Loading...
Parking Ramp Conceptual Design and Cost Estimate_Technical Appendix 5 4 09Technical Appendix Parking Ramp-Conceptual Design and Cost Estimate City of Dubuque Dubuque, Iowa THE CITY OF DUBUQUE Showing the Spirit DESMAN ASSOCIATES Parking Ramp Conceptual Design and Cost Estimate for Downtown Dubuque Dubuque, Iowa Final Report April, 2009 Technical Appendix Table of Contents Parking Ramp-Conceptual Design and Cost Estimate City of Dubuque Dubuque, Iowa Appendix A-Aerial Photographs Fifth and Bluff Site Ninth Street Site Fifth and 1Vlain Site Appendix B-Site Photographs-Fifth and Bluff Site Appendix C- Site Photographs-Ninth Street Site Appendix D-Alternative Sites Preliminary Assessment Appendix D-1-Fifth and Bluff-Alternative Concepts Appendix D-2-Ninth and Central Site-Alternative Concepts Appendix D-3-Locust, Fifth and Main Site-Alternative Concepts Appendix D-4-Iowa Street Ramp-Alternative Concepts Appendix E-Cost Estimates for Alternative Concepts Appendix E-1-Cost Estimates for Final Concepts Fifth and Main Site Ninth and Central Site Appendix E-2-Cost Estimates for Recommended Concept at Main Street-5~'to 7~' Site Parking Ramp Conceptual Design and Cost Estimate for Downtown Dubuque Dubuque, Iowa Final Report-Apri12009 Appendit A Aerial Photographs- Fifth/Bluff Site Ninth Street Site/ City of Dubuque Dubuque, Iowa THE CITY OF DUBUQUE Showing the Spirit DESMAN ASSOCIATES Parking Ramp Conceptual Design and Cost Esimate for Downtown Dubuque Dubuque, Iowa Final Report April, 2009 5th Street Parking Ramp 9th Street Parking Ramp Main street Ramp Site Appendix B Site Photographs- Fifth/Bluff Site City of Dubuque Dubuque, Iowa THE CITY OF DUBUQUE Showing the Spirit DESMAN ASSOCIATES Parking Ramp Conceptual Design and Cost Estimate for Downtown Dubuque Dubuque, Iowa Final Report April, 2009 Appendix C Site Photographs- Ninth Street Site City of Dubuque Dubuque, Iowa THE CITY OF DUBUQUE Showing the Spirit DESMAN ASSOCIATES Parking Ramp Conceptual Design and Cost Estimate for Downtown Dubuque Dubuque, Iowa Final Report April, 2009 Appendix D Alternative Concepts Preliminary Assessment City of Dubuque Dubuque, Iowa THE CITY OF DUBUQUE Showing the Spirit DESMAN ASSOCIATES Parking Ramp Conceptual Design and Cost Estimate for Downtown Dubuque Dubuque, Iowa Final Report April, 2009 Appendix D-1 Fifth and Bluff Alternative Concepts City of Dubuque Dubuque, Iowa THE CITY OF DUBUQUE Showing the Spirit DESMAN ASSOCIATES Parking Ramp Conceptual Design and Cost Estimate for Downtown Dubuque Dubuque, Iowa Final Report April, 2009 CITY OF DUBUQUE DUBUQUE, IOWA CITY OF DUBUQUE DUBUQUE, IOWA CITY OF DUBUQUE DUBUQUE, IOWA CITY OF DUBUQUE DUBUQUE, IOWA CITY OF DUBUQUE DUBUQUE, IOWA CITY OF DUBUQUE DUBUQUE, IOWA Appendix D-2 Ninth and Central Site Alternative Concepts City of Dubuque Dubuque, Iowa THE CITY OF DUBUQUE Showing the Spirit DESMAN ASSOCAITES Parking Ramp Conceptual Design and Cost Esimate for Downtown Dubuque Dubuque, Iowa Final Report April, 2009 CITY OF DUBUQUE DUBUQUE, IOWA CITY OF DUBUQUE DUBUQUE, IOWA CITY OF DUBUQUE DUBUQUE, IOWA CITY OF DUBUQUE DUBUQUE, IOWA CITY OF DUBUQUE DUBUQUE, IOWA CITY OF DUBUQUE DUBUQUE, IOWA Appendix D-3 Locust-Fifth and Main Site Alternative Concepts City of Dubuque Dubuque, Iowa THE CITY OF DUBUQUE Showing the Spirit DESMAN ASSOCIATES Parking Ramp Conceptual