TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Town Clock Plaza Concrete Repair Project
CIP 3501273
DATE: September 1, 2009
City Engineer Gus Psihoyos is recommending acceptance of the construction contract
for the Town Clock Plaza Concrete Repair Project, as completed by Eastern Iowa
Excavating, in the final contract amount of $13,730.20, which is a 15.7% increase from
the original contract in the amount of $11,870.00.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Micha I C. Van Milligen
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
THE CITY OF Dubuque
..` !~
DT TR ~ AI-Amer~aChy
~.J L
Masterpiece on the Mississippi
2007
TO: Michael C. Van Milligen, City Man~~er
FROM: Gus Psihoyos, City Engineer
DATE: August 31, 2009
SUBJECT: Town Clock Plaza Concrete Repair Project
CIP 3501273
INTRODUCTION
The enclosed resolution provides for the acceptance of the construction contract for the
Town Clock Plaza Concrete Repair Project.
BACKGROUND
In the spring of 2009, staff observed deteriorating concrete pavement at several
locations near the public plaza area on 7th Street, adjacent to the Town Clock. It was
determined that the entire middle section of the plaza area from the alley to Main Street
needed replacement due to its deteriorated condition. The use of buff-colored concrete
was chosen to complement the existing decorative pavement in the Town Clock and
Main Street areas.
The plaza area on 7th Street by the Town Clock is in the Greater Downtown Urban
Renewal District and the Town Clock Plaza Concrete Repair Project was completed in
compliance with the Secretary of the Interior's Standards for Rehabilitation and
Guidelines for Rehabilitating Historic Structures.
DISCUSSION
On May 22, 2009, five (5) competitive quotations were received for the Town Clock
Plaza Concrete Repair Project. Based on a competitive quotation process for public
improvements in accordance with Iowa Code, Section 26.14, the Town Clock Plaza
Concrete Repair Project was awarded to Eastern Iowa Excavating of Cascade, Iowa, in
the amount of $11,870.
DISCUSSION
The Town Clock Plaza Concrete Repair Project was completed by Eastern Iowa
Excavating of Cascade, Iowa, in the final contract amount of $13,730.20, which is a
15.7% increase from the original contract in the amount of $11,870.00.
RECOMMENDATION
I recommend that the City Council accept the improvements and authorize the payment
of the contract amount of $13,730.20 to Eastern Iowa Excavating for the Town Clock
Plaza Concrete Repair Project.
BUDGET IMPACT
The project funding summary is as follows:
CIP No. Fund Description Fund Amount
3501273 Town Clock Plaza Repair $13,730.20
Total Project Funding ~~~
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolution to accept the
improvements and to authorize the payment of the contract amount of $13,730.20 to
Eastern Iowa Excavating for the Town Clock Plaza Concrete Repair Project.
Prepared by Bob Schiesl, Assistant City Engineer
cc: Jenny Larson, Budget Director
Gil Spence, Leisure Services Manager
K:\PROJECTS\ Town Clock Plaza Concrete Repairs 2009\Council & Staff Documents\Town Clock Plaza
Concrete Repair -Council Acceptance Memo.doc
RESOLUTION NO. 311-09
ACCEPTING THE TOWN CLOCK PLAZA CONCRETE REPAIR PROJECT AND
AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE
CONTRACTOR
Whereas, the Public Improvement Contract for the Town Clock Plaza Concrete
Repair Project (the Project) has been completed and the City Engineer has examined
the work and filed a certificate stating that the Project has been completed according to
the terms of the Public Improvement Contract and that the City Engineer recommends
that the Project be accepted; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved and the Project
is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from
the Town Clock Plaza Repair Capital Improvement Project appropriation for the contract
amount of $13,730.20 less any retained percentage provided for therein as provided in
Iowa Code chapter 573, and to pay such retainage only in accordance with the
provisions of Iowa Code chapter 573.
Passed, approved and adopted this 8th
day of september~ 2009.
