Loading...
Rush Street Reconstruction Project AcceptanceTHE CITY OF ~ Dubuque DUB E Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Rush Street Reconstruction Project -Bryant Street to Villa Street CIP 3001953 -Fiscal Year 2008 Street Construction Program DATE: June 26, 2009 City Engineer Gus Psihoyos has recommended the acceptance of the construction contract and the establishment of the Final Schedule of Assessments for the Rush Street Reconstruction Project -Bryant Street to Villa Street. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:Iw Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY {~F Dubuque ~~TB E '~II~' 1Vlasterprece on the Mississippi zoos TO: Michael C. Van Milligen, City Manager ~. ~~ ~( FROM: Gus Psihoyos, City Engineer 1~~,~~ _ _~ DATE: June 26, 2009 SUBJECT: Rush Street Reconstruction Project -Bryant Street to Villa Street CIP 3001953 -Fiscal Year 2008 Street Construction Program INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract and the establishment of the Final Schedule of Assessments for the Rush Street Reconstruction Project -Bryant Street to Villa Street. BACKGROUND The Rush Street Reconstruction Project -Bryant Street to Villa Street provided for the reconstruction of underground utilities, roadway sub-base and the construction of a new 37- foot wide concrete roadway between Bryant Street and Villa Street. The project incorporated: - Upgrades to the existing sanitary sewer system: the complete reconstruction of 3,205 lineal feet of 8-inch mainline sewer; the reconstruction of 13 deteriorated brick manholes; and the replacement of 72 private sanitary sewer laterals. The cost for the individual sanitary sewer lateral replacements will be assessed to each respective private property owner. - Reconstruction of 3,533 lineal feet of watermain, mainline valves, fire hydrants, and the replacement of 20 lead residential water services. The cost of the individual lead residential water service replacements will be assessed to each respective private property owner. - Construction of 2,342 lineal feet of new storm sewer and 25 catch basins to improve the storm water conveyance in the area. - Installation of fiber optics and telecommunications conduit infrastructure. - Replacement of existing sidewalks along both sides of Rush Street. RECOMMENDATION The Rush Street Reconstruction Project -Bryant Street to Villa Street was completed by Horsfield Construction, Inc. of Epworth, Iowa, in the final contract amount of $1,672,977.64, which is a 0.91% increase from the original contract in the amount of $1,657,853.10. PROJECT COST -BUDGET IMPACT The project cost summary for the Rush Street Reconstruction Project -Bryant Street to Villa Street is summarized as follows: Construction Contract Bid Award $1,657,853.10 171,749.09 Final $1,672,977.64 0 Contingency Construction Engineering & Inspection The project category costs are as follows: 283, 386.00 188,462.28 $2.112.988.19 $1.861.439.92 Cost Summary/Description Amount Street Construction Improvements $1,031,005.70 Special Assessment -Street Improvement, Residential Properties $116,968.66 Special Assessment -Street Improvement, Commercial Properties $43,336.09 Special Assessment -Street Improvement Deficiency, Paid by the City 1,973.98 Special Assessment -Water Services, Residential Properties 21,949.76 Special Assessment -Sanitary Sewer Lateral, Residential Properties 70,374.39 Special Assessment -Sanitary Sewer Lateral Deficiency, Paid by the City 256.57 Special Assessment -Concrete Sidewalk, Residential Properties 2,598.48 Special Assessment -Handicap Ramp, St. Columbkille's Property 4,500.00 Watermain Improvements 208,866.37 Sanitary Sewer Improvements 152,965.41 Storm Sewer Improvements 111,767.69 Fiber Optic Conduit 94,876.82 Total Project Cost $1.861.439.92 The project funding summary is as follows: CIP No. Fund Description Fund Amount 3001953 Street Construction Program $1,033,236.25 Special Assessment -Funding Total 259,727.38 7401405 Watermain Replacement Program 208,866.37 7101638 Street Program Related Sanitary Sewer Improvements 152,965.41 7201914 Rush Street (Bryant to Villa) Storm Sewer Improvements 111,767.69 1021017 Fiber Optic Conduit -Paving Projects 94,876.82 Total Project Funding $ .861.439.92 The Rush Street Reconstruction Project -Bryant Street to Villa Street will be funded through the annual capital improvement project appropriation of City funds as noted above in the amount of $1,601,712.54. The project, as outlined, will require Special Assessments in the amount of $259,727.38 and expenditure from the FY2008 Annual Street Construction Program (Funded through Local Option Sales Tax) in the amount of $1,033,236.25. SPECIAL ASSESSMENTS Based upon final construction costs, the total amount of Special Assessments for all associated improvement (including street, sanitary sewer/water service laterals, residential sidewalk and handicap ramp) is in the amount of $259,727.38, which is 15.65% ($307,922.62) below the preliminary special assessments estimates that were presented to the property owners and approved at the project public hearing. This decrease is attributed to lower construction cost. FINANCIAL ASSISTANCE Property owners subject to sanitary sewer and water service lateral assessments may be eligible for the City's low and moderate income special assessments assistance program, ranging from 20% to 100% of the assessments for the owner-occupied residential property depending on family size and income level. To allow sufficient administrative time to process financial assistance applications for low- to moderate-income families, eligible property owners will be given approximately 30 days from the date of mailing the Notice of Filing the Final Schedule of Assessments to apply for financial assistance that may reduce the amount of the assessment payable by the property owner. During this 30 day period, assessments may be paid in full or in part without interest at the City of Dubuque, Office of the City Treasurer. After approximately 30 days, any unpaid assessment will be levied against said benefited property with the Dubuque County Treasurer and will be payable in 10 annual installments at the County Treasurer's Office, and will draw annual interest at nine percent (9%). FINAL ASSESSMENT SCHEDULE The schedule for the Final Assessment process is as follows: Council Approve Final Schedule of Assessments July 6, 2009 Mail Final Special Assessment Notice to Property Owners July 10, 2009 Mail Financial Assistance Information to Property Owners July 10, 2009 Publish Notice of Final Assessment 1st Publication: July 10, 2009 2nd Publication: July 17, 2009 Deadline for Financial Assistance Applications August 10, 2009 Deadline for Paying Assessment to City, Without Interest August 10, 2009 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvements, establishing the final contract amount, and approving the Final Schedule of Assessments for the Rush Street Reconstruction Project -Bryant Street to Villa Street Prepared by: Greg Doeden, Civil Engineer cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Sanitary & Street Maintenance Supervisor Bob Green, Water Plant Manager Bob Schiesl, Assistant City Engineer Deron Muehring, Civil Engineer Dave Ness, Civil Engineer Jon Dienst, Civil Engineer RESOLUTION NO. 213-09 ACCEPTING TH RUSH STREET RECONSTRIJCTION PROJECT - BRYANT STREET TO VILLA STREET AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Rush Street Reconstruction Project -Bryant Street to Villa Street (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Street Construction Program, Watermain Replacement Program, Street Program Related Sanitary Sewer Improvements, Rush Street (Bryant to Villa) Storm Sewer Improvements, Fiber Optic Conduit -Paving Projects appropriations for the contract amount of $1,672,977.64 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 6th day of July, 2009. ~/ Roy D. Buol, Mayor Atte f: ~~ / r anne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE RUSH STREET RECONSTRUCTION PROJECT - BRYANT ST EET T VILLA STREET The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Rush Street Reconstruction Project -Bryant Street to Villa Street, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $1,861,439.92. Dated this 1st day of July, 2009. Gus Psihoyos City Engineer Filed in the office of the City Clerk on the 1st day of July, 2009. Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 214-09 ADOPTING THE FINAL ASSESSMENT SCHEDULE FOR THE RUSH STREET RECONSTRUCTION PROJECT - BRYAN TO VILLA STREET NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: After full consideration, the Final Schedule of Assessments as shown on the attached sheet(s), Page 1 to Page 3 inclusive, is hereby approved for the Rush Street Reconstruction Project -Bryant Street to Villa Street. There is hereby assessed and levied as a special tax against and upon each of the benefited properties, the respective sums indicated. The amounts shown in said Final Schedule of Assessments as deficiencies are found to be proper and levied conditionally against the respective properties benefited by the improvements as shown in the Final Schedule of Assessments, subject to the provisions of Iowa Code § 384.63. Said assessments against said lots are hereby declared to be in proportion to the special benefits conferred and not in excess of twenty-five percent of the value of same. The City Clerk be and is hereby directed to certify the Final Schedule of Assessments to the County Treasurer of Dubuque County, Iowa, and to publish notice of said certification once each week for two consecutive weeks in the manner provided in Iowa Code § 362.3, the first publication of which shall be not more than fifteen days from the date of filing of the Final Schedule of Assessments. On or before the date of the second publication of the notice, the City Clerk shall also mail a copy of said notice to property owners whose property is subject to assessment, as provided in Iowa Code § 384.60. The assessments may be paid in full or in part without interest at the office of the City Treasurer, City Hall, 50 W. 13t" Street, Dubuque, Iowa, at any time within 30 days after the date of the first notice of the Final Schedule of Assessments. Thereafter, unpaid assessments of $100.00 or more are payable in 10 annual installments at the County Treasurer's Office, Dubuque County Courthouse, 720 Central Avenue, Dubuque, Iowa, and will draw annual interest at nine percent (9%) computed to December 1 next following the due dates of the respective installments as provided in Section 384.65 of the Code of Iowa. Each installment will be delinquent from October 1 following its due date on July 1 of each year. However, when the last day of September is a Saturday or Sunday, that amount shall be delinquent from the second business day of October. Delinquent installments will draw the same delinquent interest as ordinary taxes. Property owners may elect to pay any annual installments semi-annually in advance. Passed, approved and adopted this 6th day of July, 2009. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk NOTICE TO PROPERTY OWNERS OF FILING OF THE FINAL SCHEDULE OF ASSESSMENTS FOR THE RUSH STREET RECONSTRUCTION PROJECT - BRYANT STREET TO VILLA STREET TO THE PERSONS OWNING PROPERTY WITHIN THE DISTRICT DESCRIBED AS FOLLOWS IN THE CITY OF DUBUQUE, IOWA: The public improvement and location is as follows: Rush Street Reconstruction Project -Bryant Street to Villa Street Consisting of the properties which are described as follows: All property included with the areas described so as to include one-half of the privately owned property between each such street to be improved and the next street, whether such privately owned property situated more than 300 feet from the street to be improved be assessed. You are hereby notified that the Final Schedule of Assessments against the benefited properties within the District described above, a copy of which Final Schedule of Assessments is attached hereto, has been adopted and the assessments confirmed by the City Council of the City of Dubuque, Iowa, and that said Final Schedule of Assessments has been certified to the Dubuque County Treasurer. The assessments may be paid in full or in part without interest at the office of the City Treasurer, City Hall, 50 W. 13th Street, Dubuque, Iowa, at any time within 30 days after the date of the first notice of the Final Schedule of Assessments. Thereafter, unpaid assessments of $100.00 or more are payable in 10 annual installments at the County Treasurer's Office, Dubuque County Courthouse, 720 Central Avenue, Dubuque, Iowa, and will draw annual interest at nine percent (9%) computed to December 1 next following the due dates of the respective installments as provided in Section 384.65 of the Code of Iowa. Each installment will be delinquent from October 1 following its due date on July 1 of each year. However, when the last day of September is a Saturday or Sunday, that amount shall be delinquent from the second business day of October. Delinquent installments will draw the same delinquent interest as ordinary taxes. Property owners may elect to pay any annual installments semi-annually in advance. Jeanne F. Schneider, CMC, City Clerk E to L eBed 69'LZ6'K I OB'L50'LS I 09'LSO'tY SL'605'lt I 50'SSf'ZY BO SSE'ZS I 66'LLB'L94 9arLSbSZbLI -PPtl uwnNSBl80914-1-1-L-l Pl.l6M p81'WpiYaBON bL'f8Z'Zf I 9b'Llf'LY I BS'E6f- 40 SSf'lY I 89'1[64 I BB lLe4 I bl eef'b6f ZlOS5/-SZ~OII 'Pptl upon OBL-S9L S-LPl I 'f ApO'aueyuRq ~~' I I ~~' I ~ OE-9Sf I Of'bSE'LOIf 1100-L9FSZ9ll 'PDtl anon ul LL89LPt2 pl 9/l Wn B'PPtl uwnLL 89LPLP LPI I '3 uWf'AASN ~ ~' I I ~ ~' I I 96'f9f Pptl uo,un LL9L-ZS Z6 S Z pl /m Lart8f5Z91 I DDtl up on LL 8 9L-tlL Pl Z/l Pun 8'PPtl upon 96L Poe SbL-L-Z pl I '1 seupyl'uurli 86'bZ4 I I 86>ZS I I 58'bZf 96'8[['6!! I Larl9fSZUl I -PPtl uaun LL 8 9L-ZS P Z6 S P Z Pl I '1 avup4l •uu%I SL'blf ` I SZ>tS I SZblf SZ'b LZY IgOPlBfSZbt 'PPtl ualun 96L 9S6tPL-l Pl laauWt'uu%I ~~~ I I Ob~LSf Ob LSf Ob LSL'8S4 Sar IBESZbI 'PPtl uolun L289L -Z-9-Z9 S-lPl lwiw4l'uuea 09'BSL'Z4 I I Le060'lS I 44060'Lf I l8'9bLf 99'LL6f 89'[[64 0!955'09[! SLOO9f'SZ'OL 'Pptl uaun Rl-L-L PI OAawN 8'f uanalS'uuea 9S-SZL'ZS I 9009L'l4 I 80'O94'Lf I Bb'SbS'LY Bb'SK'tS I 9SSZb'BLt 50079E 5ZULl PPtl uo!un fcL Pl slLWl uutlB lPlauoa'uusfl f99Z5'l4 I 9Z 9LZ4 I 9Z OLZf I LS'6SS'lf LS955'lS I f59Zf'S9lf L0079E-SLOLI 'PPtluwnZLL pI I elleNA wtl B'1 %wpa'uusa K OSL'Z4 I I 90091'[! I SO OBL'lS I 9L'OLS'tY 9L'OLS'Lf I 9e osL ess 900'/9fSLOL I aPV Own ou Pl I au.w wv a'1 PRwa'Wnl EO'Ll/Z3 I fL'SfBS El SE6f I 065Lb'lY I I O6'SL6'l4 I fO LLL'Zll4 fIPLBf'SLbI l 'WtluwnOfl Pl I 1PRUPa 8aueW wtl'wq 57'SOZ'fY I fl'SfBS EI SEBf f6'66LY 065Lb'lt ` I O6'SLb'l4 9V SOV'LOLt bl0'tBE'SZ-Ol 'PPtluwn6Zl Pl do PaN SI VOf'E4 I 11500'lS lL'S00'l4 f6'b6L4 09'b05'l4 I I 09'605'tS SL 905'8[4 1L0t9E'SZ'OL VPtl uwnEAL laI do PaM b OLf'Z4 Zl oL6f Zl'oL64 Z6'6fiE'LS I I Z6'66f'l4 90001'LZIf Z00'8S95Z'Ol FPtluwnBOZ pI Cpl ARW 8'a Na4oIW'uoauWf LSf9Zf I L9'E9Z4 LSf9Z4 'PPtl uwun OZ l pl P A9 N Im L00'f8f'SZDL DPtl 9PWn tZt Pl to AB N -W uueof'PR!umlaef c9 E9zs I I I L9'eszs L9f9zs I oe ae'u Is LOD'f5f SLOT I PPtl Own ozL Pl P Ae N I w 44aof'Pla!uoAa•r %-l9Z'f4 I I 9p'8LZ'l4 I 908LZ'lf I 89'6884 Z6 E60'lf Z6 f60'lS I 59.199'89! B00'LB£`SLOt I 'PPtluwnLZt Pl.SLS I enaA/eW'au4aPH b$'SLZ'Z4 I I LO'SLZ'44 I LO SIZ'l4 I I Lb'090'Lf Lb'090'lS ~I 9S SLB'89f fltrO5f5L-ol I 'PPtluwn9fl Pl ALS I 'a Ausl'uxuaanH 82 BZ9'EI I fi00t1'lS 80.O11'Lf LZ'Slf'lY Z6'66f'lY ~ ~ Z6'66f'lS I ~~ eL'BLC'ZOL4 f00'BS6'SL'OL 'PPtluwnLOZ PI 'W A4PP08'0 upne7'uHUpRH BE'lSf'ff I 11500'l4 I 11500'[4 I SO'Z65Y I 6L'bOS'lY 61905'lS I 9f'LSZ'OSLS OZR L9f'SZ-Ol 'DPtl uwnYbt Pl 'W 1Pnf 8'l eaupyl'AIaaH Sl'9084 I I St9aeY I I SL 8084 I 'Wtluaun lZl Pl.58S-AZ 3/m I500'fBf :ZUL 'pptl udun LZt pl 58S-AbM 'W Ueauaf8'f auplS'Mao' H B l'6L6'lY I OI SLOTS 01 SLO'l4 I 50'6(164 I I BO'90K RLBI'OLIS 1500'fBfSZ~OL 'pptl uwnLZt pl.Se S-AL3 I 'W Ueauaf 8'f euRN'MaoaueM S6'LfLY SB'LELY I I S6'LfL4 PPV Uqp L84lal AL 3/m 1800959SZOL 'pptl own u56l pl AE'M I snS Areal 8'f NaWed'uwt0 16 S6ZY I L6'SbZY I I ISSbZS 95'f8L'f LS B00~95YSZ9l pptl uwnL6L pl Al'3 I snS AieW B'f NaPRd'4AaA0 LO'SLf'ZY I WS6l'lf 90'56 L'l4 66'6ZL'lS I 66.6ZZ'L4 LOSLB'f64f BOO95bSZ9l 'pptl uwnL6L pl AS'M I a~LS A•aYl8'f NOPRd'uaax~ ~ 864 I ~ 9fif 67 864 'PPtl upon w SZL Pl Im OIPZBfSZ9l I VPtl own 9Z l-Z pl -W A4P~o0'Wei0 96 G9L'ZY I 90'SBZ'lS I 911-S9Z'l4 I 00'05 O6'SLb'Lf O6'SLti if I S6'6S9'8K OlPZ8f5Z94I PPtl uwnSZl pl 'W Ayplo0'WSi0 £S bL I'K I I 95'L9Z'44 I 95-L9Z'LS I 90'ZK'tf 65'69!'[4 6B'bgS'lf I fS'bLl'9114 IZOPLSb'SZ9L VPtl uwnEHl pl aueW AUea'uvpa0 BS'fi6l'ZY I 0004 00'Of I 9Z'919f I ~ fE't8f'L4 EE'l8E'tf I 85661'!54 0lP l9fSZbL I 'PPV Lplun 991859{ 9nSPb PI p!una r 4p9en13 a II'u4or HeQPa'roaP~~ N L9S'Zf I 80011'lf I 6o Otl'LS I I ZE'L59'l4 I ZSLSb'lY I lb L9L'ZOL4 IbL05S'b-SZbI 'Pptl uuuO LBl pl.SSIS I 'V+spiv08'3 NaIMd'Y u4sli zc wa'LS I 9z soEY I sL'sofs I Lo r9s'tY I I Lo'65s'ts ze ebewls ILarcso-szoLl -PPV Uaun zel Pl I 'v IA~a4o9'r waoa ~wueo £l'9LLf I I I El'BLL4 I I f L'9LLY PPtl own 95L pl lm LOOSOI-9f91 lu5!un ul fS l P1 8 Lb lW P l Pl 8 S6lW P 9 Pl 8 l pl Jo pn5 aW P Z pl I pa4aS Alenuwo0 aibrglp 59'S80'ZY I I ~ 580'[5 I I 59'S90'Z4 PPV own bSl Pl Im L00'fOl-9F:Ol luqun fSL Pl 8 L9lW P l Pl 8 Sb lW P 9 pl 8 l pl P VnS WI P 4-Z Pl IaaVaS ANUnuwoO eMrpp 186LL'l4 498LZ'l4 I I l8'6LZ'lf 'DDtl uolun bSt Pllm L00£OL9f-ol I SI pIIWeuIW ZPI poyag ANwwwo0¢~pn0 L6 ZE9'Z4 LB ZE9'LS I I L6 Zf9'ZS 'PPtl uaun bSt Pl /m LOO4Dl-9f-Ol lugp fSl Pl 8 Lb lW to L Pl 8 SY lW P 9 Pl 8 L Pl P GnS all to L-t pl ApVaS ANUmuuo0 enbn9n0 ~ ~' 4 I b8'09fY b6'OSf! 'PPtl uoiun b5l pl /m I L00'£Ol-9f-Ol 'pptl uuun 95L Pl AL M po4aS AAUnwwoO anMpnO OL'lN'Z4 ~ OL'lf0'Zf OL lEO'ZS I 'PPtl uaun bSl pl/m ILOOlOl9fOl pptl uaun SSL pI po4a5 ANURUwo0 anbtpn0 90'5 le'ZS I ff'LLBf fELLBf I SL LfB'Lf SL'LE6'l4 I B9'lS6'S05f ILOPEY149fU1 -Pptl ualun KL pl PoyaS ANUnwupO anblpn0 S6'Efif'ES I I BS'Z9L'L4 I 95 Z91'LS I 96'f55S L6 LLf'lf LO LL£'lS I S6'f6f'f84 I6arL8ESZUlI -pptl ualun 9ZLP lPI I 'W AUeANl'uaxuoN8 WA3'Pn+aulpf 98'lL6'E4 I I BO'S6l'L4 I WSbI'LS I fl'l96'lf KS9f'l4 09.59E'lf I 95'lLS'994 IE0079ESZULI wtluwne9l-l Pl I 'tl aP9R94 WAef'ao0 S9-LEB'lf I 9Z'oLZf I I 9L-O[ZS I 6S 195'l4 65'l95'lf Idwsa3 gOD-b8E5ZOll 'PPtluwnlLl Pl anbrpnO PAN] OZ Z96'Z4 I I 9Z'OLZS I I 9Z-OLZS I I OB lcl'Z4 OB'LLLY4 OZ'Z60'86! blD7SFSLOt I 'PPtl upon B9L2-l Pl W eug0 8'S PAUV0'IpuaO 08'OBl'lf I ( I I I I 69'OBL'l4 KO9 L'L4 'PPtl uwnEZL pl ZL 3-AL$-.bM/m ZLPZ9E5L-Oll 'PPtl uwnfZL PI A9M -f aauWlB'3 WWa',apwdis0 lL OSI'l4 I I fi0'Oll'LY I BO OII'If I ZSOLS I Z9'OLf SS'L9E'09f ZlPZ8fSZ9l -OPtluwnfZl Pl Zl3 -AL S-.bM -f aawal183wwa'~aKKaaO 69'906'lS I bZ'SLfS 12 SLEf I S9'Lf5'lS I S9'LfS'Lf I 6B'900'Ell4 1910-19fSZ-Ol 'Wtluqun lSL PI I -tl Y~W09-f PaWa'uaup EE'Sfi l4 I EE lfit! ff'SBLS EE'S~'l9f I11095ESZ-Ol PptluwnffL PZ PI I 'O Snryl'wa+e tZ SZO'Z4 I 9Z'SOff 9Z-SOEY 96'6LL'lS 988tL'LS LZ-SLS'BOl4 ISIRKfSZUI aaeld auewaPp0 u4PfLP1 I 'f,.NUUaf B-f Waaf'WPn9 L9'9lL'ZY I LS WZ'lf CS bOZ If OI YIS'l4 OL'bt5'LS L991Z'BLS IIIObBfSZbL 'PPtluwn9Ll Pl I tlsIPB'uva5 L9'ZSff L9'ZSff LB'LSEf LB'LS L'LOLf LlOlSfSLbL I I Z'oN'PPV own l pl -W uagyR„ 8 f Nxrd',aAaue~9 956LL EY 09 Z80'Lf 09-Z80'lf 6fi t9b'L4 Zf ZOZ'lS Zf ZOZ'Lf I WBLB'Lt LS 910Y8fSZOl I I aagd auauwPW'J U4ofZPl I wawpY'a+aPw~'wwlRre z5ezs'ts I bssces 9z5Les as96s'LS asabs'LS I z9EZg'EZIS Izoo-9srszroLl vPtluwnoLZal I vwe'AA4elaa L9'LSf to CS4 l8'LSf I (IS UUInOwlwd ldaN3)'PPtl uwnll2'Id'N/m 1008SFSZUII 1'IS UUnOUI Pad Naor3)'PPtluwnLtZ'IdS tlPa19'AAUep0 99'ZZZ4 99'ZZZS e159f4` K'L95f I S9'S9E'Lf 100956SL911 ('IS UUpp ul Ped AlAOA3)-PPtluwnllZ'Id'N ~ -tl PW9'ASUNa0 LL OZ92S f9Ll8f f9LlfiS I K'ZOS'tS K'ZAS'tf I LI'OLE'L84 ZL(b L9fSZUl 'pptl uolun Z6L Pl I 'S r~aa4aa 8'a lqup'PUNO9 09'994'[! I I 08'99l'lS OB'B9L'lf VPtluwn00Z Pl Im Lao-o96szrol 'POtl won fOZ PI I iwIPAw 9.0 RPa0'aBo9 Z6'fifif'LY I I I ZB'BBf'Lf I ZB-BBE'44 'PPtl uwn00Z Pl lm It0009bSZbl 'PDtluwnZAZ PI iwwww 8.0 pWe0'a8o9 zfi'fifie'LS I I z6'e6f'ts I zfi-fi~'ts 'PPtl uoWn aoz Pl/m Itoo-o56szroL -PPtl4wnLOZ PI iP•nllw8-a R!up'a8o5 tseoo'ss I ab'a6s zs I LL'sao'LS tt's9o'LS z6'66f'ts I z5e~'LY sfi'~s'LOSS Itoo-oSb~szroLl 'PPtl uwnaoz Pl iwPAw9 uATR0'a8o9 eezes'zs I eL 0o6S eL'oofis 91zfL'ts I I 9c zEL'IS I fiez£c•ttu I6to-txszoLl zf mtl 4a4nzPl I .~aaa0'IPaWaaAaP9 9f-&I6'Zf 09'Zfi0'L4 09'ZBO'LS 9['![8'44 I ( 9G S18'l4 9f'BOf'Sf L4 IS00'LSbSZ9t I Pptl uo,un S9L Na 868 L-Z'l-I-L-Z PI I 'r +*uaf'taAaae LZ-Slif LL'SILf I I lZ'Sll4 'DOtl~wnu!SfI PI AS N/m L0008EY91( 'PPtl~wnLft PI ALt N-ASN I WWa4a!a'asNeBuAiaB IZSIIf I LL'SlL4 I lZ'SILf I VPV Uwn wSfl pl AS N/m LOOOBESL-Otl 'pptl uwun9fl pl All N-ASN 'W WWaIa'iauuaBuma9 cZ tBti lS I LZ-L99'L4 I LZ'l8b'Lf I OL'l L6'fOIY L0009CSZ-Ol 'Pptl uwnSfl pl ASN -W Wa4ala'~a%RBuAla9 Zti 69ZS Z9'6BLt ( Z9'69ZS I Sb'l'W tl-l pl /m 11009Z1~9E~Ol Sb pl IePLAW CZ Pl I andpn0 P swaolpV ~tl L09f if LO 9ELf I LO'9f if I 66'!0['084 11009Z19E~OL S6 pl RpuBy PL-4 pl I enbrpnOPaaaaap4wtl OL'SSK 015994 OL'SSK OL SSZ'bOl4 I6ar 19E5L~Ol I -PPtl uo,un 9b/ 8 S6L QnS f Pl I 1 app 8 -a ARO'ullBuy B9'l LC'Z4 80'!94'44 80'SIl'l4 09591'[4 09'99L'l4 B9119'lOlf 19008Sb5L~Otl Wtlugp 60Z Pl I lPlaiaO'WANtl 1S001YN31tll A0N3101i30 1S001tlA131tl1 1S001tla31tll 1500 A0N3101i30 1500 1N3WSS3SStl 13N 1tl101 1500 1500 M1tlM3015 31tlNad N3M3S dWtla N 1tltl31tll 31tlNad a3M3S 31tlNAld 1N3W3AOadW1 1N3W3AOadWI 1N3W3AOadWI 1N3W3AOadWl N1WA a3BWON NOLLdIa0S30101 3WtlN a3NM0 '•'~' '' dtlON]NtlH 313a0 00 AAItlLNYS 1tl101 31tlNad a3M3S Aatl11NtlS 13N Aatl1NVtlS 13N 301Atl3S a31tlM 0llfilld 1tl101 0NIAtld 13N ONIAtld 13N NOI1tlfIltlA 130atld Anbrpn0 )o AI!0 a47 )o IPunoO Al!~ WI A9 %ol 4ana to auo4enlen sn4 eyl ae Pw~y Ade~ey aye lol 4aee elROddo umoys auo9enlen s4{ W e lol 4asa lwleBe Pesawae p %PSaodoid Wnowe W14Wn ~eyle6% %P sot w umoys lueweno~dwl eL9lol Pesseses a9 % Peaodoltl lol yaee moos %Pauwu%aP A9ue4 si ePPa4as Buyngl% WL sooz'S Alnr aAda S1N3WSS3SSV 03SOd074d ONY NOLLYnItlA 30 31n03HOS ltlNl3 (Yll1A O11NtlAMS)1O3fONd NOLLOntlLSN003L 133MLS HSnN tlM01'3nOn8nO a0 Ally CITY OF DUBUQUE, IOWA RUSH STREET RECONSTRUCTION PROJECT (BRYANT TO VILLA) FINAL SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS DATE: JULY 8, 2009 The folbwang saMdule is Mraby debnninetl to show each lot proposed b be assessed for the improvement shown in 8ie Btle toge8ier wOh 8ie amaunl proposed to ba assessed agas~st each lot entl the valuations shown opposite each lot ere hereby fiord es 8re true veluatlona of such Iota by the Ciry Council of the City of Dubu9ue. NET PAVING NET PAVING TOTAL PUBLIC WATER SERVICE NET SANRARV NET SANITARY TOTAL SANRARV PROPERTY OWNER NAME LOT DESCRIPTION PARCEL VALUATION IMPROVEMENT IMPROVEMENT IMPROVEMENT PRNATE StINER PRNATE SEWER PRNATE CONCRETE SEWER PRNATE HANDICAP MMP TOTAL NET NUMBER WITH IMPROVEMENT COST DEFICIENCY COST LATERAL COST LATERAL COST L.1ITERAL LATERAL COST SIDEWALK COST COST ASSESSMENT DEFICIENCY Kroner, JaN A. Ld 141 Union Atld. 1425:161-023 58/,020.31 57,soD.ze 51,500.28 51,32005 57,331.05 §2,820.31 Letlner, Dewane E.BJOen J. Ld 117 UNOn Atltl. 1425453008 353,39595 51,4]5.90 51,475.90 51,32005 57,320.05 §2,]9595 Ley,Jdn Ld1-2-5155'-190 Union Atld. 1425-433011 .73,806.44 Efit0.B1 581881 51,35504 38741 51,28]83 §1,908.44 LbtlaH, Berry A.BRhmK Ld 199 Unbn Adtl. 1425-456010 §297,1fi0 fib 51,4]5.90 51,4]590 3]48.81 §2,272.]1 LkbsH, Berry A.8 RMS K E. 30 Ld 198 Udon Add. 1425455010 w/ Ld 199 Union Atltl. 5]3795 5737.95 1 §737.95 LYenfalax, Ilea A. We Hoyne, lba A. Ld 1 Sub 145 8146 Union Atltl. 1425361 -0OB §122,64014 E1764o 5178.40 5178.40 LNBnteWr, Ilea A. bs Hayrc, Ilea A. Ld 2 Sub 145 8146 Union Atltl. 1425361-008 w/ Lila /Sub 145 819fi Union Add. §3fi1 ]5 x361.75 (381.75 Lochner Brlsn, J. 8 McLeughBn, Kimberly N N fi5 - 5135' Ld 122 Upon Atld 1425382-01 ] EB5 989.42 §324 58 §324.58 5324.58 Lochner Brien, J 8 McLaugNb, gmbedy N. 5 fi5 - N 105 - E 12 Let 123 aEm Udon Atltl. 1425382-01 ] wl N fi5' - S 135' Ld 122 Unan Atltl. ffi4.83 Efi4 &3 584 B3 LaMdhde, Mrk G. N tOD Ld 12] Unm Add. 10.25382-007 x62,181 9B §38199 538198 5381.98 Mekas, DevM L 8 Olarie L Ld 1 puinre Strad Sub 1425-454015 3128,988.06 SBBB Ofi 5888.06 5888.06 Mskovec,fmkF BMery Ld 17/Union Adtl. 1425384012 5122,659.46 §1,484.3] 51,4843] 51,075.10 51,075.10 §?55996 McAUa, Brlsn J. 8 Mbtlepe M Ld 5 d Sub d Lila 10.5 8 146 Udm Atltl. 1425361-019 5108,0.53 §43? ]8 543? 7B ET/062 x935.13 x935.13 §2.138 53 Markus, BNn J. 8 MbadM M Ld fi d Sub d Lila 145 8 146 Union Atltl. 1425361-019 w/ Ld 5 d Sub d Lats 145 8 146 Unbn Add. 3931 O1 5931 01 3931 O1 May. Dabre J. Lilt-1b Unbn Atltl. 7425361 J121 588,312.02 3135986 §135986 584?OS 31010.11 31040.11 53.21202 I McCenon, Hugh J. d Dardhy Ann I Ld 2 - S 1fi5' - Ld 191 Unbn Atld. 1 74251550761 513.957.32 I 31 457 32 I 1 5145] 32 I I I I I I I (1,457.32 I McCanan, HUgh J.d DardhY Ann 1 5. 1fi51d 195 Udan Adtl. 8Ld 1-S 165 Ld 794 Unbn Add8lan 11425455-0771 5747,28/.56 1 57,274.50 1 1 51.27450 1 1 E1,250.W 1 1 31,250.06 1 1 52,464.56 1 McCadfry, DamenJ BAngelsK 1 Ld 169Umn Atld 114253840041 5127,758.71 1 51,576.% 1 1 51,576.86 1 1 51,780.00 1 1 57,780.08 I I 52,]56.]4 1 McCktln, AmsMa 1d 118 Udm Atld 11425-453-0071 565,020.99 N,47590 51,47590 57,14508 1 1 57.745.08 52,620.99 McClsin, Bob H., Jr. 8 McClab Kam A Ld 2(19 UNOn Atld 1 16251590011 5737,681 21 57.305.97 (1,305.97 1 5375.24 1 1 5375.24 St eB1 21 1 McCUNOUgh, Robed J.BKany 1 S1fi5 Ld 191 Union Add. 11425455-0131 5722,36741 1 31.457.32 1 1 31.457.32 1 1 51,77008 1 1 61,11608 1 1 52.587.67 1 HdWd, CeBry L«dTroy,lm W. 1 Ld 178 Unbn Adtl 11425384-0131 5703,35988 1 t7,10478 1 1 51.481.78 1 57,0]510 31,075.10 52.559.88 08ver, DOrokl W.BDebree M. 1 Ldt-128 UNOn Adtl. 17425387-0181 t71,42B.82 1 51,26/.67 1 1 67,28/.67 1 5865.74 5865.11 x2,729.82 Oatarhern, CelMnne M. 1 Ld 7]4 Udm Atltl. 17425384-0091 570,387.55 57,533.77 1 57,533.71 51,508.75 51,745.08 31,145.08 54.187.55 PepedhMn, Rriberl A. 1 5 ]O d S 135 d Ld 122 Union Atltl. 1425382-0181 t99,57].00 51,060.47 1 51,060.47 1 57,075.10 51,075.10 52.135.57 PepedhKn, Rdert A. E 6 of B 70 d E 12 d Ld 123 Union Atltl. 1425-:582-0181 w/ S 70 of S 735' d Ld 122 Unbn Add. 514144 1 5747.44 1 I 5/41.40 Puks,SMpe M. Ld2-2-1-186 UNOn Add. 174250.51-0091 5137,781.85 57,981.77 1 51,981.77 1 51,18008 1 51,100.08 53,181.85 Pereom, JUlis A. Ld 13/UNOn Atld 1_m.........5 5]2,29736 57,481.27 1 51,481.27 1 1 51,11008 1 51,110.09 52.591.38 Power, Fbrence M.EJdMI 5130 Ld 135 Union Add. 114253800111 546,929.35 57,483.33 1 57,183.33 1 1 51,35504 -59.03 1 51,346.01 1 52,829.35 Rsnean, Cary J. 1 N fi0 - S 13D Ld 13fi Union Adtl. 1 10.253840191 578,H6 95 1 5308.48 I 5308 ~ I I I 1 5308.48 Remm, Cary J. 1 .l N fi0' - S 130' Ld 13] Union Adtl. 8 strip d Nritl 3' witle on Hdty St. runnkg `4 14253800191 wl N fi0' - 6 130 La 136 Union Add. 1 5308.48 I ~.~ I I I 1 I 5308.98 Rant, CYKNtoplw J. B Ranek, Reenter L. 1 Ld t-189 Udon Adtl. 1 142515]-0031 570/,245.83 1 51,830.76 1 1 51,830.76 1 1 31,215.07 51,215.07 1 I 1 52,846.63 Redtlkg, MMk D.85uaen J. Ld 19fi Udm Adtl. 11425-458-00]1 5753,205.08 1 51,229.98 1 51,729.98 1 1 31,075.10 51,075.50 1 1 1 52305.08 Deulmeyar, Cheri M. Ld 7-188 Uaon Atltl. 1 14254540131 396,682 % 1 5110.82 1 1 5140.82 I I I I 1 5140 B2 1 Deulmeyar, Gnw M. La 2-2-189 Unbn Add 1 14251540131 w/ Ld 1-189 Union Atltl 1 3~8 80 1 1 5808.84 I I I I I I I 3808.84 1 Dearrelwr, Gnw M. La 2-188 UNa1 Add. 14254540131 wl Ld 1-1 B9 Union Atltl 1 36:15.33 1 1 5635.33 I I I I I I I 383533 1 Karin, Slaver J.BNency C. 1 Ld2-7-133 Unbn Add. 1425380016 598,204.11 1 31,059.02 1 1 5105902 1 1 31,145.08 1 1 51,115.08 I I I az,2w.71 1 Rating, Jame C. B KNen L. 1 La 124 UNan Add. 1425382-011 5130,853 56 I 51,475.90 1 1 51,4]5.90 1 1 3]77.66 1 1 5777.68 I I 1 52.253.58 1 Sabers, NVen J. Ld 775 Urkon Add. 742338/-010 5122,31090 51,523 iB 51,523.18 528]76 1 528].76 I I I 51.810.94 1 Sdurarbxh, Drvb A. d ParMOpa M. 1 Ld 2-25185'-190 Union Atld 1425455-010 551,762.70 5162.70 5162.]0 I 1 I I I I 5162.70 1 Schrtkd, Melvn J. Juke M. Kurece4SChmd11 Ld 1-118 Union Adtl. 7425-131010 579,183.87 5283.67 5261.67 1 I 1 5263.61 1 SdYxx. Fred B.B Bktler,AMre. 1 Ld2d2d SUbd Lda 1848185 Union Adtlilim 114254574709 5107,48838 51,032.38 51,032.39 1 57,W5.11 1 1 51005.11 I I I 52.03].50 1 Sdnee. Fred B.8 Bach. Antra 1 Ld 2-1-1-2 of Sub d Lds 1898 1 % Union Addition 1 1425457-0041 wl La 2 d 2 d Sub d Lae 7848 185 Union AddBbn asso ea f550.eB I I I asso ee 1 Suhlx,wcher. Pait Thomas 1 Ld 2 -128 Union Adtl. 1 10.25381-0151 5]2,777.23 521113 5211.23 I I azn 23 1 Schxar2, Jellrey L 8 Krier, TnM M. 1 Ld 2-776 Unbn Add. 1 1425153-011 1 st 17,212.23 51,212.23 1 61,212.23 50.00 I I a+.zlz.z3 1 SheMen, Robed J.B CheriL 1 La1ofE45'1-1-1-1o/SW.2 01 1 69 8 165 Unwn Add. 11425-15]-00]1 §8,238.12 I 51,113.33 I -5304.37 I 3808.98 51,320.05 -574.22 51,24583 I I 52,051.]9 1 SheMen, Robed J. 8 Cheri L 1 LIX 2 0l E 0.5' 1-1-1-1 of Sub. 2 d 184 8185 Unwn Atltl. 1 142545]-00] 1 w/ Ld 1 of E 45' 1-1-1-1 d Sub. 2 d 184 8 185 Union Atltl. 1 54.75 I 1 5175 I I I I x4.75 1 SheMen, Robed J. 8 Choi L I Ld 212 Udon Add 1 10.25457-0081 52,]22.05 1 5]22 OS 1 -¢11.54 1 ffi5D61 I 1 I I 5680.51 1 SheMSn, RdKM J. 8 Chill L 1 lot 213 Union Atld 1 10.25457-0091 55,61].2] 1 §299 fi0 1 1 5299 BO I 1 I 5299.60 SheMSn, Robert J. 8 Cheri L. Ld 1-2-1-2 d Sub Lals 185 8 181 Unbn Adtl 1425157-0091 wl Ld 213 Union Atld. 1 51,180.40 -3312.95 1 384] 45 1 584].45 1 Sheehan, Ra1en J. 8 ChM L. I Ld 2-2-1-2 d Sub Lila 185 8184 Union Atltl 1 1425157-0091 wl Ld 213 Unbn Add. 1 5257.2] 1 1 525] 2] 1 1 1 525].2] Sherman,Tbloth/J BNeIty M. I Ld3Udm Adtl. Nat 7425387-0781 Et 15,229.]1 1 5886.38 1 E8fi638 1 §818.24 1 51,14508 51,10.5.08 52,829.]7 SL CdumbMM'a Church 1 La 73 Mneral Ld l5 11036-103-0061 54,693.04 1 553.0/ I 353.09 I I I I 55304 SL CdunddM's Chuch I Ld 21 Mineral Ld 45 1425384001 1 5461,445 B2 1 5181.23 1 5181 23 1 52,]95.81 1 52,488.92 1 52,486.92 54.500.00 1 59,943.96 SL Cdumdtl8a's Church 1 Ld 2-71 Mineral La 45 1 1425384 001 w/ Ld 21 M.L 45 1 54897 1 x.97 1 1 I 546 g7 SL CdunbNlh's Church 1 E 50 Ld 158 Unbn Atltl. 1 10.25384-001 1 wl La 21 M.L. 45 I 31.884.42 1 1 51,884.42 I I I I I I 57,801.42 SL CdunbblM'e Church La 759 Udm Adtl. 1 1425384001 w/ Ld 21 M.L. 45 Ez.280.57 1 52,280.51 I I I 52,280.51 1 St. CdumbkYN'e Church I Ld 180 Unbn Add. 11425381-001 w/ Ld 21 M.L. 45 1 32,208.28 I I 52,318.28 1 I I I I I 52,206.26 St. ColumbkBa'a Church I al 161 Udon Atld 1 1425381-001 w/ Ld 21 M.L. 45 52.288.89 1 52.288 89 1 5?2BB.~ 1 51. Cduml4d8a'e Church Ld 162 UNm Atld 1 1425381-0011 w/ Ld 21 M.L. 45 1 52,355.97 1 I 52.35597 I I 1 I I I I 52,355.97 1 81. CokmldtlM'e Church Ld 1fi3 UNOn Atltl 1 142538/-0011 wl Ld 21 M.L. 45 1 32.2%.60 1 I 52.299.80 I I I I I I I 52,299.60 SI. Cahendd3e'e Church Ld 169 Unbn Adtl. 7425384-001 I w/ Ld 21 M.L. 0.5 52,362.34 52.382.34 I 52.38234 SI. CoNnbl4Ee'a CMech Ld 185 Unbn Aril. 1425384001 I w/ Ld 21 M L. IS 1 52,306.88 52,308.88 I §2,308 88 SI. Cdumbl4Ee's Caech La 188 Unbn AtM. 1425384001 I w/ La 21 M L. 45 1 52,310.21 52,310.21 ~ 1 52.310 27 SI. CdumbNXa's Chump E SO of Ld 758 Urkon Add 1036103-0021 5788.94789 1 51,792.89 51,792.89 I I 51 ]92.89 3l. Cdumbki8e's Church 1 La 757 Unbn Add. 1036/DiW31 5187,638.90 1 52,213.54 I 1 52,213.54 I 1 I I I I 52.21354 1 SL CduIdWIM'n Church 1 W 10 La 756 Union Atltl 1036103-0031 wl Ld 15] Union Add 1 5373.37 I I 3373.37 1 I I I I I 53]33] 1 BL CdumOkilb's Church I Ld2-1-1-1dMVwral La 48 7036126(1021 §?24062 I f20D 62 1 1 531082 1 1 I I I I I 5200.62 Page 2 of 3 CITY OF DUBUQUE, IOWA RUSH STREET RECONSTRUCTION PROJECT (BRVANT TO NLLA) FINAL 3CHEDULE OF VALUATION AND PROPOSED ASSESSMENTS DATE: JULY 6, 2009 The (olbwirp schedule is hereby determined to show each lot proposed to be assessed br Ole improvement dawn in Ore trtle together w8h Ore amount proposed to be essessetl egeirlst each lot antl Ow veluetrons shown opposite each lol are hereby fiord as Ole true velueOOrrs of such lots by Ore City Council of the COy o/Dubuque. R E NET PAVING NET PAVING TOTAL PUBLIC WATER SERVICE NET SANITARY NET SANTARY E TOTAL SANTARY CONCRETE HANgCAP RAMP TOTAL NET PNOPERTYOWNER WIME LOT DESCRP1gN PA C L NUMBER VALUATION WITH IMPROVEMENT IMPROVEMENT IMPROVEMENT IMPROVEMENT PRNATE SEWER PRNAT SEWER PRNATE LATERAL SEWER PRNATE SIDEWALK COST COET ASSE85MENT COST DEFICIENCY COST LATEMLCOST UITERAL COST DEFICIENCY LATERAL COET I SL CalumOkSe's Church I Ld1 o15t. Cabmddtle Addilbn 170347250241 5397,228.38 52,10838 I 52,108.38 52,108.38 I SL CdunlbNlk's Church I Ld 138 Union Atltl. 11425-381-0251 538,05133 (2,19283 I 32,192.83 52,192.fi3 1 St Cdumdd8s's Church I Ld 139 Ullian Add. 1 1425381-0251 wl Ld 138 in Unbn Add 52,195.88 52,195.88 E2.195.Bfi 51. Cdumddlk's Chuch I Lq 2-140 Urwn Add. 1 1425381-0251 wl Ld 1381n Union Add, 5203 OS 5203 OS 50.00 5203.05 Harimck, Jere LB NlclalasC ~ 595 Ld 120 Union Add. 114254530051 592,13993 51,212.23 51.212.23 51,390.03 -582.33 57,327.70 52.538.93 Oroeaskr, EmestJBHYMn, NbakA ~ Ld 119 Unbn Adtl. 1425053W61 5105,83108 51,17590 ~ 51,47590 ~ ~ 5855.18 (855.18 52,131.08 I ThB, Tlwree J B NNSCh, Mary J. ~ 5 1&5 Ld 193 Unian Adtl. ~ 14250.55015 ~ f103,Bfi6.B2 51,45732 ~ 51.0.57 32 ~ 5799.43 1 51,215.07 51,215.0] 53.488.82 I Trerdz, Krkty M. I 570 Ld 13]Union Add. 114253800121 588,793.78 ~ 57,080.47 ~ 57.080.Q ~ 5818.24 57,21507 ~ 51,2150] 53,093.78 I Voss, Carrbro A. I N. 4D Ld 122 Unm Add. 1 1425382-0191 E~.B09.02 ~ §90.85 ~ 59035 ~ ~ 590.85 I Voss, Carlnre A. I N 40 - N 105' 512 Ld 123 Udon Add. 1 1425382-0191 w/ N. 40 Ld 122 Union Adtl. I 578.1 ] 578.1] E1B.77 Waker, HOwud ar EStMr 1 Ld 206 Union Add. 11425459-0041 518,2]5.16 1 51399.82 1 ~ 5139992 ~ 1 5375.24 ~ 5375.24 57,775.78 Wa0er, HOwartla ENMr Ld 205 UNOn Add. 114250.59-W51 599,9]9.99 I 51,39992 1 ~ 51,39992 ~ 1 57,180.08 1 21,180.08 52,579.98 McCkln, Robed H . Jr. E McCkk Karen A. ~ Ld 209A Urtlon Add. IVawad Unbn) 1 1425459-0131 51,799.92 1 51.399 92 1 -5949.94 5149.98 I I 3449 98 TOTALS:1 5182,858.50 11,377.88 1 NBO,N1.52 1 521,313.78 1 f70,3T1.]e 1 ,5288.87 I 570,117.02 5x.690M 1 51,600.00 ~ 5265,127.]8 Page 3 of 3 City of Dubuque -Engineering Division Final Payment Form & Grubbing. Inch Diameter BID ITEM DESCRIPTION UNIT UNIT COST Q O DATE AMOTO DATENED DEl~OUTiON & RE~AOVAL 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 PAYMENT NO: COUNCIL FINAL DATE: June 26, 2009 PROJECT NAME: RUSH STREET (BRYANT-VILLA) RECONSTRUCTION CONTRACTOR: Horsfield Construction, Inc. CONTRACT AMOUNT: $1,657,853.10 Remove Pavement Remove Curb & Gutter Abandon Existing Pipe Remove Existing Manhole Remove Existing Storm Intake Remove, Salvage and Replace Brick Pavers ExcAVATroN ~ STONE Excavation, Unclassified Excavation, Rock