Loading...
11th Street Steps & Grove Terrace Retaining Wall ProjectTO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 11th Street Steps & Grove Terrace Retaining Wall Reconstruction Project CIP: 3002072 -Grove Terrace Retaining Wall DATE: May 12, 2009 City Engineer Gus Psihoyos is recommending acceptance of the 11t" Street Steps and Grove Terrace Retaining Wall Reconstruction Project, as completed by Portzen Construction, Inc. in the final contract amount of $635,536.59, which is a 7.9% increase from the original contract in the amount of $589,175.50. The additional cost is primarily due to the need to use new limestone rather than salvaged. limestone.. It was discovered_when the wall was. taken .down that. the limestone facing was primarily a facade layer and was not suitable in most cases to re- use in the reconstruction of the retaining wall. I concur with the recommendation and respectfully request Mayor and City Council approval. s ~tl._ ichael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY C)F UbUgU _, - ~- .,~ -., _..., N,C~zster~aiece ~~ tl~~ IV.~issi~sip~i ~; 2007 TO: Michael C. Van Milligen, City Manager,..-~~~-~--~z,~ ~° '~ FROM: Gus Psihoyos, City Engineer ;~~~ I `~~ °~ DATE: May 12, 2009 SUBJECT: 11t" Street Steps & Grove Terrace Retaining Wall Reconstruction Project CIP: 3002072 -Grove Terrace Retaining Wall INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 11t" Street Steps & Grove Terrace Retaining Wall Reconstruction Project. BACKGROUND In July, 2008, the City Council awarded the 11t" Street Steps & Grove Terrace Retaining Wall Reconstruction Project to Portzen Construction, Inc. of Dubuque, Iowa. The project included the installation of concrete backfill and geofoam blocks to limit the stresses on the new retaining wall and to allow the reuse of a significant portion of the existing limestone block. The project also included installation of reinforced concrete over the .existing 11t" Street stairs arch to stabilize the arch. The section of Grove Terrace around the stairs was reconstructed with 7" concrete pavement with integral curb and gutter. The rest of Grove Terrace was reconstructed with asphalt pavement and concrete curb and gutter. The existing 8" sanitary sewer was reconstructed with two sanitary manholes being replaced. The 11 t" Street retaining wall abutting the 11 t" Street steps was reconstructed with salvaged and new limestone blocks. The stairs were partially reconstructed with wrought iron hoop railing at the top of the stairs, with the remaining handrail refurbished. The installation of a new historic street light will help illuminate the stairway and provide for roadway lighting at the top of the stairs. DISCUSSION The 11t" Street Steps & Grove Terrace Retaining Wall Reconstruction Project was completed by Portzen Construction, Inc., in the final contract amount of $635,536.59, which is a 7.9% increase from the original contract in the amount of $589,175.50. This additional cost is primarily due to the need to use new limestone rather than salvaged limestone. It was discovered when the wall was taken down that the limestone facing was primarily a fagade layer and was not suitable in most cases to re-use in the reconstruction of the retaining wall. The original wall was constructed with large stones on the outside that were irregularly shaped and then much smaller rock pieces were piled behind the large outside blocks to form the wall. RCOIIAMENDATION I recommend that the City Council accept the improvements and establish the final contract at $635,536.59. BUDGET" IMPACT The estimate of probable cost for the 11t" Street Steps & Grove Terrace Retaining Wall Reconstruction Project is as follows: Ftir~ ®vvarrl Construction Contract Contingency Engineering Design Construction Engineering & Inspection The project funding summary is as follows: CIP No. Fund Description Historic Preservation Funds 3002072 Grove Terrace Retaining Wall Total Project Funding ACTION TO E TAKEN Fund Amount $ 90,000 614,675.25 $ 704,675.25 The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $635,536.59 to Portzen Construction, Inc. for the 11t" Street Steps & Grove Terrace Retaining Wall Reconstruction Project. $ 589,175.50 76,341.38 Final $ 635,536.59 0 45,800.75 87,792.58 23,337.91 ~ 753,309.46 $ 704,675.25 Prepared by Robert Schiesl, Assistant City Engineer cc: Jenny Larson, Budget Director Jon Dienst, Civil Engineer RESOLUTION NO. 152-09 ACCEPTING THE 11TH STREET STEPS & GROVE TERRACE RETAINING WALL RECONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 11th Street Steps & Grove Terrace Retaining Wall Reconstruction Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Grove Terrace Retaining Wall Capital Improvement Project and Historic Preservation Funds appropriation for the contract amount of $635,536.59 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 18th day of May, 2009. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COtViPLET°ION OF TH 11T" STR T STEPS GROVE TERRACE RETAINING 1NALL RECONS°TRl1CT'ION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 11t" Street Steps & Grove Terrace Retaining Wall Reconstruction Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $704,675.25. Dated this ~ ~ day of , 2009. ago City Engineer ~' Filed in the office of the City Clerk on the,~',w ~ ~ day ofd _ , 2009., , ~ l ~ ~ , ,~ ~e F. Schneider, CMC, City Clerk ~,hii City of Dubuque ~ Engineering Division Council Final Payment Form PARTIAL PAYMENT NO: COUNCIL FINAL PROJECT NAME: 11th STREET STEPS 8 GROVE TERRACE RETAINING WALL RECONSTRUCTION PROJECT DATE: May 12, 2009 CONTRACTOR: PORTZEN CONSTRUCTION, INC. CONTRACT AMOUNT: $589,175.50 BID ITEM DESCRIPTION UNIT UN T OST OTO DATE AM TO DATENED Mobilization & Miscellaneous LS $ 50,000.00 1.00 $ 50,000.00 GROVE TERRACE RETAINING WALL 1 Base Course Backfill TONS $ 15,00 1276.38 $ 19,145.70 2 Concrete Backfill CY $ 190.00 433.50 $ 82,365.00 3 Geofoam Backfill CY $ 165.00 291.00 $ 48,015.00 4 Limestone (Salvaged) SF $ 30.00 1290.76 $ 38,722.80 5 Limestone (New) SF $ 48.00 1421.05 $ 68,210.40 6 4" Perforated CPE Draintile LF $ 9.00 247.00 $ 2,223.00 7 4" Perforated CPE Risers LF $ 20.00 109.00 $ 2,180.00 8 4" CPE Outlet with Bar Guard EA $ 125.00 3.00 $ 375.00 9 Structural Concrete (Barrier Rail) CY $ 300.00 $ - 10 TL-2 Barrier Rail Connection Hardware EA $ 150.00 $ - 11 Wrought Iron Hoop Railing LF $ 100.00 164.30 $ 16,430.00 11th STREET RETAINING WALL 12 Removal of PCC Steps LS $ 10,000.00 1.50 $ 15,000.00 13 Engineered Backfill TONS $ 17.50 246.96 $ 4,321.80 14 Drainage Course Backfill TONS $ 30.00 13.95 $ 418.50 15 Waterproofing Membrane SY $ 50.00 85.56 $ 4,278.00 16 4" Perforated CPE Drain Tile LF $ 9.00 180.00 $ 1,620.00 17 