Town Clock Plaza Concrete Repair Project AcceptanceTHE CITY OF ~,,,. Dubuque DUB E Aq-Am~icaCilY r Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Town Clock Plaza Concrete Repair Project CIP 3501273 DATE: September 1, 2009 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Town Clock Plaza Concrete Repair Project, as completed by Eastern Iowa Excavating, in the final contract amount of $13,730.20, which is a 15.7% increase from the original contract in the amount of $11,870.00. I concur with the recommendation and respectfully request Mayor and City Council approval. Micha I C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque ..` !~ DT TR ~ AI-Amer~aChy ~.J L Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Man~~er FROM: Gus Psihoyos, City Engineer DATE: August 31, 2009 SUBJECT: Town Clock Plaza Concrete Repair Project CIP 3501273 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Town Clock Plaza Concrete Repair Project. BACKGROUND In the spring of 2009, staff observed deteriorating concrete pavement at several locations near the public plaza area on 7th Street, adjacent to the Town Clock. It was determined that the entire middle section of the plaza area from the alley to Main Street needed replacement due to its deteriorated condition. The use of buff-colored concrete was chosen to complement the existing decorative pavement in the Town Clock and Main Street areas. The plaza area on 7th Street by the Town Clock is in the Greater Downtown Urban Renewal District and the Town Clock Plaza Concrete Repair Project was completed in compliance with the Secretary of the Interior's Standards for Rehabilitation and Guidelines for Rehabilitating Historic Structures. DISCUSSION On May 22, 2009, five (5) competitive quotations were received for the Town Clock Plaza Concrete Repair Project. Based on a competitive quotation process for public improvements in accordance with Iowa Code, Section 26.14, the Town Clock Plaza Concrete Repair Project was awarded to Eastern Iowa Excavating of Cascade, Iowa, in the amount of $11,870. DISCUSSION The Town Clock Plaza Concrete Repair Project was completed by Eastern Iowa Excavating of Cascade, Iowa, in the final contract amount of $13,730.20, which is a 15.7% increase from the original contract in the amount of $11,870.00. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $13,730.20 to Eastern Iowa Excavating for the Town Clock Plaza Concrete Repair Project. BUDGET IMPACT The project funding summary is as follows: CIP No. Fund Description Fund Amount 3501273 Town Clock Plaza Repair $13,730.20 Total Project Funding ~~~ ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $13,730.20 to Eastern Iowa Excavating for the Town Clock Plaza Concrete Repair Project. Prepared by Bob Schiesl, Assistant City Engineer cc: Jenny Larson, Budget Director Gil Spence, Leisure Services Manager K:\PROJECTS\ Town Clock Plaza Concrete Repairs 2009\Council & Staff Documents\Town Clock Plaza Concrete Repair -Council Acceptance Memo.doc RESOLUTION NO. 311-09 ACCEPTING THE TOWN CLOCK PLAZA CONCRETE REPAIR PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Town Clock Plaza Concrete Repair Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Town Clock Plaza Repair Capital Improvement Project appropriation for the contract amount of $13,730.20 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 8th day of september~ 2009. ' ~° Roy D. Buol, Mayor s' Atte t: ~ - ,c~ eanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETTION OF THE TOWN CLOCK PLAZA CONCRETE REPAIR PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Town Clock Plaza Concrete Repair Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $13,730.20. Dated this 3rd day of September, 2009. City Engineer Filed in the office of the City Clerk on the 3rd day of September, 2009. Jeanne F. Schneider, CMC, City Clerk K:\PROJECTS\Town Clock Plaza Concrete Repairs 2009\Town Clock Plaza Concreter Repair -Council Acceptance