Green Alley Project Acceptance_White & Jackson Streets)THE CITY OF Dubuque -~ '' ~' D't "1j'~ ~, AN-AmedcaC~y L,,J 1 r Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Green Alley Pilot Project (11th - 13th between White & Jackson Streets) (CIP 7202044) DATE: October 12, 2009 City Engineer Gus Psihoyos is recommending acceptance of the Green Alley Pilot Project (11th - 13th between White and Jackson Streets), as completed by Portzen Construction, in the final contract amount of $199,966.88 which is a 7.1 % decrease from the original contract in the amount of $215,274.25. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque --... ' ~T '~~ ~ A~-AmedcaCigr ~,J 1 Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer J~ _ DATE: October 9, 2009 SUBJECT: Green Alley Pilot Project (11th - 13th between White & Jackson Streets) (CIP 7202044) INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Green Alley Pilot Project (11th - 13th between White & Jackson Streets). BACKGROUND The Green Alley Pilot Project involved the reconstruction of two existing asphalt alleys from 11th Street to 13th Street between White Street and Jackson Street. Two different pervious pavement surfaces--porous asphalt and interlocking concrete pavers--were used to evaluate suitable pavement types for future assessable alley reconstruction projects. The pavement in the alley between 11th & 12th is high-strength, interlocking concrete pavers. The alley from 12th to 13th streets is porous asphalt. Both pavement surfaces will allow rainfall from low-intensity storms to pass through the pavement structure. This, in turn, will recharge the water table and minimize stormwater runoff. Both alleys have a concrete border around the pervious surface. This concrete border serves as transition pavement from the adjoining driveways to the pervious surface in the alley. At the ends of each alley is a concrete imprint that identifies the alley as a green alley. This will help identify that these alleys are different from conventional alleys. The project also included: reconstruction of sanitary sewer manholes; watermain reconstruction; replacement of private lead services; and the reconnection of copper water services to the watermain. Since this was a pilot project utilizing Community Development Block Grant funding, the project was non-assessable. DISCUSSION The Green Alley Pilot Project (11th - 13th between White & Jackson Streets) was completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $199,966.88, which is a 7.1 % decrease from the original contract in the amount of $215,274.25. RECOMMENDATION I recommend that the City Council accept the improvements and authorize payment of the contract amount of $199,966.88 to Portzen Construction, Inc. of Dubuque, Iowa, for the Green Alley Pilot Project (11th - 13th between White & Jackson Streets). BUDGET IMPACT The estimate of probable costs for the Green Alley Pilot Project (11th - 13th between White & Jackson Streets) is summarized as follows: Award Final Construction Contract $215,274.25 $199,966.88 Contingency 23,903.16 0 Construction Engineering & Inspection 39.440.21 25,947.27 $278.617.62 $225.914.15 The project funding summary is as follows: Fund CIP No. Fund Description Amount 7202044 Green Alley Pilot Program $225,914.15 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract amount of $199,966.88 to Portzen Construction, Inc. for the Green Alley Pilot Project (11th - 13th between White & Jackson Streets). Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Bob Green, Water Department Manager Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor David Harris, Housing & Community Development Director Deron Muehring, Civil Engineer II Michael Kruser, Engineering Technician RESOLUTION NO. 403-09 ACCEPTING THE GREEN ALLEY PILOT PROJECT (11TH - 13TH BETWEEN WHITE & JACKSON STREETS) AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Green Alley Pilot Project (11tH 13th between White & Jackson Streets) (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Green Alley Pilot Project appropriations for the contract amount of $199,966.88 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 19tH day of October ~~pg. Roy D. Buol, Mayor Attest: l ~ /" ~. 1111%-,~ 1~-~?""~~~i'~~//,~ ,~~ eanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE GREEN ALLEY PILOT PROJECT (11TH - 13TH BETWEEN WHITE & JACKSON STREETS) The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Green Alley Pilot Project (11th - 13th between White & Jackson Streets), that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $225,914.15 Dated this 14TH day of October, 2009. Gus Psihoyos City Engineer Filed in the office of the City Clerk on the 14th day of October, 2009 Jeanne F. Schneider, CMC, City Clerk City of Dubuque -Engineering Division FINAL PAYMENT FORM PARTIAL PAYMENT NO: COUNCIL FINAL DATE: October 9, 2009 PROJECT NAME: Green Alley Pilot Project CONTRACTOR: Portzen Construction, Inc. BID ITEM DESCRIPTION EXCAVATION & STONE 1 Remove Pavement 2 Remove Existing Manhole 3 Excavation, Unclassified 4 Select Backfill 5 Bedding and Void Opening Aggregates (ASTM #8 washed stone) 6 Porous Aggregate (ASTM #57 washed stone) 7 Porous Aggregate (ASTM #2 washed stone) 8 Backfill Topsoil CONTRACT AMOUNT: $215,274.25 UNIT UNIT COST ~ O DATE AMO O DATENED SY $4.00 1268.0 $ 5,072.00 Each $500.00 3.0 $ 1,500.00 CY $5.50 612.0 $ 3,366.00 Ton $12.00 745.0 $ 8,940.00 Ton $20.00 31.4 $ 628.40 Ton $19.00 297.0 $ 5,642.62 Ton $24.00 553.4 $ 13,282.08 SY $3.25 162.0 $ 526.50 9 Subbase Granular Material (6" Thick) Ton $15.00 $ - 10 Limestone Curb Removal LF $3.00 48.0 $ 144.00 PAVEMENT 11 Pervious HMA Ton $68.50 139.5 $ 9,552.33 12 PCC Concrete Collar -Standard Concrete SY $45.00 229.8 $ 10,341.90 13 Permeable Concrete Block Pavers SF $5.30 3,122.00 $ 16,546.60 14 HMA 300k Headers, 1/2" (PG 64-22) Ton $95.00 181.0 $ 17,196.90 15 PC Concrete Driveway 6", Remove & Construct SY $50.00 16.10 $ 805.00 16 PC Concrete Sidewalk, 4", Remove & Construct SF $5.50 23.28 $ 128.04 17 PC Concrete Sidewalk, 6", Remove & Construct SF $7.00 53.70 $ 375.90 18 PC Concrete Curb, 2.5', Construct LF $22.00 48.00 $ 1,056.00 19 Geotechnical Fabric SY $4.00 1,381.00 $ 5,524.00 20 Furnish & Install Green Alley Identifier Panel Each $900.00 4.00 $ 3,600.00 21 PC Concrete Access Ramp, Detectable Each $250.00 2.00 $ 500.00 WATER MAIN 22 8" DIP, Class 52 w./Polywrap LF $31.00 667.00 $ 20,677.00 23 Tracer Wire Access Box Each $50.00 1.00 $ 50.00 24 Copper Tracer Wire LF $0.75 675 $ 506.25 25 3/4" Copper Service Line TYPE K LF $15.00 133 $ 