Loading...
Signed Contracts_Thomas Place Guardrail, Curb, Gutter InstallationTHE CITY QF Dubuque -. DUB E "°~'~~~~ Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Thomas Place Guardrail and Curb & Gutter Installation Project CIPs 3001027 & 3501041 DATE: October 12, 2009 Through the competitive quotation process for public improvements, the Thomas Place Guardrail and Curb and Gutter Installation Project was awarded on October 8, 2009, to Drew Cook & Sons Excavating Co., Inc., in the amount of $39,255, which was 36.37% over the engineer's estimate. City Engineer Gus Psihoyos recommends that the award for the Thomas Place Guardrail and Curb and Gutter Project be officially recorded in the minutes of the City Council I concur with the recommendation and respectfully request Mayor and City Council approval. M' hael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer TH6 CITY OF ~~ I~~~.. ~~ Masterpiece on the Mississzppi TO: Michael C. Van Milligen, City Mang r FROM: Gus Psihoyos, City Engineer DATE: October 12, 2009 Dubuque ~~ I~~I~ 200 SUBJECT: Thomas Place Guardrail and Curb & Gutter Installation Project CIPs 3001027 & 3501041 The Thomas Place Guardrail and Curb & Gutter Installation Project provides for the removal and replacement of approximately 270 square yards of existing asphalt pavement, the installation of approximately 275 feet of curb and gutter, and the installation of guardrail along the east side (between 907 and 915) Thomas Place. The following is a summary of the bids received: Drew Cook & Sons Excavating Co., Inc. $39,255.00 Arensdorf Excavating, Inc. $40,185.50 Tschiggfrie Excavating, Inc. $40,779.00 Through the competitive quotation process for public improvements, this project was awarded on October 8, 2009, to Drew Cook & Sons Excavating Co., Inc. in the amount of $39,255.00. This is 33.59% over the engineer's estimate. The additional funding needed for the project will be taken from CIP 3001027 (Guardrail Replacement). The variance between the award and engineer's estimate are twofold: 1) The engineer's estimate was based on historical costs for guardrail, most recently last year's guardrail installation project along St. Mary's Street. The St. Mary's guardrail cost was $24/lineal foot. All the bidders for Thomas Place used essentially the same sub- contractor for the guardrail installation with the submitted bid price of $34/lineal foot. 2) Since there are very few guardrail contractors in this area, the competition is limited for this type of work. In accordance with the competitive quotation requirements of Iowa Code, Section 26.14, it is necessary that the award for the Thomas Place Guardrail and Curb & Gutter Installation Project to be officially recorded in the minutes of the City Council. cc: Jon Dienst, PE CITY OF DUBUQUE -ENGINEERING DNISION -BID TABULATION SHEET TABULATION FOR: THOMAS PLACE CURB 3 GUTTER BID DATE: October 8, 2009 BIDDER: Drew Cook 8 Sons Excavating BIDDER: ArensEOA Excavating, Inc. BIDDER: Tscnigghie Excavating. Inc. BID ITEM DESCRIPTION I I UNIT I QUANTITYI UNIT PRICE ESTIMATE PRICE UNIT PRICE BID PRICE UNIT COST TOTAL COST UNIT COST TOTAL COST BASE BID: EXCAVATION b STONE.. 1 Pavement Removal SY 270.00 5.50 $1.485.00 $5.00 $1.350.00 $3.00 $810.00 $5.00 $1,350.00 2 Excavation (UnGassifiedl CY 45.00 5.50 $247.50 $25.00 $1.125.00 $3.50 $157.50 $10.00 $450.00 3 Backfill Topsoil SY 67.00 3.50 $234.50 $25.00 $1.675.00 $5.00 $335.00 $10.00 $670.00 4 Remove 6dstln0 Cade GuaMeretl & Pbe ReYing/POS1s LF 300.00 2.00 $600.00 _ $3.00 _ $900.00 $2.00 $600.00 $5.00 $1.500.00 STONE ~ pAVEANENT 5 Graded Stone Base. 3/4" Ton 30.00 12.00 $360.00 $25.00 $750.00 $13.00 $390.00 $15.00 $450.00 6 HMA 300k Surface Course. 1/2" (PG 64-221 Ton 48.00 90.00 $4.320.00 $110.00 $5.280.00 $60.00 $3.840.00 $105.00 $5.040.00 7 HMA300kBinderCourse.lf2"lPG64-221 Ton 38.00 90.00 $3.240.00 $110.00 $3.960.00 $80.00 $2.880.00 $105.00 $3.780.00 8 PC Concrete Curb 8 Gutter. 2.5' Construct LF 274.00 16.00 $4.384.00 $15.50 _ $4.247.00 $27.00 $7.398.00 _ $16.50 $4,521.00 MISCEtiLANlOUS 9 Seeding. Mulching, and Watering SY 67.00 2.00 $134.00 $4.00 $268.00 $5.00 $335.00 $4.00 $268.00 10 Guardraillnstallafion LF 510.00 23.00 $11.730.00 $34.00 $17.340.00 $35.00 $17.850.00 $35.00 $17,850.00 11 Sawcut Pavement -Regardless of Type LF 180.00 2.50 $450.1x1 $2.00 _ $360.00 $3.00 $540.00 $5.1~ $900.00 12 Erosion Control Plan -Operating Procedures LS 1.00 500.00 $500.00 _ $400.00 $400.00 $1.500.00 $1,500.00 $200.00 $200.00 13 Traffic Control and Safety Control LS 1.00 500.00 $500.00 $500.00 _ $500.00 $750.00 $750.00 $300.00 $300.00 14 MobiGzatbn LS 1.00 1200.00 $1.200.00 $1.100.00 $1.100.00 $2.800.00 $2,800.00 $3,500.00 $3.500.00 TOTAL BASE BID ata son-rotor 1539,255.00 I Bld sutrTotal I $40,185.50 ~ era sun-7omr I $40,779.00 J Engineer's Cost Estimate 29,385.00 % Under/Over I 33.59% ~ % Under/Over I 36.76 % ~ % Under/Over I 38.77 % J