Loading...
Historic Shot Tower Rehabilitation Project Phase ITHE CITY OF Dubuque ~'~ "~'~ ~ AH-AmedcaCitft ~J I I Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Historic Shot Tower Rehabilitation Project -Phase I CIP's 1001854 & 7001854 DATE: July 27, 2009 City Engineer Gus Psihoyos is recommending the adoption of the resolution approving the plans, specifications, form of contract and the estimated cost of $769,670 for the Historic Shot Tower Rehabilitation Project -Phase I concur with the recommendation and respectfully request Mayor and City Council approval. Mi hael C. Van Milligen MCVM:Iw Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque -. DLTB E "~'"'~~a~'" 1 ~ Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer , _ _ --> DATE: July 27, 2009 SUBJECT: Historic Shot Tower Rehabilitation Project -Phase I CIPs 1001854 & 7001854 INTRODUCTION The enclosed resolution is in reference to the public hearing for the Historic Shot Tower Rehabilitation Project -Phase 1. DISCUSSION The City has committed $320,000 for the rehabilitation and interpretation of the Shot Tower as part of the America's River project at the Port of Dubuque. The City commitment has been used to leverage a $295,000 Save America's Treasures grant from the National Park Service (NPS) and a $100,000 Historic Sites Preservation Grant from the State Historical Society of Iowa (SHSI) for the stabilization and rehabilitation of the Shot Tower. Constructed in 1856 to manufacture lead shot ammunition, the Shot Tower is one of only a few remaining shot towers in the United States, and the only one west of the Mississippi River. As a unique structure of national significance (National Register of Historic Places), it has been recommended that the City stabilize and rehabilitate the Shot Tower. The Historic Shot Tower Rehabilitation Project will be handled as a two-phase project: Phase I -stabilization and rehabilitation; and Phase II -observation deck enclosure and interpretation of the tower. Phase I is designed to meet all of the City's grant requirements and involves the: repair and restoration of the interior and exterior limestone and brick masonry surfaces; the removal and replacement of the existing concrete cap with a new concrete cap and roof hatch; installation of afull-height, spiral, concrete-filled steel pan interior stair and handrails; and the installation of new wood window, louver, and door construction. The architectural firm of Hasbrouck Peterson Zimoch Sirirattumrong (Chicago, Illinois) has developed the construction documents for this work and will provide assistance during the bid-letting and construction phases of the project. The Phase II project will be deferred until such future date when additional funding can be secured to develop the roof top observation deck enclosure. RECOMMENDATION I recommend approval of the plans, specifications, form of contract and the estimated cost for the Historic Shot Tower Rehabilitation Project -Phase I. BUDGET IMPACT The estimate of probable cost for the Historic Shot Tower Rehabilitation Project -Phase I is as follows: Proiect Cost Estimate Construction Contract $627,300 Consultant Fees (Architectural & Engineering) $ 57,400 Grant Administrative Fees $ 15,000 Contingency (10%) $ 69,970 Total Project Cost 7 7 The funding for the Historic Shot Tower Rehabilitation Project - Phase I will ~be as follows: CIP No. Fund Description Fund Amount 7001854 Save America's Treasures Grant $295,000 1001854 Historic Sites Preservation Grant $100,000 1001854 Historic District Public Improvement Project $100,000 7001854 General Fund $259,670 1001854 General Fund $ 15,000 Total Project Funding $~ ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution approving the plans, specifications, form of contract and the estimated cost for the Historic Shot Tower Rehabilitation Project -Phase I. Prepared by Robert Schiesl, Assistant City Engineer cc: Jenny Larson, Budget Director Laura Carstens, Planning Services Manager Dave Johnson, Planning Services RESTOLUTION NO. 278-09 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE HISTORIC SHOT TOWER REHABILITAITON PROJECT - PHASE I NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Historic Shot Tower Rehabilitation Project -Phase I, in the estimated amount $769,670, are hereby approved. Passed, adopted and approved this 3rd day of August , ?009. ~~ zoy D. Buol, Mayor Attest: ..~~' eanne F. Schneider, CMC, City Clerk