Loading...
Trolley Line Trail_Eagle Point Park ProjectDubuque THE CITY OF Dj TR ~ All-AmedcaCipt ~.J 1J Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Trolley Line Trail -Eagle Point Park Project (CIP 1001989) DATE: May 20, 2009 City Engineer Gus Psihoyos recommends City Council approval of the plans, specifications, form of contract and the estimated cost of $242,309.99 for the Trolley Line Trail -Eagle Point Park Project. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Dubuque THE CITY OF Dj TR ~ Ap-AmerieaCipr ~J 1J " Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Manage FROM: Gus Psihoyos, City Engineer DATE: May 19, 2009 SUBJECT: Trolley Line Trail -Eagle Point Park Project (CIP 1001989) INTRODUCTION The enclosed resolution is in reference to the public hearing for the Trolley Line Trail - Eagle Point Park Project. DISCUSSION The Trolley Line Trail will be a 10-foot wide paved hike/bike trail along an old trolley route roadbed in Eagle Point Park. This '/2-mile off-road trail would use the existing grade of the abandoned trolley line from Shiras Avenue north of the Ham House museum site to the park's main entrance road turnaround with the eagle statue. The trail will follow a scenic route through a wooded area with limestone outcroppings. Interpretive signs will be incorporated into the trail design. A wayside rest area will be developed approximately halfway up the trail. This wayside rest will be rough graded during the project and finished by a Boy Scout (Ian Carstens) as part of his Eagle Scout project. Ian is planning to reuse salvaged purington pavers for the surface of the wayside rest. Additionally, some infrastructure items will be installed to accommodate future upgrades. Light bases and electrical conduit will be installed as part of this project to accommodate future lighting of the trail. Conduit will also be installed to accommodate future emergency call boxes along the trail. A short water extension will also be included to accommodate the replacement of a hydrant. Storm sewer improvements will also be included. This includes the repair or installation of 4 culverts that will tie into the city storm sewer system. This trail will provide an off-road alternative to the main entrance road into Eagle Point Park, which is a signed route in the Heritage Trail Riverfront System. The Trolley Line Trail will be at a lower percent grade than the main entrance road, which is fairly steep and does not have sidewalks, trails, or paved shoulders for bicyclists and pedestrians to use. The current base bid proposal is fora 10' wide asphalt trail using 20% recycled asphalt. An add and delete alternate bid will also be requested for the installation of 5" thick concrete pavement in lieu of the asphalt pavement. This will give both asphalt paving contractors and concrete paving contractors an opportunity to bid on this project. RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and the estimated cost for the Trolley Line Trail -Eagle Point Park Project. BUDGET IMPACT The estimate of probable cost for the Trolley Line Trail -Eagle Point Park Project is as follows: Estimate Construction Contract $191,549.40 Contingency 19,154.94 Construction Engineering & Inspection 31,605.65 Total Project Cost $242,309.99 The project funding summary is as follows: Fund CIP No. Fund Description Amount 1001989 Fiscal Year 2008 Resource Enhancement and Protection (REAP) Grant $200,000.00 7401405 Water Main Replacement Program 5,237.10 3501425 Sidewalk Program -City-Owned 21,892.80 1011549 Street Light Replacement 15,180.00 $242,309.99 ACTION TO BE TAKEN It is requested that the City Council approve the plans, specifications, form of contract and the estimated cost for the Trolley Line Trail -Eagle Point Park Project. Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Laura Carstens, Planning Services Manager Gil Spence, Leisure Services Manager Bob Schiesl, Assistant City Engineer E®LUTI®N N®. 191-09 APPR®VAL ®F PL~4NS, SPECIICTI®NS, F®RM ®F C®N°TRACT, AN® ESTIMATE C®ST F®R TI•iE TR®LLEY LIN °fRAIL EALE P®IN1° ~-R PR®JECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Trolley Line Trail -Eagle Point Park Project, in the estimated amount $242,309.99, are hereby approved. Passed, adopted and approved this 1St day of June, 2009 _.. r ~_ t,u ~~.~ ,~'o~rce E. Connors, Mayor Pro-Tem ?...` Attest: eanne F. Schneider, CMC, City Clerk