2009 Sewer CIPP Lining ProjectTHE CTTY OF
~V~
E
Masterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: 2009 Sewer CIPP Lining Project
(CIP 7101637: Sanitary Sewer Lining Program)
(CIP 7101289: General Sanitary Sewer Repairs)
(CIP 7201066: General Storm Sewer Repairs)
DATE: September 1, 2009
Dubuque
AN-AmerlcaClty
~1r.~
2007
City Engineer Gus Psihoyos recommends City Council approval of the plans,
specifications, form of contract and the estimated cost of $182,716.60 for the 2009
Sewer CIPP Lining Project
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Mic ael C. Van Milligen
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
THE CITY OF Dubuque
DLTB E ~~
~ r
IVlasterpiece on the Mississippi
2007
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer 4,~
DATE: August 31, 2009
SUBJECT: 2009 Sewer CIPP Lining Project
(CIP 7101637: Sanitary Sewer Lining Program)
(CIP 7101289: General Sanitary Sewer Repairs)
(CIP 7201066: General Storm Sewer Repairs)
INTRODUCTION
The purpose of this memo is to recommend adoption of the attached resolution
approving the plans, specifications, form of contract and the estimated cost for the 2009
Sewer CIPP Lining Project to be considered at a public hearing.
BACKGROUND
With age, sanitary sewers deteriorate. Cracks and bad joints form, compromising the
integrity of the sewer. In addition, stormwater and groundwater can infiltrate into the
sanitary sewer. Both conditions can cause the overloading of the City's sanitary sewer
system.
The high costs and inconvenience to the public associated with the excavation and
restoration of pavement for sanitary sewer rehabilitation projects has led to the
development of "trenchless" technologies. Cured-in-Place Pipe (CIPP) is a versatile
trenchless method for restoring structural integrity to sewer mains.
CIPP is aresin-impregnated tube that is installed in an existing damaged or leaking
sewer. Once inserted into the pipe, it is expanded and cured by applying heat. The liner
is a seamless, joint-less pipe with a smooth inner surface that increases the flow
capacity of the pipe. The seamless pipe also prevents infiltration. Robotic cutters are
then used to restore private sewer service connections.
DISCUSSION
The sewers identified for lining as part of the 2009 Sewer CIPP Lining Project are as
follows:
Location Sewer
Diameter
Inches Length
(Feet)
Glen Oak from Vernon St. to Edina St. 8-inch 333
Grove Terrace near 12th St. 8-inch 176
Kirkwood St. from Alta Vista to W. Locust 8-inch 1,676
Fenelon St. (Storm Sewer) 12-inch 50
W. 32"d St. from Wildwood to the east 24-inch 825
TOTAL 3,060
In addition, two brick manholes on Loras Boulevard near Prairie Street will be
rehabilitated. In addition to the sanitary sewers to be lined, a small section of storm
sewer on Fenelon Street will also be lined as part of the project.
RECOMMENDATION
recommend approval of the plans, specifications, form of contract and the estimated
cost for the 2009 Sewer CIPP Lining Project.
BUDGET IMPACT
The cost estimate for the 2007 Sewer CIPP Lining Project is:
Estimate
Construction $144,440.00
Contingency $ 14,444.00
Engineering $ 23,832.60
Total Project Cost $182.716.60
The project will be funded as follows:
CIP Funding Source Amount
7101637 FY 2009 Sanitary Sewer Lining Program $ 69,684.00
7101637 FY 2010 Sanitary Sewer Lining Program $100,000.00
7101289 FY 2010 General Sanitary Sewer Repairs $ 7,346.00
7201066 FY 2010 General Storm Sewer Repairs $ 5,686.60
Total Project Funding $182 716 60
ACTION TO BE TAKEN
I respectfully request that the City Council adopt the attached resolution approving the
plans, specifications, form of contract and the estimated cost for the 2009 Sewer CIPP
Lining Project.
Prepared by Deron Muehring, Civil Engineer II
cc: Jenny Larson, Budget Director
Deron Muehring, Civil Engineer II
RESOLUTION NO. 335-09
APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND
ESTIMATED COST FOR THE 2009 SEWER CIPP LINING PROJECT
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That the proposed plans, specifications, form of contract and estimated cost for
the 2009 Sewer CIPP Lining Project, in the estimated amount $182,716.60, are hereby
approved.
Passed, adopted and approved this stn day of sew, 2009.
~~ ~~ f; ?f
f~ ( 4'~/
~~,. Roy D. Buol, Mayor
Attest:
,~