Backfill, Limestone Backfill, Topsoil Granular Sub-Base Graded Stone Base 3" Crushed Stone Base Trench Stabilization Stone PAVEMENT PC Concrete Pavement, (7") w/ Integral Curb, Class "C" HMA 300k Surface Course, 1/2" (PG 64-22) Fixture Adjustment PC Concrete Driveway, 6", Remove & Construct PC Concrete Sidewalk, 4", Construct PC Concrete Sidewalk, 4", Remove & Construct PC Concrete Sidewalk, 6", Construct PC Concrete Sidewalk, 6", Remove & Construct PC Concrete Sidewalk, Exposed Aggregate, 6", Remove & Construct PC Concrete Curb and Gutter, 2.5', Construct PC Concrete Steps, Remove & Construct PC Concrete Access Ramp, Detectable 6" Subdrain, Perforated Plastic Drain Tile Reinforcing Steel, #4 Epoxy Coated, Furnish and Install STQRM SEWER Intake 101-B Intake 101-B, Special Intake 104-B Reconstruct, Intake 101-B Manhole 48" Diameter, Complete 12" PVC, Schedule 40 w./22 112 Degree 12" Bend Manhole 72" Diameter, Complete Storm Sewer, 15" RCP, CL III Storm Sewer, 18" RCP, CL III Storm Sewer, 21" RCP, CL III Storm Sewer, 30" RCP, CL III Storm Water Curb Opening Neenah R-3262-3 Existing Drain Tile Connection to InIeUCurb Opening SANITARY SEWER 6" PVC w./Bedding 8" PVC w./Bedding 48" Diameter Manhole Base 48" Diameter Manhole Sidewall 48" Diameter Drop Manhole Sidewall Manhole Frame & Cover 49 4" PVC Lateral w./Bedding 50 8"x4" PVC Wye 51 8"x6" PVC Wye 52 8"x8" PVC Wye 53 8"x6" PVC Eccentric Reducer ID SY LF CY Each Each SF CY CY Ton SY Ton Ton Ton Ton $18.00 $5.00 $2.00 $100.00 $250.00 $250.00 $10.00 $5.00 $75.00 $4.60 $6.00 $12.50 $11.20 $11.00 $16.00 SY $26.55 Ton EA $100.00 $150.00 SY $32.50 SF SF $2.50 $3.00 SF $3.00 SF $3.50 SF LF $7.00 $13.00 LF $20.00 Each $150.00 LF $8.50 LF $1.00 Each Each Each Each Each LS Each LF LF LF LF Each Each LF LF Each VF VF Each LF Each Each Each Each $1, 500.00 $2, 000.00 $2, 500.00 $1, 300.00 $1, 800.00 $500.00 $2,500.00 $26.50 $34.00 $35.00 $46.00 $86.00 $120.00 $35.00 $25.40 $790.00 $98.00 $115.00 $262.00 $31.45 $180.00 $190.00 $200.00 $210.00 90 230 6,460 0 27 22 114.75 10,832.96 284.80 20, 358.08 2, 687 5,689.64 1,680.53 11,002.17 0 13,639.45 184.79 56 1,042.31 802.40 18,314.51 109.80 8,692.66 0 160.7 66.35 24 6,156.6 2,334 23 0 2 5 7 1 3 1,112.9 217.0 878.6 133.4 14 16 27.1 3,205.00 13 99.96 13.89 13 1, 548.00 68 3 $ 1,sza.oo $ 1,150.00 $ 12,920.00 $ - $ 6,750.00 $ 5,500.00 $ 1,147.50 $ 54,164.80 $ 21,360.00 $ 93,647.17 $ 16,122.00 $ 71,120.50 $ 18,821.94 $ 121,023.87 $ 362,127.50 $ 18,479.00 $ 8,400.00 $ 33,875.08 $ 2,006.00 $ 54,943.53 $ 329.40 $ 30,424.31 $ - $ 2,089.10 $ 1,327.00 $ 3,600.00 $ 52,331.10 $ 2,334.00 $ 34,500.00 $ - $ 5,000.00 $ 6,500.00 $ 12,600.00 $ 500.00 $ 7,500.00 $ 29,491.85 $ 7,378.00 $ 30,752.40 $ 6,136.40 $ 1,204.00 $ 1,920.00 $ 948.50 $ 81,407.00 $ 10,270.00 $ 9,796.08 $ 1,597.35 $ 3,406.00 $ 48,684.60 $ 12,240.00 $ 570.00 $ 200.00 $ 630.00 54 Locate Existing Lateral/Exploration Each $150.00 72 $ 10,800.00 55 4" DIP, Class 52 w./Polywrap LF $25.50 43.5 $ 1,109.25 56 6" DIP, Class 52 w./Polywrap LF $26.00 3,489.3 $ 90,722.84 57 4" Mega Lug MJ Each $30.00 11 $ 330.00 58 6" Mega Lug MJ Each $50.00 93 $ 4,650.00 59 6" Bend MJ x MJ Each $190.00 11 $ 2,090.00 60 6"x4" Reducer Each $180.00 4 $ 720.00 61 4" Valve MJ w/Box Each $590.00 1 $ 590.00 62 6" Valve MJ w/Box Each $650.00 26 $ 16,900.00 63 6"x6"x4" Anchoring Tee MJ Each $285.00 1 $ 285.00 64 6"x6"x6" Anchoring Tee MJ Each $340.00 15 $ 5,100.00 65 4" - 441 Sleeve Each $235.00 3 $ 705.00 66 6" - 441 Sleeve Each $250.00 2 $ 500.00 67 Hydrant MJ Each $2,490.00 8 $ 19,920.00 68 Tracer Wire Access Box Each $100.00 6 $ 600.00 69 Copper Tracer Wire LF $0.15 3,552.81 $ 532.92 70 3/4" Copper Service Line TYPE K LF $21.40 646.5 $ 13,835.10 71 1" Copper Service Line TYPE K LF $35.00 27.0 $ 945.00 72 1 1/4" Copper Service Line TYPE K LF $50.00 8.00 $ 400.00 73 Water Service Lines Stop Box, Curb Stop, Tap Installation 3/4" Each $500.00 20 $ 10,000.00 74 314" Copper Service Reconnect Each $300.00 47 $ 14,100.00 75 1" Copper Service Reconnect Each $325.00 1 $ 325.00 76 1 1/4" Copper Service Reconnect Each $400.00 1 $ 400.00 77 Insulation Board, 2-Inch SY $10.00 7.1 $ 71.00 78 Conduit, 4" PVC Sch 40 w/Trace Wire LF $9.50 396.1 $ 3,762.95 79 Conduit, 4" PVC Sch 40 w/Trace Wire (with 4-1" HDPE Inside) LF $11.40 3,649.6 $ 41,605.44 80 Fiber Optics Junction Vault, Precast Concrete, Depth 2' Each $2,100.00 18 $ 37,800.00 81 Fiber Optics Junction Vault, Precast Concrete, Depth 3' Each $2,200.00 1 $ 2,200.00 MiSGEI.LANEOl1S 82 Sawcut, Concrete LF $3.00 679.5 $ 2,038.50 83 Sawcut, Asphalt LF $3.00 255.6 $ 766.80 84 Remove and Replace w.! New Hand Railing LF $35.00 7.0 $ 245.00 85 Sod SY $5.50 2,934 $ 16,137.00 86 Watering MGAL $47.00 81.812 $ 3,845.16 87 Tree Preservation Measures LS $500.00 1 $ 500.00 88 Dust Control Surface Treatment MGAL $20.00 0 $ - 89 Erosion Control Plan -Operating Procedures LS $1,000.00 1 $ 1,000.00 90 Traffic Control & Safety Control LS $18,750.00 1 $ 18,750.00 91 Sign Post, Removal & Installation EACH $150.00 27 $ 4,050.00 92 Wooden Fence, 48", Remove and Replace LF $15.00 0 $ - 93 Adjust Water Service Stop Box Each $125.00 36 $ 4,500.00 94 Mobilization LS $8,500.00 1 $ 8,500.00 TOTAL AMOUNT EARNED TO DATE: $ 1,652,177.94 CHANt3E ORDER (RUSH STREET) • E~ N~"#E~t C1 Install DIP drop manhole in lieu of PVC drop (off PSMH #3 C1 Sawing of storm manholes C1 Repair water main break on 9/8/2007 C3 Re-trimming & Re-setting of Grades for Paving (1+50 - 7+00 ) C3 Extra for 12" PVC and Manhole Core @PSMH#10 C3 Extra for 3 Hydrant Extensions C3 Handicap Access @ the East End of St. Columbkill's School C4 Furnish & Install 16" DIP, Class 52 w./Polywrap Storm Sewer C5 Repair water main break on 4/7/2008 LS $1,098.25 1 $ 1,098.25 LS $500.00 1 $ 500.00 LS $1,239.00 1 $ 1,239.00 LS $2,735.00 1 $ 2,735.00 LS $1,964.00 1 $ 1,964.00 LS $1,275.00 1 $ 1,275.00 LS $9,177.45 1 $ 9,177.45 LF $63.00 29.0 $ 1,827.00 LS $984.00 1 $ 984.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 20,799.70 TOTAL AMOUNT EARNED TO DATE: $ 1,672,977.64 TOTAL DUE CONTRACTOR: $1,672,977.64 ENGINEERING: $188,482.28 TOTAL CONSTRUCTION COST: 51,881,439.92 TE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount I work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager City of Dub e APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE The undersigned, ~.{-nC-. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: ! T F517~ ~'~ r~ri 7 BY: TITLE: 12 DATE: (~' ~'( City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL DATE: June 26, 2009 PROJECT NAME: RUSH STREET (BRYANT-VILLA) RECONSTRUCTION CONTRACTOR: Horsfield Construction, Inc. CONTRACT AMOUNT: $1,657,853.10 BID ITEM DESCRIPTION UNIT UNIT COST QUANTITY TO DATE oE~vunor~ & R~+rwvAL ,. 