Loading...
2008 Drain Tile Project_Melrose, Mineral, DeborahTHE CITY OF ~,,.. Dubuque DuB E IVlasterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2008 Drain Tile Project (Melrose Terrace, Mineral Street, and Deborah Drive) (CIP 7201354) DATE: September 1, 2009 City Engineer Gus Psihoyos is recommending acceptance of the 2008 Drain Tile Project (Melrose Terrace, Mineral Street and Deborah Drive), as completed by McDermott Excavating, in the final contract amounts of $29,390.88 for Melrose Terrace (7.9% over the contract price), $23,746.70 for Mineral Street (13.8% under the contract price) and $7,277.11 for Deborah Drive (2.8% under the contract price). I concur with the recommendation and respectfully request Mayor and City Council approval. Mich el C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF I~LJB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, FROM: DATE: City Manage Gus Psihoyos, City Engineer - August 31, 2009 SUBJECT: 2008 Drain Tile Project (Melrose Terrace, Mineral Street, and Deborah Drive) (CIP 7201354) INTRODUCTION The purpose of this memo is to recommend acceptance of the public improvements and authorize payment to the contractor for the 2008 Drain Tile Project (Melrose Terrace, Mineral Street, and Deborah Drive). BACKGROUND Many Dubuque property owners have installed sump-pumps and/or drain tiles to prevent groundwater from damaging basements and their contents. And in many cases, sump pump and drain the discharge is directed into the street. While the curb and gutter section of a street is specifically designed to carry stormwater, the constant flow of sump pump or drain the discharge can create algae build-up in the summer and ice in the winter. Both of these conditions can prove hazardous. Funding for an annual program was established with the FY2009-FY2013 Five Year Capital Improvement Program Budget to install drain to collect sump pump and drain the discharge and direct it to a storm sewer. The 2008 Drain Tile Project consisted of three projects: Melrose Terrace, Mineral Street, and Deborah Drive. Three sealed bids were taken for Melrose Terrace with McDermott Excavating submitting the lowest bid in the amount of $27,249.05, which was 0.5% above the engineer's estimate. 2. Three bids were taken for Mineral Street with McDermott Excavating submitting the lowest bid in the amount of $27,558.40, which was 6.9% above the engineer's estimate. 3. A short form contract was negotiated and executed with McDermott Excavating in the amount of $7,487.65 for the Deborah Drive site. DISCUSSION The 2008 Drain Tile Project (Melrose Terrace, Mineral Street, and Deborah Drive) was completed by McDermott Excavating of Dubuque, Iowa. The final contract amounts are as follows: • Melrose Terrace, in the amount of $29,390.88 (7.9% over the contract price); • Mineral Street, in the amount of $23,746.70 (13.8% under the contract price); and • Deborah Drive, in the amount of $7,277.11 (2.8% under the contract price). RECOMMENDATION I recommend that the City Council accept the improvements and authorize payment of the contract amounts of $29,390.88; $23,746.70; and $7,277.11 to McDermott Excavating for the 2008 Drain Tile Project (Melrose Terrace, Mineral Street, and Deborah Drive). BUDGET IMPACT Funding for the improvements is provided by the annual Drain Tile Extension Program (CP 7201354). ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolutions accepting the improvements and authorizing payment of the contract amounts of $29,390.88; $23,746.70, and $7,277.11 to McDermott Excavating for the 2008 Drain Tile Project (Melrose Terrace, Mineral Street, and Deborah Drive). Prepared by Deron Muehring, Civil Engineer II cc: Jenny Larson, Budget Director Deron Muehring, Civil Engineer II RESOLUTION NO. 303-09 ACCEPTING THE 2008 DRAIN TILE PROJECT (MELROSE TERRACE) AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRCTOR Whereas, the Public Improvement Contract for the 2008 Drain Tile Project (Melrose Terrace) (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Drain Tile Extension Program appropriation for the contract amount of $29,390.88 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this stn day of September , 2009. ~~ Roy D. Buol, Mayor ~. Atte t-: /" .~ , -- eanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2008 DRAIN TILE PROJECT (MELROSE TERRACE) The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2008 Drain Tile Project (Melrose Terrace), that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $29,390.88. Dated this day of , 2009. City Engineer Filed in the office of the City Clerk on the day of , 2009. Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 304-09 ACCEPTING THE 2008 DRAIN TILE PROJECT (MINERAL STREET) AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 2008 Drain Tile Project (Mineral Street) (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Drain Tile Extension Program appropriation for the contract amount of $23,746.70 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 8th day of Att st: .~~ ~ ~ ~ Jeanne F. Schneider, CMC, City Clerk September 2009. ~' '~~ ~ ~ f'~ Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2008 DRAIN TILE PROJECT (MINERAL STREET) The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2008 Drain Tile Project (Mineral Street), that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $23,746.70. Dated this day of , 2009. ,~ I !~ ; ~ . ~ ,. ; r _ , City Engineer Filed in the office of the City Clerk on the day of , 2009. Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 305-09 ACCEPTING THE 2008 DRAIN TILE PROJECT (DEBORAH DRIVE) AND AUTHORIZING THE PAYMENT OF THE CONRACT AMOUNT TO THE CONTRACTOR whereas, the Public Improvement Contract for the 2008 Drain Tile Project (Deborah Drive) (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Drain Tile Extension Program appropriation for the contract amount of $7,277.11 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this sth day of September 2009. G~ Roy D. Buol, Mayor Atte t: - , ~, r .~, °' " anne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2008 DRAIN TILE PROJECT (DEBORAH DRIVE) The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2008 Drain Tile Project (Deborah Drive), that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $7,277.11. Dated this day of , 2009. City Engineer Filed in the office of the City Clerk on the day of , 2009. Jeanne F. Schneider, CMC, City Clerk PROJECT CLOSE OUT FORM THE CITY OF DuB E Masterpiece on the Mississippi City of Dubuque Engineering 50. W 13th Street Dubuque,lA 52001 (563)589-4270 PfOJ/1Ct NamB: MINERAL STREET GRAIN TILE PROJECT CIP