Resolution.doc City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL DATE: August 25, 2009 PROJECT NAME: TOWN CLOCK PLAZA CONCRETE REPAIR PROJECT CONTRACTOR: EASTERN IOWA EXCAVATING CONTRACT AMOUNT: $11,870.00 BID ITEM DESCRIPTION UNIT UN T OST QUANTITY FINA~LRAN ODUNT BASE BID 1 TOWN CLOCK PLAZA CONCRETE REPAIR, AREA#1, COMPLETE LS $ 9,193.00 1.0 $ 9,193.00 2 TOWN CLOCK PLAZA CONCRETE REPAIR, AREA #2, COMPLETE LS $ 966.00 1.0 $ 966.00 TOTAL AMOUNT EARNED TO DATE -BASE BID: $ 10,159.00 ALTERNATE BID 3 DRY SHAKE COLOR SURFACE HARDENER, AREA#1, COMPLETE LS $ 1,711.00 1.0 $ 1,711.00 TOTAL AMOUNT EARNED TO DATE -ALTERNATE BID: $ 1,711.00 CHANGE ORDER(S) -EXTRA WORK ITEMS 4 DECORATIVE CONCRETE PAVEMENT, INTEGRAL ADMIXTURE LS $ 1,025.00 1.0 $ 1,025.00 5 CONCRETE REPAIR, AREA #1, ADDITIONAL QUANTITY SY $ 29.00 28.8 $ 835.20 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 1,860.20 TOTAL AMOUNT EARNED TO DATE: $ 13,730.2 TOTAL DUE CONTRACTOR: $ 13,730.20 ENGINEERING: ~- 213.72 TOTAL CONSTRUCTION COST: $ 13,943.92 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Mil' n, City ager City of b ,Iowa APPROVED: ~'~~~.-~'1:.~/~' Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, EASTERN IOWA EXCAVATING contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: AS RN Ip1NA EXC~! ATING TITLE: ~`~s.D at -'~ DATE: ~ Z~ ~9~ City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL DATE: August 25, 2009 PROJECT NAME: TOWN CLOCK PLAZA CONCRETE REPAIR PROJECT CONTRACTOR: EASTERN IOWA EXCAVATING CONTRACT AMOUNT: 511,870.00 BID ITEM DESCRIPTION UNIT UNN OST QUA ALTM FINEARNED NT BASE BID 1 TOWN CLOCK PLAZA CONCRETE REPAIR, AREA#1, COMPLETE LS $ 9,193.00 1.0 $ 9,193.00 2 TOWN CLOCK PLAZA CONCRETE REPAIR, AREA #2, COMPLETE LS $ 966.00 1.0 $ 966.00 TOTAL AMOUNT EARNED TO DATE -BASE BID: 5 10,159.00 ALTERNATE BID 3 DRY SHAKE COLOR SURFACE HARDENER, AREA #1 COMPLETE LS $ 1,711.00 1.0 $ 1,711.00 TOTAL AMOUNT EARNED TO DATE -ALTERNATE BID: $ 1,711.00 CHANGE ORDER(S) -EXTRA WORK ITEMS 4 DECORATIVE CONCRETE PAVEMENT, INTEGRAL ADMIXTURE LS $ 1,025.00 1.0 $ 1,025.00 5 CONCRETE REPAIR, AREA #1, ADDITIONAL QUANTITY SY $ 29.00 28.8 $ 835.20 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 1,860.20 TOTAL AMOUNT EARNED TO DATE: l a 13,730.20 TOTAL DUE CONTRACTOR: $ 13,730.20 ENGINEERING: $ 213.72 TOTAL CONSTRUCTION COST: 5 13,943.92 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael V I ,City Ma ger City of ub ,Iowa APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, EASTERN IOWA EXCAVATING contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: TE IOWA EXCAVA NG TITLE~~., ,~~ DATE: ~/ l~'J ~ bGi' City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL PROJECT NAME: TOWN CLOCK PLAZA CONCRETE REPAIR PROJECT DATE: August 25, 2009 CONTRACTOR: EASTERN IOWA EXCAVATING CONTRACT AMOUNT: $11,870.00 BID ITEM DESCRIPTION UNIT UN T OST QUANTITY FINEARNED NT BASE BID 1 TOWN CLOCK PLAZA CONCRETE REPAIR, AREA#1, COMPLETE LS $ 9,193.00 1.0 $ 9,193.00 2 TOWN CLOCK PLAZA CONCRETE REPAIR, AREA #2, COMPLETE LS $ 966.00 1.0 $ 966.00 TOTAL AMOUNT EARNED TO DATE -BASE BID: $ 10,159.00 ALTERNATE BID 3 DRY SHAKE COLOR SURFACE HARDENER, AREA #1, COMPLETE LS $ 1,711.00 1.0 $ 1,711.00 TOTAL AMOUNT EARNED TO DATE -ALTERNATE BID: r $ 1,711.00 CHANGE ORDER(S) -EXTRA WORK ITEMS 4 DECORATIVE CONCRETE PAVEMENT, INTEGRAL ADMIXTURE LS $ 1,025.00 1.0 $ 1,025.00 5 CONCRETE REPAIR, AREA #1, ADDITIONAL QUANTITY SY $ 29.00 28.8 $ 835.20 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: r $ 1,880.20 TOTAL AMOUNT EARNED TO DATE: $ 13,730.20 TOTAL DUE CONTRACTOR: $ 73,730.20 ENGINEERING: S 213.72 TOTAL CONSTRUCTION COST: r$ - 13,943.92 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Va_n i en, City Mana er ,. City of b ~ ,Iowa ^ ~i ~~ ~./ ~~ APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, EASTERN IOWA EXCAVATING contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACT AS EitN WA EX VATING BY: TITLE: ~~,,,..[ DATE:T?~°~