1 Clearing 8 Grubbing, Inch Diameter ID $18.00 90 2 Remove Pavement SY $5.00 230 9 10 11 12 13 14 15 16 17 16 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 Remove Curb & Gutter Abandon Existing Pipe Remove Existing Manhole Remove Existing Storm Intake Remove, Salvage and Replace Brick Pavers Exc~vanori s sTr3rrE Excavation, Unclassified Excavation, Rock Backfill, Limestone Backfill, Topsoil Granular Sub-Base Graded Stone Base 3" Crushed Stone Base Trench Stabilization Stone PAl/EI~IENT PC Concrete Pavement, (7") w/ Integral Curb, Class "C" HMA 300k Surface Course, 1/2" (PG 64-22) Fixture Adjustment PC Concrete Driveway, 6", Remove & Construct PC Concrete Sidewalk, 4", Construct PC Concrete Sidewalk, 4", Remove 8 Construct PC Concrete Sidewalk, 6", Construct PC Concrete Sidewalk, 6", Remove & Construct PC Concrete Sidewalk, Exposed Aggregate, 6", Remove & Construct PC Concrete Curb and Gutter, 2.5', Construct PC Concrete Steps, Remove & Construct PC Concrete Access Ramp, Detectable 6" Subdrain, Perforated Plastic Drain Tile Reinforcing Steel, #4 Epoxy Coated, Furnish and Install 3Tt3R111 S@IAiER Intake 101-B Intake 101-B, Special Intake 104-B Reconstruct, Intake 101-B Manhole 48" Diameter, Complete 12" PVC, Schedule 40 w./22 1/2 Degree 12" Bend Manhole 72" Diameter, Complete Storm Sewer, 15" RCP, CL III Stonn Sewer, 18" RCP, CL III Storm Sewer, 21" RCP, CL III Storm Sewer, 30" RCP, CL III Storm Water Curb Opening Neenah R-3262-3 Existing Drain Tile Connection to InIeUCurb Opening SANCfARY SEWER 6" PVC w./Bedding 8" PVC w./Bedding 48" Diameter Manhole Base 48" Diameter Manhole Sidewall 48" Diameter Drop Manhole Sidewall Manhole Frame & Cover 4" PVC Lateral w./Bedding 8"x4" PVC Wye 8"x6" PVC Wye 8"x8" PVC Wye 8"x6" PVC Eccentric Reducer LF CY Each Each SF CY CY Ton SY Ton Ton Ton Ton SY Ton EA SY SF SF SF SF SF LF LF Each LF LF Each Each Each Each Each LS Each LF LF LF LF Each Each LF LF Each VF VF Each LF Each Each Each Each $2.00 $100.00 $250.00 $250.00 $10.00 $5.00 $75.00 $4.60 $6.00 $12.50 $11.20 $11.00 $16.00 $26.55 $100.00 $150.00 $32.50 $2.50 $3.00 $3.00 $3.50 $7.00 $13.00 $20.00 $150.00 $8.50 $1.00 $1, 500.00 $2,000.00 $2, 500.00 $1, 300.00 $1,800.00 $500.00 $2,500.00 $26.50 $34.00 $35.00 $46.00 $86.00 $120.00 $35.00 $25.40 $790.00 $98.00 $115.00 $262.00 $31.45 $180.00 $190.00 $200.00 $210.00 6,460 0 27 22 114.75 10,832.96 284.80 20,358.08 2,687 5,689.64 1, 680.53 11,002.17 0 13,639.45 184.79 56 1,042.31 802.40 18,314.51 109.80 8,692.66 0 160.7 66.35 24 6,156.6 2,334 23 7 1 3 1,112.9 217.0 878.6 133.4 14 16 27.1 3,205.00 13 99.96 13.89 13 1,548.00 68 3 1 3 AMOUNT EARNED TO DATE $ 1,620.00 $ 1,150.00 $ 12,920.00 $ - $ 6,750.00 $ 5,500.00 $ 1,147.50 $ 54,164.80 $ 21,360.00 $ 93,647.17 $ 16,122.00 $ 71,120.50 $ 18,821.94 $ 121,023.87 $ - $ 362,127.50 $ 18,479.00 $ 8,400.00 $ 33,875.08 $ 2,006.00 $ 54,943.53 $ 329.40 $ 30,424.31 $ - $ 2,089.10 $ 1,327.00 $ 3,600.00 $ 52,331.10 $ 2,334.00 $ 34,500.00 $ - $ 5,000.00 $ 6,500.00 $ 12,600.00 $ 500.00 $ 7,500.00 $ 29,491.85 $ 7,378.00 $ 30,752.40 $ 6,136.40 $ 1,204.00 $ 1,920.00 $ 948.50 $ 81,407.00 $ 10,270.00 $ 9,796.08 $ 1,597.35 $ 3,406.00 $ 48,684.60 $ 12,240.00 $ 570.00 $ 200.00 $ 630.00 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amou fall work required to complete the above improvement. APPROVED: Michael Van Milligen, C' er City of Dubu , I a APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, ~ r~ ~ C_.pr~5 ~~wt ~C contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for sa~id0im~provement. -~,,., 1 - ~, 7~ CONTRACTOR: ~ j ]~~/` ~~~i 1 r ~'~I IOYI _L/jC_ BY: `~ TITLE: P~ ~/~//f I ~~'~'r~c`GG/' , DATE: (p 1~~~~ 54 Locate Existing Lateral/Exploration CATER MAIN 55 4" DIP, Class 52 w.lPolywrap 56 6" DIP, Class 52 w.JPolywrap Each LF LF $150.00 $25.50 $26.00 72 43.5 3,489.3 $ $ $ 10,800.00 1,109.25 90,722.84 57 4" Mega Lug MJ Each $30.00 11 $ 330.00 58 6" Mega Lug MJ Each $50.00 93 $ 4,650.00 59 6" Bend MJ x MJ Each $190.00 11 $ 2,090.00 60 6"x4" Reducer Each $180.00 4 $ 720.00 61 4" Valve MJ w/Box Each $590.00 1 $ 590.00 62 6" Valve MJ w/Box Each $650.00 26 $ 16,900.00 63 6"x6"x4" Anchoring Tee MJ Each $285.00 1 $ 285.00 64 6"x6"x6" Anchoring Tee MJ Each $340.00 15 $ 5,100.00 65 4" - 441 Sleeve Each $235.00 3 $ 705.00 66 6" - 441 Sleeve Each $250.00 2 $ 500.00 67 Hydrant MJ Each $2,490.00 8 $ 19,920.00 68 Tracer Wire Access Box Each $100.00 6 $ 600.00 69 Copper Tracer Wire LF $0.15 3,552.81 $ 532.92 70 314" Copper Service Line TYPE K LF $21.40 646.5 $ 13,835.10 71 1" Copper Service Line TYPE K LF $35.00 27.0 $ 945.00 72 1 1/4" Copper Service Line TYPE K LF $50.00 8.00 $ 400.00 73 Water Service Lines Stop Box, Curb Stop Tap Installation 3/4" Each $500.00 20 $ 10,000.00 74 3/4" Copper Service Reconnect Each $300.00 47 $ 14,100.00 75 1"Copper Service Reconnect Each $325.00 1 $ 325.00 76 1 114" Copper Service Reconnect Each $400.00 1 $ 400.00 77 Insulation Board, 2-Inch SY $10.00 7.1 $ 71.00 FIBER dPTIC3 78 Conduit, 4" PVC Sch 40 wlTrace Wire LF $9.50 396.1 $ 3,762.95 79 Conduit, 4" PVC Sch 40 w/Trace Wire (with 4-1" HDPE Inside) LF $11.40 3,649.6 $ 41,605.44 80 Fiber Optics Junction Vault, Precast Concrete Depth 2' Each $2,100.00 18 $ 37,800.00 81 Fiber Optics Junction Vault, Precast Concrete, Depth 3' Each $2,200.00 1 $ 2,200.00 MtSC6l.LAtiEOUS 82 Sawcut, Concrete LF $3.00 679.5 $ 2,038.50 83 Sawcut, Asphalt LF $3.00 255.6 $ 766.80 84 Remove and Replace w.J New Hand Railing LF $35.00 7.0 $ 245.00 85 Sad SY $5.50 2,934 $ 16,137.00 86 Watering MGAL $47.00 81.812 $ 3,845.16 87 Tree Preservation Measures LS $500.00 1 $ 500.00 88 Dust Control Surface Treatment MGAL $20.00 0 $ - 89 Erosion Control Plan -Operating Procedures LS $1,000.00 1 $ 1,000.00 90 Traffic Control & Safety Control LS $18,750.00 1 $ 18,750.00 91 Sign Post, Removal & Installation EACH $150.00 27 $ 4,050.00 92 Wooden Fence, 48", Remove and Replace LF $15.00 0 $ - 93 Adjust Water Service Stop Box Each $125.00 36 $ 4,500.00 94 Mobilization LS $8,500.00 1 $ 8,500.00 TOTAL AMOUNT EARNED TO DATE: $ 1,652,177.94 CHANGE ORDER (RUStI STREET) -EXTRA WORE{ ITEMS C1 Install DIP drop manhole in lieu of PVC drop lrD PSMH #3 C1 Sawing of storm manholes C1 Repairwater main break on 9/8/2007 C3 Re-trimming 8 Re-setting of Grades for Pavin (1+50 - 7+00 ) C3 Extra for 12" PVC and Manhole Core PSMH#10 C3 Extra for 3 Hydrant Extensions C3 Handicap Access @ the East End of St. Columbkill's School C4 Furnish & Install 16" DIP, Class 52 w./Polywrap Storm Sewer C5 Repair water main break on 4/7/2008 LS $1,098.25 1 $ 1,098.25 LS $500.00 1 $ 500.00 LS $1,239.00 1 $ 1,239.00 LS $2,735.00 1 $ 2,735.00 LS $1,964.00 1 $ 1,964.00 LS $1,275.00 1 $ 1,275.00 LS $9,177.45 1 $ 9,177.45 LF $63.00 29.0 $ 1,827.00 LS $984.00 1 $ 984.