Loading...
Heeb Street Retaining Wall Reconstruction ProjectTAE crrY o~ Dubuque ~T T ~1 ~ NI-An~rica C~y+ ~.,j j„~ Mc~st~rpiece an the Mississippi . 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Heeb Street Retaining Wall Reconstruction Project CIP 1002086 -Heeb Street Wall DATE: September 14, 2009 City Engineer Gus Psihoyos recommends City Council approval of the plans, specifications, form of contract and the estimated cost of $178,869.45 for the Heeb Street Retaining Wall Reconstruction Project. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: September 11, 2009 SUBJECT: Heeb Street Retaining Wall Reconstruction Project CIP 1002086 -Heeb Street Wall INTRODUCTION The enclosed resolution is in reference to the public hearing on the Heeb Street Retaining Wall Reconstruction Project. BACKGROUND The Heeb Street Retaining Wall is located at the intersection of Kaufmann Avenue and Heeb Street. This is an existing City-owned limestone retaining wall that is showing signs of distress (existing stones have broken loose from the wall). The wall height varies from 7 feet to 11 feet, with a wall length of 75 feet. The wall supports Heeb Street (a 20-foot wide street) and has an 8-inch sanitary sewer main and 4-inch watermain in close proximity. The Engineering Department has worked with IIW Engineers & Surveyors, PC to analyze the existing wall. Concrete barriers were placed (summer of 2008) in the parking lot behind Meineke Muffler at the corner of Heeb Street and Kaufmann Avenue to protect pedestrians and vehicles from possible falling rock. DISCUSSION Engineering is proposing that the project base bid include wall reconstruction with native Dubuque limestone, with geofoam as a backfill material. This reconstruction would be similar to the retaining walls at Grove Terrace and St. Mary's Street. The existing wall is limestone which is why Engineering proposes this as the base bid. An alternate bid would be installation of an integral, limestone-buff colored concrete wall that would simulate the look of native limestone. This type of installation was done successfully at the Loras College Alumni Center. In order to reconstruct the retaining wall, most of the street will need to be removed to accommodate the backfill. Along with this work, the watermain and sanitary sewer utilities will need to be partially reconstructed and protected to accommodate the work. The street pavement would be 7-inch concrete and match the existing width of 20 feet. RECOMMENDATION recommend that the City Council approve the plans, specifications, form of contract and the estimated cost for the Heeb Street Retaining Wall Reconstruction Project. BUDGET IMPACT The estimate of probable cost for the Heeb Street Retaining Wall Reconstruction Project is as follows: Estimate Construction Contract $135,251.00 Contingency (15%) 20,287.65 Construction Engineering & Inspection (15%) 23,330.80 Total Project Cost $178,869.45 The funding for the Heeb Street Retaining Wall Reconstruction Project will be as follows: CIP No. Fund Description Fund Amount 1002086 Heeb Street Wall $178,869.45 Total Project Funding $178,869.45 ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications, form of contract and the estimated cost for the Heeb Street Retaining Wall Reconstruction Project. Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Don Vogt, Public Works Director Bob Green, Water Department Manager Bob Schiesl, Assistant City Engineer RESOLUTION 368-09 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE HEEB STREET RETAING WALL RECONSTRUCTION PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Heeb Street Retaining Wall Reconstruction Project, in the estimated amount $178,869.45, are hereby approved. Passed, approved and adopted this 21St day of September, 2009. Jo c E Connors, Mayor Pro-Tem Attest: Jeanne F. Schneider, CMC, City Clerk