Number: 7201354 Protect Contract Amount: $z7,ssb.ao Protect Co etion Date: 28-Nov-oe Contractor Name: McDermott 6rcavatin Contractor Address: 14ao7 Rome 20 City, STat@, Zip: Dubu ue, Iowa 52003 Contractor Tele hone: 583-5a3-ae33 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 1 15' RCP, Class III 23 LF $ 36.38 28.00 $ 897.88 113.04% 2 8" Pertorated Drain Tile w/Chi 485 LF S 7.15 513.00 $ 3,887.95 110.32% 3 Intake, 101-B 2 Ea $ 1,850.00 2.00 $ 3,300.00 100.00% 4 Beddin Stone, 1" Clean 10 Ton $ 13.40 19.92 $ 288.93 199.20% 5 Limestone Backfill 25 Ton $ 5.50 45.20 $ 248.80 180.80% 8 Base Stone 20 Ton $ 12.80 103.44 $ 1,303.34 517.20% 7 8' PCC Sidewalk / Odvewa , Indutlin Removal 45 SY $ 57.00 72.78 $ 4,148.48 161.73% 8 4" PC Sidewalk 48 SF $ 4.92 51.00 $ 250.92 108.25% 9 Ta Into Existin Storm Main 2 Ea $ 175.00 2.00 $ 350.00 100.00% 10 PC Curb 8 Gutter, Remove 8 Re lace 500 LF $ 15.85 $ 0.00% 11 HMA Pavement Remove & Re lace 50 Ton $ 127.00 48.16 $ 8,118.32 98.32% 12 Landsca Restoration 75 SY $ 4.95 81.00 $ 400.95 108.00% 13 Traffic Control And Pro'ed Safet 1 LS $ 1,730.00 1.00 E 1,730.00 100.00% A GE ORDER 1 Removal of 8" PCC Approach, (HOUrty Charge for Excavator, tlump truck, mini excavator) 1.00 $ 212.50 2 M-4 Concrete cost difference - 44 CY at $13 1.00 S 195.00 Pa meM Totals E 23,188.85 Total CoMrad Wark Performed to Date: $ 22,781.35 Total Change Order Work Pertormetl to Date: $ 407.50 Total Contrail and Change Order Work Pertomred to Date: S 23,188.8b Miscellaneous Costs $ En ineedn $ 557.85 TOTAL FINAL PROJECT COSTS: E 23,746.70 I hereby certify that the above statement shows, in tlelail, the cored amount of all work requiretl to complete the above improvement. APPROVED: Michael Van Milligyn, Cat' y'I anager Dubuque, loy,~a ' ~' .~ Gus Psihoyos, Cay Engineer Dubuque, Iowa The Untlersipnetl C ~ conlredor for the above improvement, does hereby accept the above "Total Contredor', as full settlement for all claims for said improvement. APPROVED: BY: PROJECT CLOSE OUT FORM THE CITY OF DuB E Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563) 5894270 Project Name: MINERAL STREET DRAIN TILE PROJECT CIP Number: 72D735a Project Contract Amount: $z7,sss.ao Pro act Co etion Date: 28-Nov-oa COntraCtOf Name: McDermott Exravalin Contractor Address: 14407 Route 20 Clty, State, Zip: Dubu ue, Iowa 52003 Contractor Tale hone: s63-5$3-4a33 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL OUANTITY TOTAL PERCENT COMPLETE 1 15' RCP, Class III 23 LF $ 38.38 28.00 $ 997.88 113.04% 2 8" Perforated Drain Tile w/Chi 485 LF $ 7.15 513.00 $ 3,887.95 110.32% 3 Intake, 101-B 2 Ea $ 1,850.00 2.00 $ 3,300.00 100.00% 4 Beddin Stone, 1" Clean 10 Ton $ 13.40 19.92 $ 288.93 199.20% 5 Limestone Backfill 25 Ton $ 5.50 45.20 $ 248.80 180.80% 8 Base Stone 20 Ton $ 12.80 103.44 $ 1,303.34 517.20% 7 8" PCC Sidewalk / Ddvewa , Inclutli Removal 45 SY $ 57.00 72.78 $ 4,148.48 161.73% 8 4" PC Sidewalk 48 SF $ 4.92 51.00 $ 250.82 106.25% 9 Ta IMO Exisli Storm Mein 2 Ea $ 175.00 2.00 $ 350.00 100 00% 10 PC Curb & Gutter, Remove & Re lace 500 LF $ 15.85 $ . 0.00% 11 HMA Pavement Remove d Re lace 50 Ton $ 127.00 48.18 $ 6,118.32 98.32% 12 Landsca a Restoration 75 SY $ 4.95 81.00 $ 400.95 108 00% 13 Traffic Control Antl Pro act Safer 1 LS $ 1,730.00 1.00 $ 1,730.00 . 