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 20,799.70 TOTAL AMOUNT EARNED TO DATE: $ 1,672,977.64 TOTAL DUE CONTRACTOR: $1,672,977.84 ENGINEERING: $188,462.28 TOTAL CONSTRUCTION COST: $1,861,439.92 City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL DATE PROJECT NAME: RUSH STREET (BRYANT-VILLA) RECONSTRUCTION CONTRACTOR: Horsfield Construction, Inc. CONTRACT AMOUNT: BID ITEM DESCRIPTION QEMOUTION ~ REItIG1VAL 1 Clearing & Grubbing, Inch Diameter 2 Remove Pavement 3 Remove Curb & Gutter 4 Abandon Existing Pipe 5 Remove Existing Manhole 6 Remove Existing Storm Intake 7 Remove. Salvage and Replace Brick Pavers EXGAVATiON & STONE 8 Excavation, Unclassified 9 Excavation, Rock 10 Backfill, Limestone 11 Backfill, Topsoil 12 Granular Sub-Base 13 Graded Stone Base 14 3" Crushed Stone Base 15 Trench Stabilization Stone PAVEMENT 16 PC Concrete Pavement, (7") w/Integral Curb, Class "C" 17 HMA 300k Surface Course, 1/2" (PG 64-22) 18 Fixture Adjustment 19 PC Concrete Driveway, 6", Remove & Construct 20 PC Concrete Sidewalk, 4", Construct 21 PC Concrete Sidewalk, 4", Remove & Construct 22 PC Concrete Sidewalk, 6", Construct 23 PC Concrete Sidewalk, 6", Remove & Construct 24 _PC Concrete Sidewalk, Exposed Aggregate, 6", Remove & Construct 25 PC Concrete Curb and Gutter, 2.5', Construct 26 PC Concrete Steps, Remove & Construct 27 PC Concrete Access Ramp, Detectable 28 6" Subdrain, Perforated Plastic Drain Tile 29 Reinforcing Steel, #4 Epoxy Coated, Furnish and Install STORM SEWER. 30 Intake 101-B 31 Intake 101-B, Special 32 Intake 104-B 33 Reconstruct, Intake 101-B 34 Manhole 48" Diameter, Complete 35 12" PVC, Schedule 40 w./22 1/2 Degree 12" Bend 36 Manhole 72" Diameter, Complete 37 Storm Sewer, 15" RCP, CL III 38 Storm Sewer, 18" RCP, CL III 39 Storm Sewer, 21" RCP, CL III 40 Storm Sewer, 30" RCP, CL III 41 Storm Water Curb Opening Neenah R-3262-3 42 Existing Drain Tile Connection to Inlet/Curb Opening 8AN1TAR1`SEWER 43 6" PVC w.lBedding 44 8" PVC w./Bedding 45 48" Diameter Manhole Base 46 48" Diameter Manhole Sidewall 47 48" Diameter Drop Manhole Sidewall 48 Manhole Frame & Cover 49 4" PVC Lateral w./Bedding 50 8"x4" PVC Wye 51 8"x6" PVC Wye 52 8"x8" PVC Wye 53 8"x6" PVC Eccentric Reducer UNIT UNIT COST (T AMO NED O DATE TO DATE ID $18.00 90 $ 1,620.00 SY $5.00 230 $ 1,150.00 LF $2.00 6,460 $ 12,920.00 CY $100.00 0 $ - Each $250.00 27 $ 6,750.00 Each $250.00 22 $ 5,500.00 SF $10.00 114.75 $ 1,147.50 CY $5.00 10,832.96 $ 54,164.80 CY $75.00 284.80 $ 21,360.00 Ton $4.60 20,358.08 $ 93,647.17 SY $6.00 2,687 $ 16,122.00 Ton $12.50 5,689.64 $ 71,120.50 Ton $11.20 1,680.53 $ 18,821.94 Ton $11.00 11,002.17 $ 121,023.87 Ton $16.00 0 $ - June 26, 2009 $1.657.853.10 SY $26.55 13,639.45 Ton $100.00 184.79 EA $150.00 56 SY $32.50 1,042.31 SF $2.50 802.40 SF $3.00 18,314.51 SF $3.00 109.80 SF $3.50 8,692.66 SF $7.00 0 LF $13.00 160.7 LF $20.00 66.35 Each $150.00 24 LF $8.50 6,156.6 LF $1.00 2,334 Each $1,500.00 23 Each $2,000.00 0 Each $2,500.00 2 Each $1,300.00 5 Each $1,800.00 7 LS $500.00 1 Each $2,500.00 3 LF $26.50 1,112.9 LF $34.00 217.0 LF $35.00 878.6 LF $46.00 133.4 Each $86.00 14 Each $120.00 16 LF LF Each VF VF Each LF Each Each Each Each $35.00 $25.40 $790.00 $98.00 $115.00 $262.00 $31.45 $180.00 $190.00 $200.00 $210.00 27.1 3,205.00 13 99.96 13.89 13 1,548.00 68 3 1 3 $ 362,127.50 $ 18,479.00 $ 8,400.00 $ 33,875.08 $ 2,006.00 $ 54,943.53 $ 329.40 $ 30,424.31 $ - $ 2,089.10 $ 1,327.00 $ 3,600.00 $ 52,331.10 $ 2,334.00 $ 34,500.00 $ - $ 5,000.00 $ 6,500.00 $ 12,600.00 $ 500.00 $ 7,500.00 $ 29,491.85 $ 7,378.00 $ 30,752.40 $ 6,136.40 $ 1,204.00 $ 1,920.00 $ 948.50 $ 81,407.00 $ 10,270.00 $ 9,796.08 $ 1,597.35 $ 3,406.00 $ 48,684.60 $ 12,240.00 $ 570.00 $ 200.00 $ 630.00 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of work required to complete the above improvement. APPROVED: Michael Van Millige er City of Dubu ie owa APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, ~~G ~j 7`j ~~ ~jvt.~ ~ ,'~'l 1nC.. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: I " ~ ~ C ~j/tS"~~C.l.~ ~ri ~~ BY: TITLE: 1 ~ j yC/it / ~,6+s~~ DATE: ~f. /~ (`'~Q ~ ~ 54 Locate Existing Lateral/Exploration Each $150.00 72 $ 10,800.00 WA71R MAlltl~` - , 55 4" DIP, Class 52 w.lPolywrap LF $25.50 43.5 $ 1,109.25 56 6" DIP, Class 52 w./Polywrap LF $26.00 3,489.3 $ 90,722.84 57 4" Mega Lug MJ Each $30.00 11 $ 330.00 58 6" Mega Lug MJ Each $50.00 93 $ 4,650.00 59 6" Bend MJ x MJ Each $190.00 11 $ 2,090.00 60 6"x4" Reducer Each $180.00 4 $ 720.00 61 4" Valve MJ w/Box Each $590.00 1 $ 590.00 62 6" Valve MJ w/Box Each $650.00 26 $ 16,900.00 63 6"x6"x4" Anchoring Tee MJ Each $285.00 1 $ 285.00 64 6"x6"x6" Anchoring Tee MJ Each $340.00 15 $ 5,100.00 65 4" - 441 Sleeve Each $235.00 3 $ 705.00 66 6" - 441 Sleeve Each $250.00 2 $ 500.00 67 Hydrant MJ Each $2,490.00 8 $ 19,920.00 68 Tracer Wire Access Box Each $100.00 6 $ 600.00 69 Copper Tracer Wire LF $0.15 3,552.81 $ 532.92 70 3/4" Copper Service Line TYPE K LF $21.40 646.5 $ 13,835.10 71 1" Copper Service Line TYPE K LF $35.00 27.0 $ 945.00 72 1 1/4" Copper Service Line TYPE K LF $50.00 8.00 $ 400.00 73 Water Service Lines Stop Box, Curb Stop, Tap Installation 314" Each $500.00 20 $ 10,000.00 74 3!4" Copper Service Reconnect Each $300.00 47 $ 14,100.00 75 1" Copper Service Reconnect Each $325.00 1 $ 325.00 76 1 114" Copper Service Reconnect Each $400.00 1 $ 400.00 77 Insulation Board, 2-Inch SY $10.00 7.1 $ 71.00 FBER OPTICS 78 Conduit, 4" PVC Sch 40 wlfrace Wire LF $9.50 396.1 $ 3,762.95 79 Conduit, 4" PVC Sch 40 w/Trace Wire (with 4-1" HDPE Inside) LF $11.40 3,649.6 $ 41,605.44 80 Fiber Optics Junction Vault, Precast Concrete, Depth 2' Each $2,100.00 18 $ 37,800.00 81 Fiber Optics Junction Vault, Precast Concrete, Depth 3' Each $2,200.00 1 $ 2,200.00 M19CEGLAIVEOUS 82 Sawcut, Concrete LF $3.00 679.5 $ 2,038.50 83 Sawcut, Asphalt LF $3.00 255.6 $ 766.80 84 Remove and Replace w./ New Hand Railing LF $35.00 7.0 $ 245.00 85 Sod SY $5.50 2,934 $ 16,137.00 86 Watering MGAL $47.00 81.812 $ 3,845.16 87 Tree Preservation Measures LS $500.00 1 $ 500.00 88 Dust Control Surface Treatment MGAL $20.00 0 $ - 89 Erosion Control Plan -Operating Procedures LS $1,000.00 1 $ 1,000.00 90 Traffic Control & Safety Control LS $18,750.00 1 $ 18,750.00 91 Sign Post, Removal & Installation EACH $150.00 27 $ 4,050.00 92 Wooden Fence, 48", Remove and Replace LF $15.00 0 $ - 93 Adjust Water Service Stop Box Each $125.00 36 $ 4,500.00 94 Mobilization LS $8,500.00 1 $ 8,500.00 TOTAL AMOUNT EARNED TO DATE: $ 1,652,177.94 CIIANOE ORf)ER (RUSH STREET) -EXTRA WQRK ITEMS C1 Install DIP drop manhole in lieu of PVC drop @PSMH #3 LS $1,098.25 1 $ 1,098.25 C1 Sawing of storm manholes LS $500.00 1 $ 500.00 C1 Repair water main break on 9/8!2007 LS $1,239.00 1 $ 1,239.00 C3 Re-trimming & Re-setting of Grades for Paving (1+50 - 7+00) LS $2,735.00 1 $ 2,735.00 C3 Extra for 12" PVC and Manhole Core @PSMH#10 LS $1,964.00 1 $ 1,964.00 C3 Extra for 3 Hydrant Extensions LS $1,275.00 1 $ 1,275.00 C3 Handicap Access @ the East End of St. Columbkill's School LS $9,177.45 1 $ 9,177.45 C4 Furnish & Install 16" DIP, Class 52 w./Polywrap Storm Sewer LF $63.00 29.0 $ 1,827.00 CS Repair water main break on 4/7/2008 LS $984.00 1 $ 984.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 20,799.70 TOTAL AMOUNT EARNED TO DATE: $ 1,672,977.64 TOTAL DUE CONTRACTOR: $1,672,977.64 ENGINEERING: $188,462.28 TOTAL CONSTRUCTION COST: $1,861,439.92