Loading...
Locust Street Sidewalk & Traffic Signal Installation - 8th to 12th Street ProjectT®: The Honorable Mayor and City Council Members F®NI: Michael C. Van Milligen, City Manager SlJ JECT: Locust Street Sidewalk and Traffic Signal Project, 8th to 12th Street CIP Project Nos. 7302047 Locust Street Ramp Sidewalk Replacement 3501425 Sidewalk Program -City Owned 3501041 Curb -Catch Basin Replacement 2501615 Traffic Signal Intersection Reconstruction 3001615 Traffic Signal Intersection Reconstruction 3001011 Signalization Program 3001266 Traffic Signal Interconnect Conduit Replacement 1021609 Fiber Optic in Private Subdivision and Misc. Projects 1011549 Streetlight Replacement -City Owned 1001549 Streetlight Replacement -City Owned DATE: May 12, 2009 City Engineer Gus Psihoyos recommends City Council approval of the plans, specifications, form of contract and the estimated cost of $629,818.20 for the Locust Street Sidewalk and Traffic Signal Project, 8t" to 12t" Street. I concur with the recommendation and respectfully request Mayor and City Council approval ~~ Mi ael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer TO: Michael C. Van Milligen, City Manager ~~n~r fir: FROM: Gus Psihoyos, City Engineer DATE: May 8, 2009 SUBJECT: Locust Street Sidewalk and Traffic Signal Project, 8t" to 12t" Street CIP ProjE 7302047 3501425 3501041 2501615 3001615 3001011 3001266 1021609 1011549 1001549 INTRODUCTION pct Nos. Locust Street Ramp Sidewalk Replacement Sidewalk Program -City Owned Curb -Catch Basin Replacement Traffic Signal Intersection Reconstruction Traffic Signal Intersection Reconstruction Signalization Program Traffic Signal Interconnect Conduit Replacement Fiber Optic in Private Subdivision and Misc. Projects Streetlight Replacement -City Owned Streetlight Replacement -City Owned The enclosed resolution is in reference to the public hearing on the Locust Street Sidewalk and Traffic Signal Project, 8t" to 12t" Street. BACKGROUND In the summer of 2008, the City began the design of the Locust Street Sidewalk and Traffic Signal Project, 8t" to 12t" Street. The project will be constructed in advance of the Iowa DOT Project STP-U-2100 (641)--70-31 which includes an asphalt overlay and curb ramp improvements from 9t" Street to 17t" Street. DISCUSSION The Locust Street Sidewalk and Traffic Signal Project, 8t" to 12t" Street, includes: - Reconstruction of signals: Along Locust Street from 8t" to 12t" Street, including Locust at 8t" 9t" 10t", and 12t" Streets; and around the Locust Street Ramp at Bluff at 8t" and 9t" Streets. Due to ordering/delivery timelines, the control cabinetry and battery back-up equipment will be provided by the City. - Fiber optic interconnection conduit linkin~q the referenced signals to the existing interconnect located at Locust Street at 14t Street. - New sidewalk and street lighting around the perimeter of the Locust Street Ramp. RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and the estimated cost for the Locust Street Sidewalk and Traffic Signal Project, 8t" to 12t" Street. BUDGET IMPACT The summary of the project costs is as follows: Construction Contract Contingency Engineering/Contract Administration Project Cost The summary of the project costs is as follows: CIP Funding Source 7302047 Locust Street Ramp Sidewalk Replacement 3501425 Sidewalk Program -City Owned 3501041 Curb -Catch Basin Replacement 2501615 Traffic Signal Intersection Reconstruction 3001615 Traffic Signal Intersection Reconstruction 3001011 Signalization Program 3001266 Traffic Signal Interconnect Conduit Replacement 1021609 Fiber Optic in Private Subdivision and Misc. Projects 1011549 Streetlight Replacement -City Owned 1001549 Streetlight Replacement -City Owned Project Funding ACTION TO BE TAKEN Estimate $497, 880.00 49,788.00 82,150.20 $629,818.20 Amount $100, 000.00 20,000.00 50,000.00 72,000.00 122,000.00 14,968.20 150,000.00 42,000.00 43,850.00 15,000.00 $629,818.20 The City Council is requested to approve the plans, specifications, form of contract- and the estimated cost for the Locust Street Sidewalk and Traffic Signal Project, 8t" to 12tH Street. Prepared by David Ness, Civil Engineer cc: Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer Chris Kohlmann, Information Services Manager Jon Dienst, PE Jane Smith, Engineering Technician RESOLUTION NO. 164-09 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE LOCUST STREET SIDEWALK AND TRAFFIC SIGNAL PROJECT, 8TH TO 12TH STREET NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Locust Street Sidewalk and Traffic Signal Project, 8th to 12th Street, in the estimated amount $629,818.20, are hereby approved. Passed, adopted and approved this 18th day of May, 2009 Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk