Garfield Avenue Retaining Wall Repair at 1695Dubuque THE CITY OF r ~T T~ ~ yAM-Am~icaC~lf ~,,,) 1 Masterpiece an the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 1695 Garfield Avenue Retaining Wall Repair Project CIP 1002087- Garfield Wall DATE: July 27, 2009 Engineer Gus Psihoyos is recommending the approval of the plans, specifications, form of contract and the estimated cost for $125,637 for the 1695 Garfield Avenue retaining Wall Repair Project. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:Iw Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque --•... DT T~ ~i AII-AmericaCiht ~J L Masterpiece an the Mississippi 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: July 27, 2009 SUBJECT: 1695 Garfield Avenue Retaining Wall Repair Project CIP 1002087 -Garfield Wall INTRODUCTION The enclosed resolution is in reference to the public hearing for the 1695 Garfield Avenue Retaining Wall Repair Project. DISCUSSION On October 20, 2008, the City Council authorized (Resolution 371-08) emergency repairs to the retaining wall at 1695 Garfield Avenue. This retaining wall, adjacent to the Hamilton Street side of the property, is in a deteriorated condition with observed rotational movement and stability concerns. The sidewalk and parking lane along. Hamilton Street have been barricaded to protect property and to maintain public safety. In 2002, the property owner of 1695 Garfield questioned the ownership and maintenance of the retaining wall and provided documentation to the City that the wall was originally constructed in the 1940s as part of a WPA project. It was the City's contention that a WPA project on its own does not provide sufficient evidence that the City has ownership responsibility of said wall. In an attempt to resolve the wall ownership dispute in a mutually beneficial manner, an agreement was executed in 2002 between the City of Dubuque and the Albert J. Reisch Estate that the City would perform cone-time partial wall repair. The 1695 Garfield Avenue Retaining Wall Repair Project will include the reconstruction of a 10-foot high limestone retaining wall. This project will utilize the salvaged stone from the existing wall and will include new geofoam backfill and clean stone, a construction method used on the Grove Terrace Retaining Wall Project. All turf areas and sidewalk disturbed by the project will be restored. The existing roof drains of the home will be tied into the foundation drain of the wall. IIW Engineers & Surveyors, PC has developed the plans and specifications for this work and will provide assistance during the bid-letting and construction phases of the project. RECOMMENDATION I recommend approval of the plans, specifications, form of contract and the estimated cost for the 1695 Garfield Avenue Retaining Wall Repair Project. BUDGET IMPACT The estimate of probable cost for the 1695 Garfield Avenue Retaining Wall Repair Project is as follows: Estimate Construction Contract $ 95,000.00 Contingency (15%) 14,250.00 Construction Engineering & Inspection (15%) 16,387.00 Total Project Cost $125,637.00 The funding for the 1695 Garfield Avenue Retaining Wall Repair Project will be as follows: CIP No. Fund Description Fund Amount 1002087 Garfield Wall $125,637.00 Total Project Funding $125,637.00 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution approving the plans, specifications, form of contract and the estimated cost for the 1695 Garfield Avenue Retaining Wall Repair Project. cc: Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Rich Russell, Building Services Manager RESOSLUTION NO. 277-09 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE 1695 GARFIELD AVENUE RETAINING WALL REPAIR PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the 1695 Garfield Avenue Retaining Wall Repair Project, in the total estimated amount $125,637, are hereby approved. Passed, adopted and approved this 3rd day of August , 2009. ~~~ Roy D. Buol, Mayor Attest: ^^. eanne F. Schneider, CMC, City Clerk