Limestone (Salvaged) SF $ 30.00 97.83 $ 2,934.90 18 Limestone (New) SF $ 70.00 1029.68 $ 72,077.60 19 Tuckpoint and Repair Existing Wall LF $ 40.00 $ - 20 Repair Existing Tie Rods EA $ 200.00 $ - 21 TL-2 Barrier Rail Connection Hardware EA $ 150.00 $ - 22 Wrought Iron Hoop Railing LF $ 100.00 117.70 $ 11,770.00 23 PCC Steps (Treads) LF $ 80.00 286.00 $ 22,880.00 24 PCC Steps (Landings) SF $ 10.00 169.34 $ 1,693.40 25 Stair Railing (Replace) LF $ 75,00 76.60 $ 5,745.00 26 Stair Railing (Repair) LF $ 75.00 $ - SANITARY SEWER 27 8" DIP Sanitary Sewer LF $ 35.00 152.60 $ 5,341.00 28 48" I,D. Manhole Base EA $ b50.00 2.00 $ 1,100.00 29 48" I.D. Manhole Sidewall VF $ 150.00 12.00 $ 1,800.00 30 Manhole Frame and Cover EA $ 500.00 2.00 $ 1,000.00 31 Select Trench Backfill, Sanitary LF $ 10.00 152.60 $ 1,526.00 PAVING 32 Removal of Pavement SY $ 10.00 790.00 $ 7,900.00 33 Base Course TONS $ 15.00 797.85 $ 11,967.75 34 7" PCC Pavement w/Integral Curb SY $ 42.00 615.41 $ 25,847.22 35 PCC Curb & Gutter LF $ 26.00 9.60 $ 249.60 36 5" HMA Pavement SY $ 32.00 194.78 $ 6,232.96 37 Structural Concrete {Slab & Abutment) CY $ 1,000.00 72.50 $ 72,500.00 38 Payment Markings EA $ 275.00 $ - 39 Manhole Adjustment EA $ 175.00 2.00 $ 350.00 40 Neenah 101-B Frame and Grate EA $ 650.00 $ - 41 Traffic Control LS $ 2,063.00 1.00 $ 2,063.00 42 Regrade, Seed, Fertilize, Mulch ACRE $ 12,000.00 $ - ELECTRICAL 43 Connection to Existing Electrical Service EA $ 1,200.00 1.00 $ 1,200.00 44 Conduit, 2" PVC, Schedule 40 LF $ 12.00 171.40 $ 2,056.80 45 Electric Cable, #10 XHHW LF $ 2.50 519.00 $ 1,297.50 46 Ground Wire, #6 Bare Copper LF $ 3.OD 173.00 $ 519.00 47 install Historic Streetlight inc. Foundation EA $ 2,500.00 2.00 $ 5,000.00 TOTAL AMOUNT EARNED TO DATE: ~ $ 618,356.93 CHANGE ORDER -EXTRA WORK ITEMS Concrete footing for 11th Street Stairs Wall SF $22.00 97.83 $ 2,152.26 18" RCP storm Sewer LF $45.OD 77.OD $ 3,465.00 Storm Sewer Manhole, Rebuild chimney LS ~ $1,500.00 1.00 $ 1,500.00 Add Hanhole Each $350.00 1.00 $ 350.00 8"x4" Sanitary Sewer Wye Each $350.00 2,00 $ 7DD.00 4" SDR 35 PVC Sanitary Sewer Lateral LF $45.00 10.50 $ 472.50 Removal of Existing Drain Tile (Labor) Hrs $50.00 4.D0 $ 200.00 Removal of Existing Drain Tile (Truck & Driver) Hrs $75.00 2.00 $ 150.00 4" Sidewalk SF $5.00 338.88 $ 1,694.40 Topsoil, Furnish & Install CY $35.00 108.00 $ 1,08D.00 Milbank Control Cabinet, Electric LS $4,320.00 1.00 $ 4,320.00 Sod, Grove Terrace Parkway SY $5.50 147.00 $ 808.50 Hydro Seed, South Afley SY $1.75 82.00 $ 143.50 Hydro Seed, Stairs 8, Arch SY $1.75 82.00 $ 143.50 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 97,179.66 TOTAL AMOUNT EARNED TO DATE: $ 635,536.59 TOTAL DUE CONTRACTOR: $ fi35,536.59 ENGINEERING: ~ $ 69,138.66 TOTAL CONSTRUCTION COST: $ 704,675.25 CERTIFICATE OF THE CITY MANAGER: i hereby certify that the above statement shows in detail the correct amount o~ al! work required to complete the above improvement. r APPROVED: ~,.~...~.... _ _. Michael Van Milligen, CityMana`ger~n City of~D,L(ybu e, pwa '. ~' Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF TWE CONTRACTOR The undersigned, Portzen Construction, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full'~ettieme~ for a11,41aims,for said improvement. CONTRACTOR: ~ f~: ~/~ ~' ~~'' '•/~~/%~- L,-„~~ gy_ Michael Portzen TITLE: President DATE: May 13 , 2009