1,995.00 26 1 1 /4" Copper Service Line TYPE K LF $28.00 16.00 $ 448.00 27 Water Service Lines Stop Box, Curb Stop, 3/4" Each $175.00 15 $ 2,625.00 28 Fixture Adjustment, Valves 8~ Curb Stops Each $125.00 25 $ 3,125.00 29 Re-tap Existing Water Service (3/4") Each $250.00 14.00 $ 3,500.00 30 Re-tap Existing Water Service (1-114") Each $300.00 2 $ 600.00 31 6" Solid Sleeve Each $175.00 2.00 $ 350.00 32 6" Valve Each $600.00 2.00 $ 1,200.00 33 6" DIP w./Polywrap LF $28.00 58.25 $ 1,631.00 34 8" x 6" Reducer Each $250.00 4.00 $ 1,000.00 35 8" 90 Degree Bend Each $300.00 1.00 $ 300.00 36 8" 45 Degree Bend Each $275.00 1.00 $ 275.00 37 6" x 6" x 6" Anchoring Tee Each $375.00 1.00 $ 375.00 38 8" x 8" x 8" Anchoring Tee Each $450.00 2.00 $ 900.00 39 20" x 20" x 8" Anchoring Tee Each $2,000.00 2.00 $ 4,000.00 40 20" Solid Sleeve Each $850.00 2.00 $ 1,700.00 41 20" DIP, w./Ploywrap LF $80.00 20.10 $ 1,608.00 42 8" Valve Each $850.00 7.00 $ 5,950.00 43 20" Valve MJ Butterfly Each $4,000.00 1.00 $ 4,000.00 44 Valve Box Complete Each $200.00 10.00 $ 2,000.00 SANITARY SEWER 45 8" DIP w./Bedding LF $35.00 19.5 $ 682.50 46 48" Diameter Manhole Base Each $750.00 2.0 $ 1,500.00 47 48" Diameter Manhole Sidewall VF $175.00 30.0 $ 5,250.00 48 Manhole Frame & Cover Each $350.00 2.0 $ 700.00 MISCELLANEOUS 49 Sawcut, Concrete LF $3.00 49.0 $ 147.00 50 Sawcut, Asphalt LF $2.00 327.0 $ 654.00 51 Waterproofing Membrane SF $1.50 418.0 $ 627.00 52 2" Insulation Board SY $8.50 56.5 $ 480.59 53 Sod SY $5.50 107.1 $ 589.27 54 Tree Preservation Measures LS $1,000.00 1.00 $ 1,000.00 55 Dust Control Surface Treatment MGAL $25.00 $ - 56 Erosion Control Plan -Operating Procedures LS $1,500.00 1.00 $ 1,500.00 57 Traffic Control & Safety Control LS $3,000.00 1.00 $ 3,000.00 58 Mobilization LS $4,500.00 1.0 $ 4,500.00 TOTAL AMOUNT EARNED TO DATE: $ 184,173.88 ~: C1 Foundation work around St. John's LS $ 3,750.00 1.00 $ 3,750.00 C2 Epoxy Rebar LF $ 0.75 336.00 $ 252.00 C3 Guardrail Repair LS $ 3,000.00 1.00 $ 3,000.00 C4 One Cube of Pavers LS $ 250.00 1.00 $ 250.00 C5 6" Field Locking Gaskets Each $ 75.00 1.00 $ 75.00 C6 8" Field Locking Gaskets Each $ 100.00 2.00 $ 200.00 C7 6" caps Each $ 125.00 2.00 $ 250.00 C8 8" solid sleeve Each $ 275.00 2.00 $ 550.00 C9 8" 111!4 Degree Bend Each $ 225.00 2.00 $ 450.00 C10 remove gwest vault LS $ 500.00 1.00 $ 500.00 C11 6" Hy-Max Sleeve Each $ 285.00 4.00 $ 1,140.00 C12 Valve Box Extension Each $ 75.00 3.00 $ 225.00 C13 1" Copper Service Line TYPE K LF $ 21.00 15.00 $ 315.00 C14 Re-tap Existing Water Service (1") Each $ 275.00 1.00 $ 275.00 C15 6" Mega Lug Each $ 52.00 5.00 $ 260.00 C16 8" Mega Lug Each $ 61.00 32.00 $ 1,952.00 C17 20" Mega Lug Each $ 254.00 6.00 $ 1,524.00 C18 6" 441 Each $ 235.00 1.00 $ 235.00 C19 6" 442 Each $ 295.00 2 $ 590.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: S 15,793.00 TOTAL AMOUNT EARNED TO DATE: $ 199,966.88 TOTAL DUE CONTRACTOR: $ 199,966.88 ENGINEERING: $25,947.27 TOTAL CONSTRUCTION COST: $225,914.15 TE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen„City ager City of Dub Wa ~~ APPROVED: ~~ ~- Gus Psihoyos, City Engineer City of Dubuque, Iowa TE OF THE CONTRACTOR: The undersigned, contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all cl CONTRACTOR: BY: TITLE: DATE: / rj._ ~ ~'" D /