Heeb Street Retaining Wall Reconstruction Project AwardTHE CITY OF ^~~. DUB E Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Heeb Street Retaining Wall Reconstruction Project CIP 1002086 -Heeb Street Wall DATE: September 28, 2009 Dubuque All-AmericaCiry 2007 Sealed bids were received for the Heeb Street Retaining Wall Reconstruction Project. City Engineer Gus Psihoyos recommends award of the contract to the low bidder, Drew Cook & Sons Excavating, Inc., in the amount of $98,567.00, which is 27.1 % under the engineer's estimate of probable cost. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque --•~., ~T T ~ ~ A~-America Cp1- (~ Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Manag SUBJECT: Heeb Street Retaining Wall Reconstruction Project CIP 1002086 -Heeb Street Wall FROM: Gus Psihoyos, City Engineer ~~ DATE: September 25, 2009 INTRODUCTION The enclosed resolutions authorize the award of the construction contract for the Heeb Street Retaining Wall Reconstruction Project. BACKGROUND The Heeb Street Retaining Wall is located at the intersection of Kaufmann Avenue and Heeb Street. This is an existing City-owned limestone retaining wall that is showing signs of distress (existing stones have broken loose from the wall). The wall height varies from 7 feet to 11 feet, with a wall length of 75 feet. The wall supports Heeb Street (a 20-foot wide street) and has an 8-inch sanitary sewer main and 4-inch watermain in close proximity. DISCUSSION The project base bid includes the wall reconstruction with native Dubuque limestone, with geofoam as a backfill material. In order to reconstruct the retaining wall, most of the street will be removed to accommodate the backfill. The street pavement will be 5- inch asphalt to match the existing width of 20 feet. This reconstruction would be similar to the retaining walls at Grove Terrace and St. Mary's Street. An alternate bid was also considered for the use of integral, limestone-buff colored concrete wall that would simulate the look of native limestone. BID RESULTS Sealed bids were received on the project on September 24, 2009. Drew Cook & Sons Excavating, Inc. of Dubuque, Iowa, submitted the low base bid in the amount of $98,567.00. This amount is 27.1 % under the engineer's estimate of probable cost. - - --~`- - - - - -- -- - `-~`=---- -- --'t._~'"',~~~==tea '~~-~- - - =- ` - - -_ ~ -- - - _ __ - ~~~':~-ter -- ~$ _ _ .- -_ ~-_a:.S=a=te _ ~- r~ hJ'~_h~__ __ - -cam w.-~ _ _ _ _ - - -2t_3_ ---~~-a-a=--` ---- _ -~.~-~-~.~f ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the Heeb Street Retaining Wall Reconstruction Project to Drew Cook & Sons Excavating, Inc. in the amount of $98,567.00. cc: Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer Bob Green, Water Department Manager Don Vogt, Public Works Director Dan Brown, Fire Chief Jon Dienst, Civil Engineer RESOLUTION NO. 374-09 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE HEEB STREET RETAINING WALL RECONSTRUCTION PROJECT Whereas, sealed proposals have been submitted by contractors for the Heeb Street Retaining Wall Reconstruction Project (the Project) pursuant to Resolution No. 331-09 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 11t" day of September, 2009. Whereas, said sealed proposals were opened and read on the 24t" day of September, 2009 and it has been determined that Drew Cook & Sons Excavating, Inc. of Dubuque, Iowa, with a bid in the amount of $98,567.00, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Drew Cook & Sons Excavating, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this Stn day of October , 2009. ~~ ~ r~ ~ ~ ~ ,~f" Roy D. Buol, Mayor Attest: Deanne F. Sc nei er, CMC, City Clerk 7HE CITY OF DUB E Masterpiece on the Mississippi CITY OF DUBUQUE ENGINEERING DEPARTMENT BID TABULATION RESULTS PROJECT: Heeb Street Retaining Wall Reconstruction LETTING DATE: September 24.2009 Bidder: Drew Cook 8 Sons 6cw Bidder: Arensdorf 6ccevating, Inc. Bidder: Portzen ConsWdion, Ins Bidder Tschiggfrie Excavating, Inc. Bidder. Connelly ConsWdion, inc. NO. DESCRIPTION QUANTITY UNIT PRICE BID PRICE UNIT PRICE BID PRICE UNIT PRICE BID PRICE UNIT PRICE BID PRICE UNIT PRICE BID PRICE l1aM Bid • LI . ,,. Rafa4Nrq Wall YM f3aWOiNr BasldW 1 Mobilization 8 Miscellaneous LS 1 $3,000.00 $3.000.00 $5,200.00 $5.200.00 510,000.00 $10.000.00 $12.100.00 $12.100.00 $7,017.00 $7,017.00 2 Erosion Control LS 1 $400.00 $400.00 52.000.00 $2.000.00 52,000.00 $P.000_p0 $500.00 $500.00 53.109.00 $3.109.00 3 Traffic Control LS 1 $500.00 $500.00 51,200.00 $1.200.00 $550.00 $550.00 5500.00 $500.00 53,207.50 $3.207.50 4 Remove Pavement SY 400 55.10 $2.040.00 $8.00 $3.200.00 53.50 $1,gp0.00 $7.50 $3.000.00 56.25 $2.500.00 5 Salvage Existing Brick Pavers SY 400 $4.80 $1.920.00 $4.00 $1.800.00 $10.00 8q,p00,00 $9.65 83.880.00 $7.80 $3.120.00 6 Structure Removal LS 1 $4,000.00 $4.000,00 $145.00 $145.00 $5,000.00 85.000.00 $8,030.00 56.030.00 543,511.00 $43.511.00 7 Excavation (Undassifiedl CY 320 $12.00 $3,840.00 55.00 $1.800.00 $9.00 $2,880.00 515.85 $5.072.00 $37.00 $11.840.00 8 Tuckooint and Repair Existing Wall LS 1 52,500.00 52.500.00 55,000.00 $5.000.00 56,825.00 $8,845.00 $5,000.00 g5,Op0.p0 $7,545.00 $7,545.00 9 Limestone SF 720 $45.00 $32.400.00 542.00 $30.240.00 $47.25 $34,020.00 $59.00 $44.480.00 $87.00 $62.640.00 10 Strudurel Concrete CY ~ 5300.00 525.800.00 $400.00 $34-400.00 5400.00 534.400.00 5425.00 538.550.00 5168.00 $14.448.00 _ 11 Engineered Fill TON 260 $8.00 $2.080.00 513.00 $3.380.00 $18.00 $4.680.00 521.75 $5.855.00 $15.70 gq,Og4.00 12 Geofoam Fill CY 50 $10.00 $500.00 $32.00 $1.800.00 $25.00 $1.250.00 542.25 52.112.50 511.50 $575.00 13 Drainage Fill TON 5 516.00 $80.00 $13.00 $65_pp $25.00 $125.00 545.50 $227.50 $56.00 5280.00 14 Stone Base TON 280 $14.00 $3.920.00 513.00 $3.840.00 $15.00 54,200.00 $16.00 $4.480.00 520.00 $5.800.00 15 Class A Crushed Stone TON 24 514.00 5336.00 513.00 $312.00 520.00 2880.00 $33.00 87g4.p0 522.50 85gp.00 18 2.5' PCC Curb 8 Gutter LF 78 $20.00 $1.560.00 526.00 $2.028.00 516.00 $1.248.00 $26.70 $2.082.80 $23.25 $1.813.50 17 6" HMA Patching SY 400 $19.50 $7.800.00 $28.50 $11.400.00 530.00 $14.000.00 $55.00 $22.000.00 542.25 $16.900.00 18 4" Perforated CPE Drain Tile LF 72 $5.00 83gp.00 $4.00 84gg.p0 59.00 $648.00 514.40 $1.038.80 51.75 5128.00 19 Chain Link Fence LF 75 517.00 $1.275.00 545.00 $3.375.00 519.00 51.425.00_ _ $25~~ $1.875.00 519.50 $1,462.50 20 B" DIP Sanitary Sewer. CL 50/350 LF 78 538.00 $2,964.00 ~~~ 53-588.00 $37.00 $2.888.00 594.50 $7.371.00 581.30 $6.341.40 21 Connection to Existing Sanitary