Loading...
Sewer CIPP LIning Project 2009THE CITY OF Dubuque Dj T~ ~ Aq-AmericaCi~ ~..J I Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2009 Sewer CIPP Lining Project (CIP 7101637: Sanitary Sewer Lining Program) (CIP 7101289: General Sanitary Sewer Repairs) (CIP 7201066: General Storm Sewer Repairs) DATE: September 28, 2009 City Engineer Gus Psihoyos recommending City Council approval of the plans, specifications, form of contract and the estimated cost of $182,716.60 for the 2009 Sewer CIPP Lining Project. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque --.. DUB E ~"~~'~~~ i 1 Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: September 25, 2009 SUBJECT: 2009 Sewer CIPP Lining Project (CIP 7101637: Sanitary Sewer Lining Program) (CIP 7101289: General Sanitary Sewer Repairs) (CIP 7201066: General Storm Sewer Repairs) INTRODUCTION The purpose of this memo is to recommend adoption of the attached resolution approving the plans, specifications, form of contract and the estimated cost for the 2009 Sewer CIPP Lining Project to be considered at a public hearing. DISCUSSION With age, sanitary sewers deteriorate. Cracks and bad joints form, compromising the integrity of the sewer. In addition, stormwater and groundwater can infiltrate into the sanitary sewer. Both conditions can cause the overloading of the City's sanitary sewer system. The high costs and inconvenience to the public associated with the excavation and restoration of pavement for sanitary sewer rehabilitation projects has led to the development of "trenchless" technologies. Cured-in-Place Pipe (CIPP) is a versatile trenchless method for restoring structural integrity to sewer mains. CIPP is aresin-impregnated tube that is installed in an existing damaged or leaking sewer. Once inserted into the pipe, it is expanded and cured by applying heat. The liner is a seamless, joint-less pipe with a smooth inner surface that increases the flow capacity of the pipe. The seamless pipe also prevents infiltration. Robotic cutters are then used to restore private sewer service connections. The sewers identified for lining as part of the 2009 Sewer CIPP Lining Project are as follows: Location Sewer Diameter Inches Length (Feet) Glen Oak from Vernon St. to Edina St. 8-inch 333 Grove Terrace near 12th St. 8-inch 176 Kirkwood St. from Alta Vista to W. Locust 8-inch 1,676 Fenelon St. (Storm Sewer) 12-inch 50 W. 32"d St. from Wildwood to the east 24-inch 825 TOTAL 3,060 In addition, two brick manholes on Loras Boulevard near Prairie Street will be rehabilitated. In addition to the sanitary sewers to be lined, a small section of storm sewer on Fenelon Street will also be lined as part of the project. RECOMMENDATION I recommend approval of the plans, specifications, form of contract and the estimated cost for the 2009 Sewer CIPP Lining Project. BUDGET IMPACT The cost estimate for the 2007 Sewer CIPP Lining Project is: Estimate Construction $144,440.00 Contingency $ 14,444.00 Engineering $ 23,832.60 Total Project Cost $182,716.60 The project will be funded as follows: CIP Funding Source Amount 7101637 FY 2009 Sanitary Sewer Lining Program $ 69,684.00 7101637 FY 2010 Sanitary Sewer Lining Program $100,000.00 7101289 FY 2010 General Sanitary Sewer Repairs $ 7,346.00 7201066 FY 2010 General Storm Sewer Repairs $ 5,686.60 Total Project Funding $182,716.60 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution approving the plans, specifications, form of contract and the estimated cost for the 2009 Sewer CIPP Lining Project. Prepared by Deron Muehring, Civil Engineer II cc: Jenny Larson, Budget Director Deron Muehring, Civil Engineer II RESOLUTION NO. 397-09 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FR THE 2009 SEWER CIPP LINING PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the 2009 Sewer CIPP Lining Project, in the estimated amount $182,716.60, are hereby approved. Passed, adopted and approved this Stn day of October , 2009; / if. <~ ~/ Roy D. Buol, Mayor Attest: eanne F. Schneider, CMC, City Clerk RESOLUTION NO. APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE 2009 SEWER CIPP LINING PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the 2009 Sewer CIPP Lining Project, in the estimated amount $182,716.60, are hereby approved. Passed, adopted and approved this day of , 2009. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk