St. Mary's Street Retaining Wall Reconstruction AcceptanceTHE CITY OF Dubuque '"~ - DUB E AN-Ame~icaCity ~ r Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: St. Mary's Street Retaining Wall Reconstruction Project (CIP 3502090) DATE: September 1, 2009 City Engineer Gus Psihoyos is recommending acceptance of the St. Mary's Street Retaining Wall Reconstruction Project, as completed by Tschiggfrie Excavating Co., in the final contract amount of $271,428.59. I concur with the recommendation and respectfully request Mayor and City Council approval. Mi hael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CTTY OF DLTB- E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Mana er FROM: Gus Psihoyos, City Engineer ~~ DATE: August 31, 2009 SUBJECT: St. Mary's Street Retaining Wall Reconstruction Project (CIP 3502090) INTRODUCTION Dubuque ~~~~ 1 2007 The enclosed resolution provides for the acceptance of the construction contract for the St. Mary's Street Retaining Wall Reconstruction Project. BACKGROUND On October 13, 2008, the City Council authorized (Resolution 358-08) emergency repairs to the retaining wall and associated street improvements at St. Mary's Street. The project provided for the: reconstruction of the limestone retaining wall; a vehicle barrier rail along the top of the retaining wall; and street reconstruction with 7-inch concrete pavement. The project was awarded based on a competitive quotation process for public improvements in accordance with Iowa Code, Section 26.14. Sealed bids were received on the project. Of the two bids received, Tschiggfrie Excavating Co. of Dubuque, Iowa, submitted the low bid in the amount of $283,861.00. This amount was 7.8% above the engineer's estimate of $263,254.00. DISCUSSION The St. Mary's Street Tschiggfrie Excavating $271,428.59. Construction Contract Contingency Construction Engineering Retaining Wall Reconstruction Project was completed by Co. of Dubuque, Iowa, in the final contract amount of Award Final $283,861.00 $271,428.59 28,386.10 0 ~ & Inspection 46,837.07 27,230.33 Total Project Cost RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $271,428.59 to Tschiggfrie Excavating Co. for the St. Mary's Street Retaining Wall Reconstruction Project. BUDGET IMPACT The project funding summary is as follows: CIP No. Fund Descriation Fund Amount 3502090 St. Mary's Wall $298,658.92 Total Project Funding $298.658.92 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $271,428.59 to Tschiggfrie Excavating Co. for the St. Mary's Street Retaining Wall Reconstruction Project. Prepared by Jon Dienst, PE cc: Barry Lindahl, City Attorney Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer Jon Dienst, PE RESOLUTION NO. 306-09 ACCEPTING THE ST. MARY'S STREET RETAINING WALL RECONSTRUCTION PROJECT AND AUTHROIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the St. Mary's Street Retaining Wall Reconstruction Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the St. Mary's Wall Capital Improvement Project appropriation for the contract amount of $271,428.59 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this gtb day of September //~ ~~.~- °. D. Buol, Mayor Atte t: ~ ,, anne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE ST. MARY'S STREET RETAINING WALL RECONSTRUCTION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the St. Mary's Street Retaining Wall Reconstruction Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $298,658.92. Dated this 28TH day of August, 2009. Gus Psihoyos City Engineer Filed in the office of the City Clerk on the28th day of August, 2009 nne F. Schneider, CMC, City Clerk City of Dubuque -Engineering Division Council Final Payment Form PARTIAL PAYMENT NO: COUNCIL FINAL DATE: August 26, 2009 PROJECT NAME: ST. MARY'S STREET RETAINING WALL RECONSTRUCTION PROJECT CONTRACTOR: TSCHIGGFRIE EXCAVATING, INC. CONTRACT AMOUNT: $283,861.00 ( AMO NED BID ITEM DESCRIPTION UNIT T UN T COST O DATE O DATE DEMOLITION 8 REMOVAL 1 Structure Removal LS $ 4,950.00 1.00 $ 4,950.00 2 Excavation (Unclassfied) CY $ 26.00 586.00 $ 15,236.00 STONE 8 PAVEMENT 3 PC Concrete Pavement, (7") wllntegral Curb, Class "C" SY $ 61.00 309.52 $ 18,880.72 4 Graded Stone Base, 3/4" TONS $ 15.00 240.76 $ 3,611.40 5 HMA 300k Surtace Course, 1/2" (PG 64-22) TONS $ 155.00 11.16 $ 1,729.80 6 Concrete Filler CY $ 132.00 3.50 $ 462.00 7 Bedding Stone TONS $ 16.00 57.74 $ 923.84 RETAINING WALL ITEMS 8 Limestone (Salvaged) 9 Limestone (New) 10 Structural Concrete 11 Engineered Fill 12 Satisfactory Soil 13 Geofoam Fill 14 4" Perforated CPE Drain Tile 15 Wrought Iron Hoop Railing 16 Cable Barrier SF $ 28.00 736.19 $ 20,613.32 SF $ 60.00 888.46 $ 53,307.60 CY $ 415.00 205.50 $ 85,282.50 TONS $ 22.00 212.68 $ 4,678.96 CY $ 23.00 94.00 $ 2,162.00 CY $ 89.00 161.73 $ 14,393.97 LF $ 20.00 116.30 $ 2,326.00 LF $ 106.00 121.80 $ 12,910.80 LF $ 17.00 $ - MISCELLANEOUS 17 Sawcut Pavement -Regardless of Type LF $ 6.00 60.00 $ 360.00 18 Backfill, Topsoil CY $ 46.00 54.00 $ 2,484.00 19 Erosion Control Plan -Operating Procedures LS $ 72.00 1.00 $ 72.00 20 Traffic Control and Safety Control LS $ 1,650.00 1.00 $ 1,650.00 21 Mobilization & Miscellaneous LS $ 17,765.00 1.00 $ 17,765.00 ALTERNATE 1 22 ADD -Temporary Pavement -Remove & Replace Tons $ 141.00 25.29 $ 3,565.89 TOTAL AMOUNT EARNED TO DATE: $ 283,799.91 CHANGE ORDER -EXTRA WORK ITEMS C1 Geofoam Blocks from Portzen -Deduct CY ($44.67) 79.40 $ (3,sas.eo) C2 Additional Geofoam Blocks-Stored at Garage CY $44.67 52.14 $ 2,329.09 C3 Temporary Barrier Rail LS $720.00 1.00 $ 7zo.oo C4 4" PCC Sidewalk SF $4.35 445.70 $ 1,s3a.eo C5 6" PCC Sidewalk (Ped Access Ramp) SF $5.75 339.18 $ 1,sso.2s C6 Pedestrian Tile (ADA Tile) SF $31.00 6.00 $ 16s.oo C7 SeedlFertilize & Mulch LS $2,071.30 1.00 $ 2,071.30 C8 6' High Chain Link Fence LS $770.00 1.00 $ 770.00 C9 Remove Barrier Rail LS $1,210.00 1.00 $ 1,210.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 7,628.68 TOTAL AMOUNT EARNED TO DATE: $ 271,428.59 TOTAL DUE CONTRACTOR: $ 271,428.59 ENGINEERING: $ 27,230.33 TOTAL CONSTRUCTION COST: $ 298,658.92 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milli anager City of Dubuq ,Iowa ., APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR The undersigned, Tschiggfrie Excavating, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. .~~ .- CONTRACTOR: Gv~ ~ r^ ~. ~?~C :1' ~ r CO BY: TITLE: lSx :t.t° ~-~ I ~n7 /~~ DATE: ~ ~ J ~ ~ ~ / City of Dubuque -Engineering Division Council Final Payment Form PARTIAL PAYMENT NO: COUNCIL FINAL PROJECT NAME: ST. MARY'S STREET RETAINING WALL RECONSTRUCTION PROJECT DATE: August 26, 2009 CONTRACTOR: TSCHIGGFRIE EXCAVATING, INC. CONTRACT AMOUNT: $283,861.00 BID ITEM DESCRIPTION UNIT UNIIT OST (TO DATE AMO O DATENED DEMOLITION 8 REMOVAL 1 Structure Removal LS $ 4,950.00 1.00 $ 4,950.00 2 Excavation (Unclassified) CY $ 26.00 586.00 $ 15,236.00 STONE 8 PAVEMENT 3 PC Concrete Pavement, (7") wllntegral Curb, Class "C" SY $ 61.00 309.52 $ 18,880.72 4 Graded Stone Base, 314" TONS $ 15.00 240.76 $ 3,611.40 5 HMA 300k Surtace Course, 1!2" (PG 64-22) TONS $ 155.00 11.16 $ 1,729.80 6 Concrete Filler CY $ 132.00 3.50 $ 462.00 7 Bedding Stone TONS $ 16.00 57.74 $ 923.84 RETAINING WALL ITEMS 8 Limestone (Salvaged) SF $ 28.00 736.19 $ 20,613.32 9 Limestone (New) SF $ 60.00 888.46 $ 53,307.60 10 Structural Concrete CY $ 415.00 205.50 $ 85,282.50 11 Engineered Fill TONS $ 22.00 212.68 $ 4,678.96 12 Satisfactory Soil CY $ 23.00 94.00 $ 2,162.00 13 Geofoam Fill CY $ 89.00 161.73 $ 14,393.97 14 4" Pertorated CPE Drain Tile LF $ 20.00 116.30 $ 2,326.00 15 Wrought Iron Hoop Railing LF $ 106.00 121.80 $ 12,910.80 16 Cable Barrier LF $ 17.00 $ - MISCELLANEOUS 17 Sawcut Pavement -Regardless of Type LF $ 6.00 60.00 $ 360.00 18 Backfill, Topsoil CY $ 46.00 54.00 $ 2,484.00 19 Erosion Control Plan -Operating Procedures LS $ 72.00 1.00 $ 72.00 20 Traffic Control and Safety Control LS $ 1,650.00 1.00 $ 1,650.00 21 Mobilization & Miscellaneous LS $ 17,765.00 1.00 $ 17,765.00 ALTERNATEI 22 ADD -Temporary Pavement -Remove & Replace Tons $ 141.00 25.29 $ 3,565.89 TOTAL AMOUNT EARNED TO DATE: S 263,799.91 CHANGE ORDER -EXTRA WORK ITEMS C1 Geofoam Blocks from Portzen -Deduct CY ($44.67) 79.40 $ (3,sas.8o) C2 Additional Geofoam Blocks-Stored at Garage CY $44.67 52.14 $ 2,329.09 C3 Temporary Barrier Rail LS $720.00 1.00 $ 720.00 C4 4" PCC Sidewalk SF $4.35 445.70 $ 1,936.60 C5 6" PCC Sidewalk (Ped Access Ramp) SF $5.75 339.18 $ 1,950.29 C6 Pedestrian Tile (ADA Tile) SF $31.00 6.00 $ 169.00 C7 Seed/Fertilize & Mulch LS $2,071.30 1.00 $ 2,071.30 C8 6' High Chain Link Fence LS $770.00 1.00 $ 770.00 C9 Remove Barrier Rail LS $1,210.00 1.00 $ 1,210.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 7,628.68 TOTAL AMOUNT EARNED TO DATE: $ 271,428.59 ti Y TOTAL DUE CONTRACTOR: $ 271,428.59 ENGINEERING: $ 27,230.33 TOTAL CONSTRUCTION COST: $ 298,658.92 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milli ,City Manager City of Dub ~ a ~! APPROVED: ~ ~'~"~L71~~ Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR The undersigned, Tschiggfrie Excavating, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement foyr~all claims for said improvement. CONTRACTO~C.~ 1 G~~an_ '~ l~ h'~CIC tJl.~in c~ ~~ TITLE: ~ /y G~g 1 J.1~~ f ~~' ~ DATE: ~! -~f J~`r