Sewer w/ Flt EA 2 $100.00 $200.00 $300.00 $600.00 $250.00 8500,00 $700.00 51,400,00 $515.25 $1,030.50 22 Select Trench Backfill (Sanitary) LF 78 $14.00 51,092.00 512.50 $975.00 $17.00 $1,326.00 $17.45 51.361.10 541.10 $3.205.80 TOTAL BABE BID ~ 598,567.00' ~ $115,836.00, I $131,843.00' ~ $165,485.50 ~ ~ $200,894.20 Engineer's Cost Estimate Base: $ 135, 251.00 ~ -27 1 % ' ~ -14.4% ' I -2.5% ~ ~ 22.4% ' ~ 48.5% ARemaEe No. 7 - tAst4n~agoe coneroa RataiMng wag 1 Mobilization 8 Miscellaneous LS 1 $3,000.00 $3.000.00 $5,200.00 $5-200.00 _ 510,000.00 $10.000.00 $12,100.00 $12.100.00 $7,017.00 $7.017.00 2 Erosion Control LS 1 $400.00 $400.00 $2,000.00 82,pp0.pp $2,000.00 $2.000.00 $500.00 $500.00 53,109.00 $3.109.00 3 Treffic Control LS 1 $500.00 $500.00 51,200.00 81,2p0,pp $550.00 $550.00 $500.00 8500.00 $3,207.50 $3207.50 4 Removal of Pavement SY 400 $5.10 82,040.00 _ 88.00 $3.200.00. $3.50 81 400.00 $7.50 $3-000.00 $6.25 $2 500.00 5 Salvage Existing Brick Pavers SY 400 $6.80 82,720.00 $4.00 $1.600.00. $10.00 $4.000.00 $9.85 $3-880.00 57.80 $3.120.00 6 Structure Removal LS 1 $4,800.00 $4.800.00 .$14,500.00 $14,500.00. 55,000.00 $5.000.00 $6,030.00 $6.030.00 543,511.00 $43 511.00 7 Excavation (Unclassified) CY 320 $12.00 $3.840.00 $5.00 $1.600.00 $9.00 $2.880.00 $15.85 $5.072.00 537.00 $11 840.00 8 Tuckooint and Repair Existing Wall LS 1 52,500.00 $2.500.00 $5,0.00 $5.000.00. 56.825.00 86,825.00 $6,500.00 $6.500.00 57,545.00 $7,545.00 9 Structurel Concrete CY 23 $425.00 $9775.00 5400.00 $9.200.00. _ $447.00 $10.281.00 $475.00 $10.925.00 ~~~~ $11362.00 10 Structural Concrete (colored) CY 32 $875.00 828,000.00 5650.00 $20.800.00- $920.00 $29.440.00 5925.00 $29.600.00 51,016.00 $32 512.00 11 Precast Concrete Capstone LF 72 $49.70 $3,578.40 522.00 $1.584.00- 543.00 $3.096.00 5200.00 $14.400.00 570.00 $5.040.00 12 Engineered Fill TON 320 $8.00 82.880.00 $13.00 $4,160.00- $18.00 $5.780.00 $21.75 $8.960.00 515.70 $5024.00 13 Dreinaoe Fill TON 45 $16.00 $720.00 513.00 $585.00- $18.00 $810.00 545.50 $2.047.50 $56.00 $2.520.00 14 Stone Base TON 280 $14.00 $3.920.00 $13.00 $3.640.00- $15.00 $q,200.00 $16.00 $4,480.00 520.00 $5.600.00 15 Class A Crushed Stone TON 24 $14.00 $336.00 513.00 $312.00- $20.00 $480.00 $33.00 $782.00 $22.50 8540.00 16 2.5' PCC Curb 8 Gutter LF 72 $20.00 $1 440.00 $26.00 $1.872.00 518.00 $1.152.00 $28.70 $1.922.40 824.00 $1 728.00 6" HMA Patchino SY 400 519.50 $7-600.00 $28.50 $11.400.00 $30.00 $12.000.00 $55.00 822.000.00 542.25 $18.900.00 17 4" Perforated CPE Drain Tile LF 72 $5.00 $360.00 x.00 $288.00 $9.00 $648.00 $14.40 $1.038.80 $1.75 $126.00 18 Chain Link Fence LF 75 $17.00 $1.275.00 $45.00 $3.375.00 $19.00 $1 425.00 $25.00 $1.875.00 819.50 81 462.50 20 8" DIP Sanitary Sewer. CL 50/350 LF 78 $38.00 82,884.00 $46.00 83-588.00 $37.00 $2 886.00 $94.50 $7.371.00 581.30 $8.341.40 21 Connection to Existino Sanitary Sewer w/ Fle EA 2 $100.00 $200.00 $300.00 $600.00 5250.00 $500.00 5700.00 $1.400.00 $515.25 $1.030.50 22 Select Treneh Backfill (Sanitary) LF 78 $14.00 $1,092.00 $12.50 $975.00 $17.00 $1,326.00 $17.45 $1.361.10 $41.10 $3.205.80 TOTAL ALTERNATE BID ~ 583,820.40 ~ ~ 596,679.00 ~ ~ 5706,659.00 ~ ~ 2143,732.60 ~ ~ 5775,241.70 Engineers Cost Estimate Alternate: $ 145,579.50 ~ -42.4% ' ~ -33.6% ~ ~ -26.7% ~ ~ -1.3% ~ ' 20.4%