100.00 CH G ORDER 1 Removal of 8' PCC Approach, (Howdy Charge for Excavator, dump truck, mini excavator) 1.00 $ 212.50 2 M-4 Concrete wst difference - 44 CY at $13 1.00 $ 195.00 Pa mant Totals $ 23,188.85 Total CoMrect Work Pertortned to Date: $ 22,781.35 Total Change Order Work Pertormetl to Date: $ 407.50 Total Contract and Change Ordar Work Performed to Data: S 23,188.88 Miscellaneous Costs $ E ineedn $ 557.85 TOTAL FINAL PROJECT COSTS: 5 23,746.70 I hereby certify that the above statement shows, in detail, [he cored amount of all work required to complete the above improvement. APPROVED: Michael Van Milligan, CayMHM1HgeC Duhuque, Lpwa /11 \I (~ - ~~,~1 ~ r' Gus Psihoyos, Cay Engineer Dubuque, Iowa The Undersi9n~ oMmctor for the above improvement, does hereby accept the above "Total Due ontredor", as full settlement for all claims for saitl improvement. APPROVED: Txe c1TV of DUB JE Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563)589-0270 PROJECT CLOSE OUT FORM Project Name: MELROSE TERRACE DRAIN TILE PROJECT CIP Number: 7201354 Project Contract Amount: E27,2as.o5 Project Com lotion Date: 26-Nov-0B Contractor Name: McDemwtt Exwvatin Contractor Address: 14407 Rcute 20 City, State, Zip: Dubu ue, Iowa 52003 Contractor Tele hone: 563-583633 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM pUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 1 15" RCP, Class III 262 LF $ 29.78 220.00 $ 6 551 60 83 97% 2 101-8 Intake 1 Ea $ 7,850.00 , . 2.00 $ 3 300.00 . 200 00% 3 Ta Exisitn Catch Basin 1 Ea $ 250.00 , 1.00 $ 250.00 . 100 00% 4 6" Perforated Drain Tile wfChi s 445 LF $ 7.15 475.00 $ 3 396 25 . 106 74 5 Beddin Stone, t"Clean 60 Tons $ 13.40 , . 25.00 $ 335.00 . 41 67% 6 Limestone Backfill 165 Tons $ 5.50 73.19 $ 402 55 . 39 56% 7 Base Stone 120 Tons $ 12.60 . 100.00 $ 1 260.00 . 63 33% 8 PCC Curb 8 Gutter, Includin Removal 275 LF $ 16.20 , 265.00 $ 4 293.00 . 96 36 % 9 4"PCC Sidewalk, Includin Removal 32 SF $ 4.92 , 244.51 $ 1 202.99 . 764 09% 10 6" PCC Sidewalk! Odvewa ,Includin Removal 12 SY $ 57.00 , 58.73 S 3 233.61 . 472 75% 11 Landsw Restoration 1 LS $ 525.00 , 1.00 $ 525 00 . 100 00% 12 Traffic Control And Pro"ect Safe 1 LS E 1,400.00 . 1.00 $ 1 400 00 . 100 00% 13 HMA Pavement Remove 8 Re ace 30 Tons $ 127.00 , . 20.00 $ 2 540 00 . 66 67% , . . Pa nt Totals $ 28,689.99 Total Contract Work Performed to Date: $ 2g,ggg.gg Total Change Order Work Perforted to Date: Total Contract and Change Order Work PsAormed to Date: $ 28,689.99 Miscellaneous Costs $ En ineedn $ 700.89 TOTAL FINAL PROJECT COSTS: S 29,390.88 I hereby certify that the above statement shows, in detail, the correct arwunt of all work required to complete the above improvement. APPROVED: Michael Van Milligan, Cily M Dubuque, Iowa. I Gus Psihoyos, City Engineer Dubuque, IOwa The Undersigned, Ia{"~J~/'~/( ~r~nkactor for the above impovemenl, does hereby accept the above "Total Due Contractof', as full settlement for all claims for said improvement. APPROVED: er: THE CITY OF DUB E Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563)589j1270 PROJECT CLOSE OUT FORM Project Name: MELROSE TERRACE DRAIN TILE PROJECT CIP Number: 7201354 Project Contract Amount: $27,249.05 Pro'ect Com lotion Date: 26-Nov-08 Contractor Name: McDermott Excevadn Contractor Address: 14407 Route 20 City, State, Zip: Dubu ue, Iowa 52003 Contractor TBIa hODa: 563-583-4633 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 1 15" RCP, Class III 262 LF $ 29.78 220.00 $ 6 551 60 83 97 2 101-B Intake 1 Ea $ 1,650.00 , . 