Loading...
Heeb Street Retaining Wall Reconstruction ProjectTHE CITY OF Dubuque DuB E ~~~~~~~ ~ r Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Heeb Street Retaining Wall Reconstruction Project CIP 1002086 -Heeb Street Wall DATE: September 1, 2009 City Engineer Gus Psihoyos recommends initiation of the bidding process for the Heeb Street Retaining Wall Reconstruction Project, and further recommends that a public hearing be set for September 21, 2009. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic el C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THECrrY OF Dubuque DLTB E ~"'~~' ~ r Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: August 31, 2009 SUBJECT: Heeb Street Retaining Wall Reconstruction Project CIP 1002086 -Heeb Street Wall INTRODUCTION The enclosed resolutions authorize the public bidding procedure for the Heeb Street Retaining Wall Reconstruction Project. BACKGROUND The Heeb Street Retaining Wall is located at the intersection of Kaufmann Avenue and Heeb Street. This is an existing City-owned limestone retaining wall that is showing signs of distress (existing stones have broken loose from the wall). The wall height varies from 7 feet to 11 feet, with a wall length of 75 feet. The wall supports Heeb Street (a 20-foot wide street) and has an 8-inch sanitary sewer main and 4-inch watermain in close proximity. The Engineering Department has worked with IIW Engineers & Surveyors, PC to analyze the existing wall. Concrete barriers were placed (summer of 2008) in the parking lot behind Meineke Muffler at the corner of Heeb Street and Kaufmann Avenue to protect pedestrians and vehicles from possible falling rock. DISCUSSION Engineering is proposing that the project base bid include wall reconstruction with native Dubuque limestone, with geofoam as a backfill material. This reconstruction would be similar to the retaining walls at Grove Terrace and St. Mary's Street. The existing wall is limestone which is why Engineering proposes this as the base bid. An alternate bid would be installation of an integral, limestone-buff colored concrete wall that would simulate the look of native limestone. This type of installation was done successfully at the Loras College Alumni Center. In order to reconstruct the retaining wall, most of the street will need to be removed to accommodate the backfill. Along with this work, the watermain and sanitary sewer utilities will need to be partially reconstructed and protected to accommodate the work. The street pavement would be 7-inch concrete and match the existing width of 20 feet. PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process Publish Notice to Bidders, Advertise for Bids Notice of Public Hearing on Plans & Specifications Pre-Bid Meeting Public Hearing Receipt of Bids Award Construction Contract Project Completion Date RECOMMENDATION September 8, 2009 September 11, 2009 September 11, 2009 September 15, 2009 September 21, 2009 September 24, 2009 October 5, 2009 November 13, 2009 I recommend that the City Council establish a date for the public hearing and authorize the City Clerk to advertise for proposals. BUDGET IMPACT The estimate of probable cost for the Heeb Street Retaining Wall Reconstruction Project is as follows: Estimate Construction Contract $135,251.00 Contingency (15%) 20,287.65 Construction Engineering & Inspection (15%) 23,330.80 Total Project Cost 5178,869.45 The funding for the Heeb Street Retaining Wall Reconstruction Project will be as follows: CIP No. Fund Description Fund Amount 1002086 Heeb Street Wall $178,869.45 Total Project Funding 5178,869.45 ACTION TO BE TAKEN The City Council is requested to establish the date of the public hearing and to authorize the City Clerk to advertise for proposals through adoption of the enclosed resolutions for the Heeb Street Retaining Wall Reconstruction Project. Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Don Vogt, Public Works Director Bob Green, Water Department Manager Bob Schiesl, Assistant City Engineer RESOLUTION NO. 331-09 HEEB STREET RETAINING WALL RECONSTRUCTION PROJECT PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: the proposed plans, specifications, form of contract and estimated cost for the Heeb Street Retaining Wall Reconstruction Project, in the estimated amount $178,869.45, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. a public hearing will be held on the 21St day of September, 2009, at 6:30 p.m. in the Historic Federal Building Council Chambers at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. The Heeb Street Retaining Wall Reconstruction Project is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four but not more than forty-five days before the date for filing bids before 2:00 p.m. on the 24t" day of September, 2009. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:30 p.m. on the 5t" day of October, 2009, in the Historic Federal Building Council Chambers (second floor), 350 West 6t" Street, Dubuque, Iowa. Passed, adopted and approved this gth Attest: r7 / , Jeanne F. Schneider, CMC, City Clerk day Of September , 2009. .~ 2 [/.~/ F b ~fi/'z.