' ~° Roy D. Buol, Mayor
s'
Atte t:
~ - ,c~
eanne F. Schneider, CMC, City Clerk
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETTION OF THE TOWN CLOCK
PLAZA CONCRETE REPAIR PROJECT
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the Town Clock Plaza Concrete Repair Project, that the Project has
been performed in compliance with the terms of the Public Improvement Contract, and
that the total cost of the completed work is $13,730.20.
Dated this 3rd day of September, 2009.
City Engineer
Filed in the office of the City Clerk on the 3rd day of September, 2009.
Jeanne F. Schneider, CMC, City Clerk
K:\PROJECTS\Town Clock Plaza Concrete Repairs 2009\Town Clock Plaza Concreter Repair -Council Acceptance
Resolution.doc
City of Dubuque -Engineering Division
Final Payment Form
PAYMENT NO: COUNCIL FINAL DATE: August 25, 2009
PROJECT NAME: TOWN CLOCK PLAZA CONCRETE REPAIR PROJECT
CONTRACTOR: EASTERN IOWA EXCAVATING CONTRACT AMOUNT: $11,870.00
BID ITEM DESCRIPTION UNIT UN T OST QUANTITY FINA~LRAN ODUNT
BASE BID
1 TOWN CLOCK PLAZA CONCRETE REPAIR, AREA#1, COMPLETE LS $ 9,193.00 1.0 $ 9,193.00
2 TOWN CLOCK PLAZA CONCRETE REPAIR, AREA #2, COMPLETE LS $ 966.00 1.0 $ 966.00
TOTAL AMOUNT EARNED TO DATE -BASE BID: $ 10,159.00
ALTERNATE BID
3 DRY SHAKE COLOR SURFACE HARDENER, AREA#1, COMPLETE LS $ 1,711.00 1.0 $ 1,711.00
TOTAL AMOUNT EARNED TO DATE -ALTERNATE BID: $ 1,711.00
CHANGE ORDER(S) -EXTRA WORK ITEMS
4 DECORATIVE CONCRETE PAVEMENT, INTEGRAL ADMIXTURE LS $ 1,025.00 1.0 $ 1,025.00
5 CONCRETE REPAIR, AREA #1, ADDITIONAL QUANTITY SY $ 29.00 28.8 $ 835.20
TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 1,860.20
TOTAL AMOUNT EARNED TO DATE: $ 13,730.2
TOTAL DUE CONTRACTOR: $ 13,730.20
ENGINEERING: ~- 213.72
TOTAL CONSTRUCTION COST: $ 13,943.92
CERTIFICATE OF THE CITY MANAGER:
I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement.
APPROVED:
Michael Van Mil' n, City ager
City of b ,Iowa
APPROVED: ~'~~~.-~'1:.~/~'
Gus Psihoyos, City Engineer
City of Dubuque, Iowa
CERTIFICATE OF THE CONTRACTOR:
The undersigned, EASTERN IOWA EXCAVATING contractor for the above improvement, does hereby
accept the above "Total Due Contractor", as full settlement for all claims for said improvement.
