAL SERVICES NO. 3 March 23, 2009 Steve Sampson Brown City of Dubuque 50 West 13th Street Dubuque, Ir1 52001 Project: Kephart Building Improvement Project Project Number: 09082.00 Dear Steve: In accordance with our recent discussions, we are pleased to provide additional professional services as outlined below: Design and construction administration services fox the IS/IT and security changes and Sustainability changes for the Kephart building project. 1. IS/IT for City of Dubuque network connections 2. Security System implementation 3. r~ccommodation of installation of a solar thin film over the member roof with capabilities for net metering. 4. Increased insulation thickness and values at walls and roof. This effort is limited to: 1. Survey and meeting time spent investigating the oppoi~tunties. 2. Design changes resulting from the roof, wall and electrical requests. 3. Development of addenda to cover these items. 4. Construction administration. 5. Cost estimating, if required. Denver, CO Des Moines, IA Dubuque, IA Hilo, HI Honolulu, HI Madison, WI Phoenix, AZ St. Louis, MO Tucson, AZ To accomplish the above-described professional senrices, we propose hourly fees. Reason for additional Services: Owner requested This Request for ildditional Services will be itemized separately on your next invoice for your convenience. C:\Docwnrnts and Setting+\agBmore\Local Settings\Temponry• Internet FBes\Contrnt.0udook\1'6$13_~SF\Additional Serttices 3.doc Dubuque FY08 Hourly Rate Schedule Classification Hourlv Rate Managing Principal $210.00 Client Advocate $160.00 Director of Structural Engineering $190.00 Principal $150.00 Project Manager $110.00 Architect II $105.00 Architect I $95.00 Manager of Structural Engineering $130.00 Structural Engineer $120.00 Mechanical Engineer $120.00 Electrical Engineer $120.00 Civil Engineer $120.00 Construction Project Manager $85.00 Designer I $80.00 Designer II $85.00 Designer III $95.00 Cost and Schedule Manager $90.00 Specification Writer $95.00 Interior Designer I $60.00 Interior Designer II $100.00 Technician $50.00 Administrative $80.00 - Clerical $50.00 P:\Projects\WP\MASTERS\MISC\Contracts\FY08 Classification Billing Rates