~~ti + Roy D. 13uo1, Mayor NOTICE OF PUBLIC HEARING ON CONTRACT, AND ESTIMATED COST WALL RECONSTRUCTION PROJECT PLANS, SPECIFICATIONS, FORM OF FOR THE HEEB STREET RETAINING NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Heeb Street Retaining Wall Reconstruction Project, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 21St day of September, 2009, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: Engineering is proposing that the project base bid include wall reconstruction with native Dubuque limestone, with geofoam as a backfill material. This reconstruction would be similar to the retaining walls at Grove Terrace and St. Mary's Street. An alternate bid would be installation of an integral, limestone-buff colored concrete wall that would utilize form liners to simulate native limestone. This type of installation was done successfully at the Loras College Alumni Center. In order to reconstruct the retaining wall, most of the street will need to be removed to accommodate the backfill. Along with this work, the watermain and sanitary sewer utilities will need to be partially reconstructed and protected to accommodate the work. The street pavement will be replaced with 7-inch concrete in the area of the wall reconstruction. Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. 2009. Published by order of the City Council given on the day of , Jeanne F. Schneider, CMC, City Clerk NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT HEEB STREET RETAINING WALL RECONSTRUCTION PROJECT Time and Place for Filing Sealed Proposals. Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on September 24, 2009, in the Office of the City Clerk, City Hall -First Floor, 50 West 13th Street, Dubuque, Iowa. Time and Placed Sealed Proposals Will be Opened and Considered. Sealed proposals will be opened and bids tabulated at 2:00 ~.m. on September 24, 2009, at City Hall - Conference Room A, 50 West 13t Street, Dubuque, Iowa, for consideration by the City Council (Council) at its meeting on October 5, 2009. The City of Dubuque, Iowa, reserves the right to reject any and all bids. Time for Commencement and Completion of Work. Work on each improvement shall be commenced within 10 days after the Notice to Proceed has been issued and shall be fully completed by November 13, 2009. Bid Security. Each bidder shall accompany its bid with a bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be in the amount of ten percent (10%) of the amount of the contract and shall be in the form of a cashier's check or certified check drawn on astate-chartered or federally chartered bank, or a certified share draft drawn on astate-chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satisfactory to the governmental entity. The bid bond shall contain no conditions excepted as provided in this section. Contract Documents. Copies of the construction documents may be obtained at the Engineering Department, City Hall -Second Floor, 50 West 13th Street, Dubuque, Iowa 52001. No plan deposit is required. Preference for Iowa Products and Labor. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. General Nature of Public Improvement. Heeb Street Reconstruction Project CIP 1002086 Engineering is proposing that the project base bid include wall reconstruction with native Dubuque limestone, with geofoam as a backfill material. This reconstruction would be similar to the retaining walls at Grove Terrace and St. Mary's Street. An alternate bid would be installation of an integral, limestone-buff colored concrete wall that would utilize form liners to simulate native limestone. This type of installation was done successfully at the Loras College Alumni Center. In order to reconstruct the retaining wall, most of the street will need to be removed to accommodate the backfill. Along with this work, the watermain and sanitary sewer utilities will need to be partially reconstructed and protected to accommodate the work. The street pavement in the vicinity of the retaining wall repair will be replaced with 7-inch concrete. Pre-Bid Construction Conference. Each prospective bidder is encouraged to attend the Pre-Bid Construction Conference to be held at 3:00 PM on September 15, 2009, at the Conference Room B in City Hall at 50 W. 13th Street, Dubuque, Iowa. Attendance by all prospective bidders is not mandatory but highly recommended. Published in the Telegraph Herald, September 11, 2009. CITY OF DUBUQUE HEEB STREET RETAINING WALL ENGINEER'S ESTIMATE NO. DESCRIPTION QUANTITY UNIT PRICE BID PRICE 1 Mobilization & Miscellaneous LS 1 $12,000.00 $12,000.00 2 Erosion Control LS 1 $1,800.00 $1,800.00 3 Traffic Control LS 1 $2,900.00 $2,900.00 4 Removal of Pavement SY 170 $15.00 $2,550.00 5 Structure Removal LS 1 $12,000.00 $12,000.00 g Excavation (Unclassified) CY 395 $20.00 $7,900.00 7 Limestone SF 720 $60.00 $43,200.00 g Structural Concrete CY 55 $400.00 $22,000.00 g Engineered Fill TON 260 $35.00 $9,100.00 10 Geofoam Fill CY 46.2 $90.00 $4,158.00 11 Drainage Fill TON 45 $25.00 $1,125.00 12 Stone Base TON 70.3 $30.00 $2,109.00 13 Class A Crushed Stone TON 12 $30.00 $360.00 14 2.5' PCC Curb & Gutter LF 72 $30.00 $2,160.00 15 6" HMA Patching SY 125 $45.00 $5,625.00 16 4" Perforated CPE Drain Tile LF 72 $12.00 $864.00 17 Vinyl Coated Chain Link Fence LF 72 $75.00 $5,400.00 Total $135,251.00 Contingency 15% $20,287.65 Total w/ Contingency $155,538.65