Loading...
Signed Contracts_Trail at Bergfeld Recreation Area Project THE CTTY OF Dubuque D All-AmericBGity UB E ~ r Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Manager FROM: Gil D. Spence, Leisure Services Manager SUBJECT: Trail at Bergfeld Recreation Area Project DATE: September 23, 2009 Attached is change order 1 for the Trail at the Bergfeld Recreation Area Project. The sheet outlines the three parts of the change order with the largest part, $21,300, to install six inch sub drain with bedding stone. This will help dry out a very wet area to allow for construction and will then keep the area dry in the future. After a very wet late summer, construction is moving along nicely and completion is expected by mid-November. Please sign the change order and return it to me. Thanks! GDS:et attachment CHANGE ORDER Change Order No: 1 Date. September 18, 2009 Agreement Date: August 17, 2009 Owner: 0 7147 02 Contractor Drew Cook Excavarin Description of Change: 1. Change specification to allow placement of 1 '/a" base stone as first lift of base stone (a depth of 4" to 5"). Lump sum cost of $1,500.00. Graded base stone will be paid the contract unit price per ton if the gradation is 3/a" stone or 1 '/a" stone except for the lump sum adjustment as indicated. ADD: ,8'1,500.00 Iowa Pro'ect: Trail Pro'ect at Ber feld Recreation Area N 0 2. Add a bid item for Stabilization Stone, 3" to 6" Clean Stone: Contract unit price of $17.25/Ton. Unit price includes core out. Quantity will be the quantity determined by the weight tickets, when placed at locations as approved by the Engineer. Basis of payment shall be by the tons installed. Estimated quantity to be 100 tons for an estimated cost of $1,725.00. ADD: $1, 725.00. 3. Add a bid item for Six Inch (6") Subdrain with Bedding Stone: Contract unit price of 17.75/LF. Unit price includes all materials and labor to install the subdrain at locations as approved by the Engineer. Anticipated locations are from Station 20+00 to 31+00. The installation will require 4 outlets. The outlets shall be installed in accordance with the Iowa DOT Standard Road Plan RF- 19F. The total estimated cost is $21,300.00. The basis of payment shall be the linear foot installed. ADD: $21, 300.00 Justification for Change: 1. The Contractor is placing base stone in two lifts, a larger gradation as the first lift allows construction traffic to transport and place the second lift with less rutting of the first lift than if''/a" base stone was used. 2. This material will serve as a "French Drain: to allow seepage from the hillside to drain under the pavement and reduce the pavement susceptibility to freeze thaw. This material also provides stabilization of the trail. The original stabilization stone bid was not clean enough material to allow the continued drainage. 3. Side hill seepage is present at several locations. This will allow the water to be intercepted prior to reaching the trail to allow the subgrade to stay firm, Subdrain outlets will allow the water to have an outlet and be transported away from the trail base. After the trail is paved this will keep the material under the trail from being saturated and susceptible to distortion under traffic. This need was made evident since the site is still wet after 2 weeks without rain. Change in Contract Price: The amount of the contract will be Increased by this change order by the sum of Twenty four thousand five hundred twenty five dollars and zero cents. $24,525.00 Adjustment in Amount of Contract: 1. Amount of Original Contract $ 392,087.70 2. Net (Addition) (Reduction) due to all previous change orders $ 0.00 3. Amount of contract not including this change order $ 392,087.70 4. Addition to contract due to this change order $ 24,525.00 5. Amount of contract including this change order $ 416,612.70 I-1 Change Order 1 Change Order Conditions: The contract completion period established by the original contract and previous change orders will remain unchanged. Work performed under this change order will be subject to all the requirements as stated herein and in the contract documents and all change orders. The Contractor expressly agrees that he will place under coverage of his Contractor's Improvement Bond and insurance all work covered by this change order. All work performed under this change order shall be performed in accordance with the requirements of this change order, the plans, the specifications, and the contract documents. Recommended for Acceptance: IIW ENGINEERS & SURVEYORS, P.C. I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. FOR 1TW ENGINEERS & SURVEYORS, P.C. Julie Neebel, P.E. Date License Number 14690 My license renewal date is December 31, 2010 SEAL Pages or sheets covered by this seal: Change Order No. 1 Attachment: Iowa DOT Standard Road Plan RF-19F Accepted and/or Requested: Accepted and/or Requested: Attest (Optional): BY Signature NAME Type or Print TITLE CONTRACTOR: Drew Cook Excavating BY Signature NAME Type or Print TTTLE DATE OWNER: C' of Dubuque, Iowa BY --~ ' Si~g,~n,,a~ture NAME: ~. yC/f~ y ~ ~~G~L,~Y ~r q~ Type or Print TITLE: ~'a"~~ ~~'~y. DATE y~„~/O f i I-2