CONTRACTOR: AS RN Ip1NA EXC~! ATING
TITLE: ~`~s.D at -'~
DATE: ~ Z~ ~9~
City of Dubuque -Engineering Division
Final Payment Form
PAYMENT NO: COUNCIL FINAL DATE: August 25, 2009
PROJECT NAME: TOWN CLOCK PLAZA CONCRETE REPAIR PROJECT
CONTRACTOR: EASTERN IOWA EXCAVATING CONTRACT AMOUNT: 511,870.00
BID ITEM DESCRIPTION UNIT UNN OST QUA ALTM FINEARNED NT
BASE BID
1 TOWN CLOCK PLAZA CONCRETE REPAIR, AREA#1, COMPLETE LS $ 9,193.00 1.0 $ 9,193.00
2 TOWN CLOCK PLAZA CONCRETE REPAIR, AREA #2, COMPLETE LS $ 966.00 1.0 $ 966.00
TOTAL AMOUNT EARNED TO DATE -BASE BID: 5 10,159.00
ALTERNATE BID
3 DRY SHAKE COLOR SURFACE HARDENER, AREA #1 COMPLETE LS $ 1,711.00 1.0 $ 1,711.00
TOTAL AMOUNT EARNED TO DATE -ALTERNATE BID: $ 1,711.00
CHANGE ORDER(S) -EXTRA WORK ITEMS
4 DECORATIVE CONCRETE PAVEMENT, INTEGRAL ADMIXTURE LS $ 1,025.00 1.0 $ 1,025.00
5 CONCRETE REPAIR, AREA #1, ADDITIONAL QUANTITY SY $ 29.00 28.8 $ 835.20
TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 1,860.20
TOTAL AMOUNT EARNED TO DATE: l a 13,730.20
TOTAL DUE CONTRACTOR: $ 13,730.20
ENGINEERING: $ 213.72
TOTAL CONSTRUCTION COST: 5 13,943.92
CERTIFICATE OF THE CITY MANAGER:
I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement.
APPROVED:
Michael V I ,City Ma ger
City of ub ,Iowa
APPROVED:
Gus Psihoyos, City Engineer
City of Dubuque, Iowa
CERTIFICATE OF THE CONTRACTOR:
The undersigned, EASTERN IOWA EXCAVATING contractor for the above improvement, does hereby
accept the above "Total Due Contractor", as full settlement for all claims for said improvement.
CONTRACTOR: TE IOWA EXCAVA NG
TITLE~~., ,~~
DATE: ~/ l~'J ~ bGi'
City of Dubuque -Engineering Division
Final Payment Form
PAYMENT NO: COUNCIL FINAL
PROJECT NAME: TOWN CLOCK PLAZA CONCRETE REPAIR PROJECT
DATE: August 25, 2009
CONTRACTOR: EASTERN IOWA EXCAVATING CONTRACT AMOUNT: $11,870.00
BID ITEM DESCRIPTION UNIT UN T OST QUANTITY FINEARNED NT
BASE BID
1 TOWN CLOCK PLAZA CONCRETE REPAIR, AREA#1, COMPLETE LS $ 9,193.00 1.0 $ 9,193.00
2 TOWN CLOCK PLAZA CONCRETE REPAIR, AREA #2, COMPLETE LS $ 966.00 1.0 $ 966.00
TOTAL AMOUNT EARNED TO DATE -BASE BID: $ 10,159.00
ALTERNATE BID
3 DRY SHAKE COLOR SURFACE HARDENER, AREA #1, COMPLETE LS $ 1,711.00 1.0 $ 1,711.00
TOTAL AMOUNT EARNED TO DATE -ALTERNATE BID: r $ 1,711.00
CHANGE ORDER(S) -EXTRA WORK ITEMS
4 DECORATIVE CONCRETE PAVEMENT, INTEGRAL ADMIXTURE LS $ 1,025.00 1.0 $ 1,025.00
5 CONCRETE REPAIR, AREA #1, ADDITIONAL QUANTITY SY $ 29.00 28.8 $ 835.20
TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: r $ 1,880.20
TOTAL AMOUNT EARNED TO DATE: $ 13,730.20
TOTAL DUE CONTRACTOR: $ 73,730.20
ENGINEERING: S 213.72
TOTAL CONSTRUCTION COST: r$ - 13,943.92
CERTIFICATE OF THE CITY MANAGER:
I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement.
APPROVED:
Michael Va_n i en, City Mana er ,.
City of b ~ ,Iowa ^ ~i
~~ ~./ ~~
APPROVED:
Gus Psihoyos, City Engineer
City of Dubuque, Iowa
CERTIFICATE OF THE CONTRACTOR:
The undersigned, EASTERN IOWA EXCAVATING contractor for the above improvement, does hereby
accept the above "Total Due Contractor", as full settlement for all claims for said improvement.
CONTRACT AS EitN WA EX VATING
BY:
TITLE: ~~,,,..[
DATE:T?~°~