2 00 $ 3 300 00 . 200 00% 3 Ta Exisitn Catch Basin 1 Ea $ 250.00 . , . 1.00 $ 250 00 . 100 00 % 4 6" Perforeted Drain Tile WChi s 445 LF $ 7.15 . 475.00 $ 3 396 25 . 106 74% 5 Beddin Stone, l"Clean 60 Tons $ 13.40 , . 25.00 $ 335 00 . 41 67% 6 Limestone Backfill 165 Tons $ 5.50 . 73.19 $ 402 55 . 39 56% 7 Base Stone 120 Tons $ 12.60 . 100.00 S 1 260 00 . 83 33% B PCC Curb & Gutter, Includin Removal 275 LF $ 16.20 , . 265 00 $ 4 293 00 . 96 36% 9 4" PCC Sidewalk, Includin Removal 32 SF $ 4.92 . , . 244.51 $ 1 202 99 . 764 09% 10 6" PCC Sidewalk / Ddvewa ,Includin Removal 12 SY $ 57.00 , . 56.73 $ 3 233 61 . 472 75 11 Landsce Restoration 1 LS E 525.00 , . 1.00 $ 525 00 . 100 00% 12 Traffic Control And Pro ect Safe 1 LS $ 1,400.00 . 1.00 $ 1 400 00 . 100 00 13 HMA Pavement Remove & Re lace 30 Tons $ 127.00 , . 20.00 $ 2 540 00 . 66 67 , . . Pa meat Totals E 28,689.99 Total Contract Work Pertortned to Date: $ 28,689.99 Total Change Order Work Pertormed to Date: Total Contact and Change Order Work Performed to Date: S 26,689.99 Miscellaneous Costs g En ineerin $ 700.89 TOTAL FINAL PROJECT COSTS: E 29,390.88 I hereby certify that the above statement shows, in detail, the cort'eU amount of all work required to complete the above improvement. APPROVED: Michael Van Milligan, C,i~yNfaneger Dubuque, IoCwa~-, ~ 1 ~~ i~~~ . ~ n ~/l~ UA 4 Gus Psihoyos, City Engineer Dubuque, lore The Undersigned,~•• ~Y~r(~I/7;ntractor for the above improvement, does hereby accept the above "Total Due ContreUOr', as full settlement for all Uaims for said improvement. APPROVED: BY: THE CTTY OF DUB E `~,~ City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563) 589-4270 PROJECT CLOSE OUT FORM Project Name: DEBORAH DR. DRAIN TILE PROJECT CIP Number: 7201354 Project Contract Amount: $7,x87.65 Pro ect Com letion Date: 26-Nov-o8 Contractor Name: Mcoem,ott Excavatin Contractor Address: 14407 Route 20 City, State, Zip: Dubu ue, Iowa 52003 Contractor Tele hone: 563-583-4633 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 1 6" Drain file w/chi sand fabric 155 LF $ 8.38 152.00 $ 1 273.76 98 06 2 Bedding Stone, 1" Clean 5 Ton $ 25.00 13.40 $ , 335 00 . 268 00 3 Backfill, Limestone 17 Ton $ 6.00 17.00 $ . 102.00 . 100 00°~ 4 Graded Stone Base 4 Ton $ 25.00 5.00 $ 125 00 . 125 00 % 5 6" PCC Sidewalk l Driveway, Including Removal 24 SY $ 57.00 18.40 $ . 1 048 80 . 76 67 6 Tap Exisitng Catch Basin 1 EA $ 250.00 1.00 $ , . 250 00 . 100 00 7 Intake, 101-B 1 EA $ 1,650.00 1.00 $ . 1 650 00 . 100 00% 8 15" RCP, Class III 6 LF $ 32.50 7.00 $ , . 227 50 . 116 67 9 48" Manhole Base 1 EA $ 450.00 $ . . p 00 % 10 48" Diameter Sidewakl 3 VF $ 100.00 $ 0 00 11 Manhole Frame 8 Cover 1 EA $ 600.00 $ . 0 00°~ 12 HMA Pavement Remove 8 Replace 2 Ton $ 150.00 4.00 $ 600 00 . 200 00 % 13 Landscape Restoration 25 SY $ 4.95 32.00 $ 158 40 . 128 00 % 14 Traffic Control And Project Safety 1 LS $ 625.00 1.00 $ . 625.00 . 100.00 % Totals $ 6,395.46 CHANGE ORDER 1 4" PCC Sidewalk, Including Removal 1 LS $ 303 00 1 00 $ 303 00 2 PCC Curb 8 Gutter, Including Removal 1 LS $ . 204.00 . 1 00 $ . 204 00 3 PCC Curb, Including Removal 1 LS $ 15.00 1.00 $ . 