Loading...
Chavenelle Dr Extrension finalMEMORANDUM January 15,2003 TO:The Honorable Mayor and City Council Members FROM:Michael C. Van Milligen, City Manager SUBJECT:Chavenelle Drive Extension -Acceptance Public Works Director Mike Koch is recommending acceptance of the Chavenelle Drive Extension Project, as completed by Portzen Construction, Inc, in the final contract amount of $583,148.07. I concur with the recommendation and respectfully request Mayor and City Council approval. MichaelC. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM December 14, 2003 TO:Michael C. Van Milligen, City Manager FROM:Michael A. Koch, Public Works Director SUBJECT:Chavenelle Drive Extension - Acceptance INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Chavenelle Drive Extension Project. DISCUSSION Work has been completed on the project by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $583,148.07. The project consisted of extending Chavenelle Drive 1,125 feet to the west of Radford Road. The extension of the roadway was in conjunction with the construction of Alliant Energy's building in the Dubuque Industrial Center West. The road consisted of a 37-foot wide back-of-curb to back-of-curb, with storm sewer and full utilities. As an extra work order during the project, installation of street lighting was added for the existing Chavenelle Road east of Seippel Road to match the street lighting on the new project, at a cost of $82,104. RECOMMENDATION I recommend that the City Council accept the improvements and the final contract be established at $583,148.07. BUDGET IMPACT A summary of the budget costs is as follows: Award Final Construction Contract $538,208.43 $583,148.07 Contingency 58,706.37 0 Engineering/Inspection 88,059.55 42,097.25 Total Project Cost $684,974.35 $625,245.32 The project is funded as follows: City Portion (Road Use Tax) IDOT Rise Grant (Maximum Grant) Total Funding Award Final $500,622.12 $446,695.27 184,352.23 178,550.05 $684,974.35 $625,245.32 The Fiscal Year 2002 City share appropriation for this project consists of $632,000 in Road Use Tax Funds. The project, as outlined, will require $446,695.27 in City funds. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvements and establishing the final construction cost. Prepared by Michael Felderman, Civil Engineer cc: Pauline Joyce, Administrative Services Manager Bill Baum, Economic Development Manager Bob Green, Water Department Manager Gus Psihoyos, Assistant City Engineer RESOLUTION NO. 15-03 ACCEPTING IMPROVEMENT Whereas, the contract for the Chavenelle Drive Extension Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the Road Use Tax Funds in amount equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this 20th day of January, 2003. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk RESOLUTION NO. 16-03 FINAL ESTIMATE Whereas, the contract for the Chavenelle Drive Extension Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $625,245.32 and the said amount shall be paid from the Road Use Tax Funds of the City of Dubuque, Iowa. Passed, approved and adopted this __ 20th day of January ,2003. Terrance M. Duggan, Mayor Jeanne F. Schneider, CMC, City Clerk IIW ENGINEERS AND SURVEYORS, P.C. CONTRACT COST SUMMARY PROJECT COMPLETION DATE Revised: SEPTEMBER 30. 2002 Original: AUGUST 30. 2002 CONTRACTOR: PORTZEN CONSTRUCTION. INC. ADDRESS: P,O, BOX I425 DUBUQUE, IA 52004-1426 [!MOUNT OF CONTRACT ] DATES OF PAYMENT Original: $535,208.43 From: 10/1/2002 evised: $503,148.07 TO: 10/25/2002 I DETAILED ESTIMATE OF COFD'RACT WORK COMPLETED TO DATE CONTRACT ITEM I ITEM ICONTRACT iTEM DESCRiPTiON I QUANTITY, UNiT , UNiT COST I PREVIOUS TOTAL QUANTITY I AMOUNT PERCENT NO. Different ROADWAY I Mobiliza[~on and Miscellaneous I LS $5.000.00 I $5,000.00 100ff~ 2 Cleadng & Gr~bbing 2,5 AC $900.00 2.5 $2.250.00 100ff~ 3 Excavation 4500 CY $2.50 5621 $14,052.50 125~ 4 Base Stabilization (ExC., Disposal & Macadam Stone) 1075 TON $11.80 733.96 $8,660.73 689~ 5 4" Longitudinal Drain Tile 1200 LF $4.00 1050 $4,200.00 88o~ 6 Subdrain Outlet (Connect to Inlet) 5 EA $75 00 5 $375.00 1 7 18" RCP 283.9 LF $34.50 322,4 $7,898.80 114~ 8 30' RCP 714.7 LF $44.00 729,83 $32.112.52 102~ 9 36" RCP 233.4 LF $57.00 247.5 $14.107.50 105~ 10 42" RCP 94 L? $80.00 113.5 $9,080.00 121~ 11 42' FES 1 EA $1,675.00 1 $1,675.00 100~ 12 Stomq Manhole (complete) 3 EA $3,280.00 2 $5,560.00 67~ 13 Riprap OuUet ProtecSon 100 TON $15.00 87.01 $1,305.15 97o,~ 14 Type 101B Catch Basin 4 EA $1,450.00 4 $5,800.00 100~ 15 Type 101B Catch E~asin. Special 6 EA $2,050.00 6 $12,300.00 100~ 15 Trench Bol:[om Stabilization Stone 100 TON $12.00 0 $0.00 0~ 17 Select Bacl<fill Storm Sewer 1214 LF $9.50 1097.1 $10,422.45 90o~ 18 Silt Fence Inlet Protection 10 EA $40.00 0 $0.00 0~ 19 SiIt Fence 500 LF $1.80 0 $0.00 0~ 20 Erosion Stone 100 TON $14.00 0 $0.00 21 12" Modified Subbase 5385 TQN $10,05 4023.59 $40,437.08 755~ 22 8" PCC Pav~ng 5095 SY $33.00 5067,3 $115,547.90 99°/~ 23 4" ACC Pav~ng {Temporary Cul de Sac) 150 TON $48.70 156.11 $7,602.56 104o~ STREET LIGHTING 50 Street Light - Pole and Fixture 12 EA $3,197.00 18 $57,546.00 150°/ 59 Sen~icePedestal 2 [ EA I $2,420,00 2 $4,840.00 100o/~ TOTAL WORK COMPLETED $541,199.45 ] I DETAILED EST]MATE OF CHANGE ORDER WORK COMPLETED TO DATE I ORDERCHANGE NO. DATE CHANGE ORDER DESCRIPTION AMOUNT PERIOD THISTOTAL DATE TO TOTAL CHANGE ORDER WORK ~ $41,948.62 TOTAL DUE CONTRACT [ $553,148.07 J The undersigned, II hereby ceri~y that the above s~.~ement s~h ows th detail the correct amount of all work ~equired [o complete the above improvemenL APPROVED: ~ ,~ APPROVED: