Loading...
Trolley Line Trail_Eagle Point Park AcceptanceTO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Trolley Line Trail -Eagle Point Park Project (CIP 1001989) DATE: October 12, 2009 City Engineer Gus Psihoyos is recommending acceptance of the Trolley Line Trail - Eagle Point Park Project, as completed by Portzen Construction, in the final contract amount of $203,708.91 and request payment authorization. concur with the recommendation and respectfully request Mayor and City Council approval. Mi ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Dubuque THE CITY OF DUB E ~~ Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer , DATE: October 9, 2009 SUBJECT: Trolley Line Trail -Eagle Point Park Project (CIP 1001989) INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Trolley Line Trail -Eagle Point Park Project. BACKGROUND The Trolley Line Trail, a signed route in the Heritage Trail Riverfront System, is a 1/2 mile long, 10-foot wide paved hike/bike trail. The trail provides a scenic, off-road alternative following an old trolley route roadbed from Shiras Avenue north of the Ham House to the turnaround of Eagle Point Park's main entrance road. Interpretive signs will be incorporated into the trail design. A wayside rest area halfway up the trail has been rough-graded and paved with recycled brick pavers by a boy scout. The Boy Scout is also working on mosaic the art work on three pillars installed near the wayside rest. The art work should be completed later this fall. The following infrastructure items were also installed to accommodate future upgrades: light bases and electrical conduit for trail lighting; conduit for emergency call boxes; a short water extension; and storm sewer improvements. DISCUSSION The Trolley Line Trail - Eagle Point Park Project was completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $203,708.91, which is a 0.7% increase from the original contract in the amount of $202,216.00. This project had an additional 400 feet of trail installed to make the connection to the Ham House Parking Lot. Since stabilizing stone did not need to be used for this project, the savings was used for the cost of the additional trail length. The Boy Scout project with the wayside rest is essentially complete. RECOMMENDATION I recommend that the City Council accept the improvements and authorize payment of the contract amount of $203,708.91 to Portzen Construction, Inc. of Dubuque, Iowa, for the Trolley Line Trail -Eagle Point Park Project. BUDGET IMPACT The estimate of probable costs for the Trolley Line Trail -Eagle Point Park Project is summarized as follows: Award Final Construction Contract $202,216.00 $203,708.91 Contingency 19,154.94 0 Construction Engineering & Inspection 31,605.65 35,132.00 The project funding summary is as follows: Fund CIP No. Fund Description Amount 1001989 Fiscal Year 2008 Resource Enhancement and Protection (REAP) Grant $200,000.00 7401405 Water Main Replacement Program 3,036.91 1011549 Street Light Replacement 35.804.00 $238.840.91 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract amount of $203,708.91 to Portzen Construction, Inc. for the Trolley Line Trail -Eagle Point Park Project. Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Laura Carstens, Planning Services Manager Gil Spence, Leisure Services Manager Bob Green, Water Department Manager Bob Schiesl, Assistant City Engineer RESOLUTION NO. 404-09 ACCEPTING THE TROLLEY LINE TRAIL - EAGLE PONIT PARK PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Trolley Line Trail -Eagle Point Park Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Fiscal Year 2008 Resource Enhancement and Protection (REAP) Grant, Water Main Replacement Program and Street Light Replacement appropriations for the contract amount of $203,708.91 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 19th day of Atte t: -o~~~~~ eanne F. Schneider, CMC, City Clerk October 2009. G; ~,~ ~ ,u if Roy D. Buol, Mayor CITY ENGINEERS CERTIFICATE OF FINAL COMPLETION OF THE TROLLYE LINE TRAIL - EAGLE POINT PARK PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Trolley Line Trail -Eagle Point Park Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $238,840.91. Dated this 14th day of October, 2009. Gus Psihoyos City Engineer Filed in the office of the City Clerk on the City Clerk on the 14th day of October, 2009 Jeanne F. Schneider, CMC, City Clerk City of Dubuque -Engineering Division COUNCIL FINAL PAYMENT FORM PARTIAL PAYMENT NO: COUNCIL FINAL DATE: October 5, 2009 PROJECT NAME: Trolley Line Trail Project -Eagle Point Park CONTRACTOR: Portzen Construction, Inc. CONTRACT AMOUNT: $202,216.00 CONT UNIT Q NED ~O BID ITEM DESCRIPTION UNIT gUANTITY COST O DATE TO DDATE EXCAVATION & STONE 1 Excavation, Unclass~ed CY 1000.00 $5.00 1135.0 $ 5,675.00 2 Backfill, Topsoil Remove, Salvage & Re-use SY 3000.00 $3.25 3191.0 $ 10,370.75 3 Graded Stone Base Ton 1386.00 $12.00 1,219.9 $ 14,638.80 4 3" Breaker Stone -Stabilization Stone Ton 941.00 $12.00 $ 5 Clearing & Grubbing LS 1.00 $2,000.00 1.0 $ 2,000.00 6 Sand Ton 15.00 $20.00 9.0 $ 180.00 7 Stone Reventment Riprap - 3" - 6" Tan 130.00 $15.00 97.9 $ 1 468.50 , PAVEMENT 8 HMA 300k Binder Course, 1/2" (PG 64-22) Ton 345.00 $67.00 $ 9 HMA 300k Surface Course, 1/2" (PG 64-22) Ton 345.00 $67.00 $ 10 Brick Paver Mobilization LS 1.00 $500.00 1.00 $ 500.00 WATER MAIN 11 6" DIP, Class 52 w./Polvwrap LF 30.00 $32.00 48.50 $ 1,552.00 12 6" Valve MJ w/Box Each 1.00 $800.00 1.00 $ 800.00 13 Hydrant MJ Each 1.00 $2,000.00 1 $ 2,000.00 14 6"x6"x6" Anchoring Tee MJ Each 1.00 $325.00 1 $ 325.00 15 Tracer Wire Access Box Each 1.00 $50.00 1.00 $ 50.00 16 Copper Tracer Wire LF 40.00 $1.00 59 $ 59.00 STORM SEWER 17 Storm Sewer, 18" HDPE Smooth Walled Pipe LF 65 $21.00 67.5 $ 1,417.50 18 Storm Sewer, 24" HDPE Smooth Walled Pipe LF 57 $31.00 60.0 $ 1,860.00 19 Storm Sewer, 15" RCP, CL III LF 4 $40.00 3.5 $ 140.00 20 Storm Sewer, 15" Flared End Section, RCP Each 1 $550.00 1.0 $ 550.00 21 Storm Sewer, 18" Flared End Section, HDPE Each 5 $250.00 3.0 $ 750.00 22 Storm Sewer, 24" Flared End Section, HDPE Each 1 $300.00 1.0 $ 300.00 23 Intake 101-B Each 1 $1,600.00 1.0 $ 1,600.00 24 24" dia. Preformed Storm Structure, Nyoplast or equal Each 1 $1,200.00 1.0 $ 1,200.00 ELECTRICAL 25 2" Sch 4p PVC Conduit -Trenched LF 3532 $6.00 3584.0 $ 21,504.00 26 Electrical Controller Precast Foundation Each 1 $1,000.00 1.0 $ 1,000.00 27 Precast Concrete Light Foundation - Furnish & Install Each 19 $700.00 19.0 $ 13,300.00 MISCELLANEOUS 28 Seed SY 3500.00 $1.10 3191.0 $ 3,510.10 29 Erosion Mat SY 600 $1.85 107.1 $ 198.14 30 Limestone Seat Wall, 24" High LF 50 $63.00 48.5 $ 3,055.50 31 Traffic Guard Hinged Bollard w/Foundation Each 1 $1,000.00 1.0 $ 1,000.00 32 Signs Each 10.00 $125.00 3.0 $ 375.00 33 Geotextile SY 300.00 $4.00 196.7 $ 786.80 34 Chain Link Fence LF 300.00 $23.00 205.7 $ 4,731.10 35 Pavement Markings - TexUSymbols Each 6.00 $110.00 $ 36 Pavement Markings -Linear LF 613.00 $1.00 $ 37 Tree Preservation LS 1.00 $1,000.00 1.0 $ 1,000.00 36 Erosion Control Plan -Operating Procedures LS 1.00 $1,000.00 1.00 $ 1,000.00 39 Traffic Control & Safety Control LS 1.00 $550.00 1.00 $ 550.00 40 Mobilization LS 1.00 $5,200.00 1.0 $ 5 200 00 , . ALTERNATEI Al PC Concrete Pavement, (5") Class "C" SY 2710.00 $25.00 3070.2 $ 76,755.00 A2 HMA 300k Binder Course 112" (PG 64-22) -DELETE Ton -345.00 $67.00 $ A3 HMA 300k Surface Course 1/2" (PG 6422) -DELETE Ton -345.00 $67.00 $ ALTERNATE 2 A4 Bench Each 5 $1,200.00 5.0 $ 6,000.00 AS Trash Receptacle Each 4 $900.00 4.0 $ 3,600.00 City of Dubuque -Engineering Division COUNCIL FINAL PAYMENT FORM PARTIAL PAYMENT NO: COUNCIL FINAL PROJECT NAME: Trolley Line Trail Project -Eagle Point Park DATE: October 5, 2009 Backfill, Limestone Tan 142.81 $ 6.00 142.81 $ 856.86 Water Main, Y2-5 Yard Hydrant, 1" Installed Complete EA 1.00 $ 750.00 1.00 $ 750.00 Water Main, 6" Solid Sleeve EA 1.00 $ 150.00 1.00 $ 150.00 Water Main, 6" Gripper Gasket EA 2.00 $ 54.00 2.00 $ 108.00 Water Main, Copper Service, 1" LF 7.00 $ 25.00 7.00 $ 175.00 Water Main, Curb Stop, 1" EA 1.00 $ 250.00 1.00 $ 250.00 Water Main, Corp 1" EA 1.00 $ 400.00 1.00 $ 400.00 Trash Grate, Install ~ Storm Sewer #4 15" RCP EA 1.00 $ 800.00 1.00 $ 800.00 PCC Curb & Gutter R&R, Shiras Ave. Sta.5+00 S.Gate Dr Sta.22+78 LF 26.20 $ 22.00 26.20 $ 576.40 HMA, Hand Patch Ton 3.80 $ 125.00 3.80 $ 475.00 PCC Foundations 3 Each, far Boy Scouts LS 1.00 $ 1,400.00 1.00 $ 1,400.00 2" Sch 40 PVC Conduit -Trenched (PORTZEN Installed) LF 20.00 $ 6.00 20.00 $ 120.00 Quazite Hand Hole 8" X 20" EA 1.00 $ 370.00 1.00 $ 370.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 10 744.72 TOTAL AMOUNT EARNED TO DATE: $ 203 708.91 TOTAL DUE CONTRACTOR: $ 203 708.91 ENGINEERING: $ 35132.00 TOTAL CONSTRUCTION COST: $ 238 840.91 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen City of Dubin, a APPROVED: %~ ~L '~ Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR The undersigned, Portzen Construction, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as[~f/y/~ settle ent for all claims for said improve ent. CONTRACTOR: /-i4.i, ~"~' j BY: TITLE: /')~ _ DATE: I/ ~7