15 00 4 Water Box Repair (WB top 8 lid) 1 LS $ 115.00 1 00 $ . 115 00 5 (2) 4 x 8 sheets of 2" insulation between catch basin 8 water m 1 LS $ 73.00 . 1.00 $ . 73.00 Chan a Order Totals $ 710.00 Total Contract Work Performed to Date: $ 6,395.46 Total Change Order Work Perfonned to Date: $ 710.00 Total Contract and Change Order Work Performed to Date: S 7,105.46 Miscellaneous Costs $ _ En ineerin $ 171 65 TOTAL FINAL PROJECT COSTS: S 7,277.11 I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. The Undersigned,~~~1~~/`/~gcontractor for the above improvement, does hereby accept the above'Total DuDu Contractor", as full settlement for all claims for said improvement. APPROVED: Michael Van Milligen an er Dubuque,lowa -~ IJI'I Gus Psihoyos, City Engineer Dubuque, Iowa APPROVED: ~~.,~_ THE CITY OF Dus '~ej E c~~'A~ `1hf / City of Dubuque Engineering 50. W. 13th Street Dubuque,lA 52001 (563) 589-4270 PROJECT CLOSE OUT FORM Project Name: DEBORAH DR. DRAIN TILE PROJECT CIP Number: 72o135a Project Contract Amount: $7,487.x5 Project Com letion Date: 26-Nov-oa COntraCtOr Name: McDermott Excavatin Contractor Address: 14407 Route 20 City, State, Zip: Dubu ue, Iowa 52003 Contractor Tele hone: 563-583-4633 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 1 6" Drain file w/ chips and fabric 155 LF $ 6.38 152 00 $ 1 273 76 98 06 % 2 Bedding Stone, 1" Clean 5 Ton $ 25.00 . 13 40 $ , . 335 00 . 268 00% 3 Backfill, Limestone 17 Ton $ 6.00 . 17 00 $ . 102 00 . 100 00% 4 Graded Stone Base 4 Ton $ 25.00 . 5 00 $ . 125 00 . 125 00 5 6" PCC Sidewalk /Driveway, Including Removal 24 SY $ 57.00 . 18 40 $ . 1 048 80 . 76 67°~ 6 Tap Exisitng Catch Basin 1 EA $ 250.00 . 100 $ , . 250 00 . 100 00 % 7 Intake, 101-8 1 EA $ 1 650.00 1 00 $ . 1 650 00 . 100 00% 8 15" RCP, Class III 6 LF $ , 32.50 . 7 00 $ , . 227 50 . 116 67°~ 9 48" Manhole Base 1 EA $ 450.00 . $ . . 0 00 % 10 48" Diameter Sidewal 3 VF $ 100.00 $ - . 0 00% 11 Manhole Frame & Cover 1 EA $ 600.00 $ . 0 00 12 HMA Pavement Remove & Replace 2 Ton $ 150.00 4 00 $ 600 00 . 200 00 % 13 Landscape Restoration 25 SY $ 4.95 . 32 00 $ . 158 40 . 128 00 % 14 Traffic Control And Project Safety 1 LS $ 625.00 . 1.00 $ . 625.00 . 100.00 Totals $ 6,395.46 CHANGE ORDER 1 4" PCC Sidewalk, Including Removal 1 LS $ 303.00 1.00 $ 303.00 2 PCC Curb & Gutter, Including Removal 1 LS $ 204.00 1 00 $ 204 00 3 PCC Curb, Includin Removal 1 LS $ 15.00 . 1 00 $ . 15 00 4 Water Box Repair (WB top & lid) 1 LS $ 115.00 . 1 00 $ . 115 00 5 (2) 4 x B sheets of 2" insulation between catch basin & water m 1 LS $ 73.00 . 100 $ . 73.00 Chan a Order Totals $ 710.00 Total Contract Work Performed to Date: $ 6,395.46 Total Change Order Work Performed to Date: $ 710.00 Total Contract and Change Order Work Performed to Date: $ 7,105.46 Miscellaneous Costs $ En ineerin $ _ 171 65 TOTAL FINAL PROJECT COSTS: S 7,277.11 I hereby certify that the above statement shows, in detail, the cored amount of all work required to complete the above improvement. APPROVED: Michael Van Milligan, City Manager--\ Dubuque, Iowa r 1 / ~. /'~' ~ i / '~/~ ~-' v V ° '~11 Gus Psihoyos, City Engineer Dubuque,lowa The Undersigned~~~K contractor for the above improvement, does hereby accept then hereby accept the above "Tota~ Contractor", as full settlement for all claims for said improvement. APPROVED: ,~~?~ r