Design and Cost Esimate for Downtown Dubuque Dubuque, Iowa Final Report April, 2009 Appendix D-4 Iowa Street Ramp Alternative Concepts City of Dubuque Dubuque, Iowa THE CITY OF DUBUQUE Showing the Spirit DESMAN ASSOCIATES Parking Ramp Conceptual Design and Cost Estimate for Downtown Dubuque Dubuque, Iowa Final Ramp April, 2009 Appendix E Cost Estimates for Alternative Concepts City of Dubuque Dubuque, Iowa THE CITY OF DUBUQUE Showing the Spirit DESMAN ASSOCIATES Parking Ramp Conceptual Design and Cost Estimate for Downtown Dubuque Dubuque, Iowa Final Report April, 2009 Appendix E-1 Cost Estimates for Final Concepts - Fifth and Main Site -Ninth and Central Site City of Dubuque Dubuque, Iowa THE CITY OF DUBUQUE Showing the Spirit DESMAN ASSOCIATES Parking Ramp Conceptual Design and Cost Estimate for Downtown Dubuque Dubuque, Iowa Final Report April, 2009 DESMAN ASSOCIATES OPINION OF PROBABLE CONSTRUCTION COST Conceptual Design Dubuque, IA March 11, 2009 Parking Garage Slab-On-Grade 45,000 Office Retail 0 Supported Slab 310,000 Total Garage Square Feet 355,000 Capacity 1,097 Efficiency 324 Division of Work Probable Construction Cost 01000 General Conditions 5% $ 748,713 02000 Site Clearing/Demo/Foundations $ 1,750,000 02000 Hard Scape (Sidewalk and Curbing) $ 200,000 02000 Utility Relocation $ 415,000 03300 Concrete $ 7,700,000 03400 Facade $ 2,100,000 05000 Misc. Metals $ 250,000 07000 Moisture Protection $ 150,000 08000 Doors & Windows $ 100,000 09000 Finishes $ 200,000 10000 Signage $ 100,000 11000 Revenue Control $ 300,000 14000 Conveying System $ 520,000 15000 HVAC/Plumbing/FP $ 301,750 16000 Electrical $ 887,500 Sub Total $ 15,722,963 ContractorProfat & Overhead 1 Q% $ 1,572,296 Contingency/Administration 10% $ 1,572,296 A&E Design Fee 6% $943,378 Reimbursables/Testing $100,000 Acquisition C&JBig10 $272,800 Total Opinion of Cost $ 20,1$3,733 Cost Per Cat- $ 18,399 Alt. #1 Renewable Energy Component $200,000 Alt. #2 Vehicle Charging Stations $100,000 Alt. #3 Fire Suppression $355,000 1. Since the Engineer has no control over the cost of labor, materials, or equipment, or over they contractor's methods of determining prices, or over competitive bidding or market conditions, opinions of probable cast, as provided above, are made on the basis of experience and qualifications of the Engineer and represent the best judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or the construction cost will not vary from opinions of probable cost as shown above. 2. Environmental remediation is not included in above estimate if required. DESMAN ASSOCIATES OPINION OF PROBABLE CONSTRUCTION COST Maui St. {5th tc~ 7th) 9001vet Add Conceptual Design Dubuque, IA March 11, 2009 Parking Garage Slab-On-Grade 33,500 Office Retail 22,500 Supported Slab 292,000 Total Garage Square Feet 348,000 Capacity 985 Efficiency 330 Division of Work P robable Construction Cost 01000 General Conditions 5% $ 811,790 02000 Site Clearing/Demo/Foundations $ 1,650,000 02000 Hard Scape (Sidewalk and Curbing) $ 175,000 02000 Utility Relocation $ 25,000 03300 Concrete $ 7,400,000 03400 Facade $ 2,100,000 05000 Misc. Metals $ 350,000 07000 Moisture Protection $ 150,000 08000 Doors & Windows $ 500,000 09000 Finishes $ 1,800,000 10000 Signage $ 100,000 11000 Revenue Control $ 300,000 14000 Conveying System $ 520,000 15000 HVAC/Plumbing/FP $ 295,800 16000 Electrical $ 870,000 Sub Total $ 17,047,590 ContractorProfat & Overhead 10% $ 1,704,759 Contingency/Adnaintstration 10% $ 1,704,759 A&E Design Fee 6% $1,022,855 Reimbursables/Testing $100,000 Acquisition United Way $1,100,000 Total Opinion of Cost ~ 22,679,963 Cost Per Car $ 23,025 Alt. #1 Renewable Energy Component $200,000 Alt. #2 Vehicle Charging Stations $100,000 Alt. #3 Fire Suppression $348,000 Alt. #4 Ped Walkway at Grade $250,000 1. Since the Engineer has no control over the cost of labor, materials, or equipment, or over they contractor's methods of determining prices, or over competitive bidding or market conditions, opinions of probable cast, as provided above, are made on the basis of e;q~erience and qualifications of the Engineer and represent the best judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or the construction cost will not vary from opinions of probable cost as shown above. 2. Enviormental remediation is not included in above estimate if required. DESMAN ASSOCIATES OPINION OF PROBABLE CONSTRUCTION COST Maui St. (nth to 7th) 900 Net Add Conceptual Design Dubuque, IA March 23, 2009 Parking Garage Slab-On-Grade 33,500 Office Retail 22,500 Supported Slab 292,000 Total Garcxge Squcxre Feet 348,000 Capacity 985 Efficiency 330 Division of Work Probable Construction Cost 01000 General Conditions 5% $811,790 02000 Site Clearing/Demo/Foundations $1,650,000 02000 Hard Scape (Sidewalk and Curbing) $175,000 02000 Utility Relocation $25,000 03300 Concrete $7,400,000 03400 Facade $2,100,000 05000 Misc. Metals $350,000 07000 Moisture Protection $150,000 08000 Doors & Windows $500,000 09000 Finishes $1,800,000 10000 Signage $100,000 11000 Revenue Control $300,000 14000 Conveying System $520,000 15000 HVAC/Plumbing/FP $295,800 16000 Electrical $870,000 Sub Total $17,047,590 ContrcrctorProfit & Overhead 10% $1,704,759 Contingency/Admintstrcztion 10% $1,704,759 A&E Design Fee 8% $1,363,807 Reimbursables/Testing $100,000 Acquisition United Way $1,700,000 Alt. #1 Renewable Energy Component $200,000 Alt. #2 Vehicle Charging Stations $100,000 Alt. #3 Fire Suppression $348,000 Alt. #4 Ped Walkway at Grade $250,000 Total Opinion of Cost $24,518,915 Cost Per Car $24,892 1. Since the Engineer has no control over the cost of labor, materials, or equipment, or over the contractor's methods of determining prices, or over competitive bidding or market conditions, opinions of probable cost, as provided above, are made on the basis of experience and qualifications of the Engineer and represent the best judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or the construction cost will not vary from opinions of probable cost as shown above. 2. Environmental remediation is not included in above estimate if required. Appendix E-2 Cost Esimate Recommended Concept at Main Street Site- 5th to 7th Streets City of Dubuque Dubuque, IOwa THE CITY OF DUBUQUE Showing the Spirit DESMAN ASSOCIATES Parking Ramp Conceptual Design and Cost Esimate for Downtown Dubuque Dubuque, Iowa Final Report April, 2009 Appendix F Site Survey Fifth and Bluff Site Ninth Street Site Main- Fifth to Seventh Site City of Dubuque Dubuque, Iowa The city of Dubuque Showing the Sprit DESMAN ASSOCIATES Parking Ramp Conceptual Design and Cost Esimate for Downtown Dubuque Dubuque, IOwa Final Report April, 2009