Louise Lane Bridge Reconstruction Project_Acceptance2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Louise Lane Bridge Reconstruction Project CIP No. 2501020 DATE: October 23, 2009 The Louise Lane Bridge Reconstruction Project was completed by Jim Schroeder Construction, Inc. of Bellevue, Iowa in the final contract amount of $215,630.30 which is a 3.0% increase from the original contract in the amount of $209,315.52. City Engineer Gus Psihoyos is recommending that the City Council accept the improvements and authorize payment of the contract amount of $215,630.30 to Jim Schroeder Construction, Inc. of Bellevue, Iowa for the Louise Lane Bridge Reconstruction Project. I concur with the recommendation and respectfully request Mayor and City Council approval. ~-- Michael C. Van Milligen MCVM:Iw Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CTTY OF Dub~uq,..u.~e AN-an'~i.~i: DUB E ~ t Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer ~~ . , DATE: October 23, 2009 SUBJECT: Louise Lane Bridge Reconstruction Project CIP No. 2501020 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Louise Lane Bridge Reconstruction Project. BACKGROUND The Louise Lane Bridge Reconstruction Project provided for the replacement of the previously narrow, single lane bridge, which was geometrically and structurally obsolete and was posted at 10-ton maximum load. The new replacement structure is atriple-chamber box concrete culvert and provides two directional lanes of traffic that serves as the only access to the Louise Lane and Monroe Avenue area. DISCUSSION The Louise Lane Bridge Reconstruction Project was completed by Jim Schroeder Construction, Inc. of Bellevue, Iowa, in the final contract amount of $215,630.30, which is a 3.0% increase from the original contract in the amount of $209,315.52. RECOMMENDATION I recommend that the City Council accept the improvements and authorize payment of the contract amount of $215,630.30 to Jim Schroeder Construction, Inc. of Bellevue, Iowa, for the Louise Lane Bridge Reconstruction Project. PROJECT COST -BUDGET IMPACT The estimate of probable costs for the Louise Lane Bridge Reconstruction Project is summarized as follows: Award Final Construction Contract $ 209,315.52 $215,630.30 Contingency 20,931.55 0 Right-of-Way Acquisition 13,191.00 13,191.00 Engineering Design 42,000.00 29,227.25 Construction Engineering & Inspection 26,000.00 15,706.62 $311438.07 $273,805.17 The project funding summary is as follows: CIP Fund Description Fund Amount 2501020 Louise Lane Bridge Reconstruction $273,805.17 Total Project Funding $273,805.17 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution accepting the improvements and authorizing payment of the contract amount of $215,630.30 to Jim Schroeder Construction, Inc. for the Louise Lane Bridge Reconstruction Project. Prepared by Robert Schiesl, PE, Assistant City Engineer cc: Jenny Larson, Budget Director Bob Green, Water Department Manager Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Dennis Waugh, IIW Engineers & Surveying, PC RESOLUTION NO. 428-09 ACCEPTING THE LOUISE LANE BRIDGE RECONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Louise . Lane Bridge Reconstruction Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Louise Lane Bridge Reconstruction Capital Improvement Project appropriation for the contract amount of $215,630.30 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 2nd day of November 2009. x -~ ~~ ~a ,~' ~,/aRoy D. Buol, Mayor 4 At est: ~ _--~- , ~ C eanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE LOUISE LANE BRIDGE RECONSTRUCTION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Louise Lane Bridge Reconstruction Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $273,805.17. Filed in the office of the City Clerk on the.23rd day of October, 2009, Gus Psihoyos City Engineer Jeanne F. Schneider, CMC, City Clerk City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL DATE: October 20, 2009 PROJECT NAME: LOUISE LANE BRIDGE RECONSTRUCTION PROJECT CONTRACTOR: Jim Schroeder Constructlon, Inc. CONTRACT AMOUNT: $209,315.52 FINA NT L BID ITEM DESCRIPTION UNIT UN T OST QUANTITY E ARNED BASE BID 1 MOBILIZATION AND MISCELLANEOUS LS $ 18,500.00 1.00 $ 18,500.00 2 EROSION CONTROL LS $ 500.00 $ _ 3 SAFETY CLOSURE EACH $ 240.00 1.0 $ 240.00 4 TRAFFIC CONTROL LS $ 2,700.00 1.00 $ 2,700.00 5 STRIPPING, SALVAGING, STOCKPILING, AND SPREADING TOPSOIL CY $ 5.30 226.0 $ 1,197.80 6 REMOVAL OF PAVEMENT SY $ 3.00 291.0 $ 873.00 7 REMOVAL OF EXISTING BRIDGE LS $ 3,000.00 1.0 $ 3,000.00 8 REMOVAL OF GUARDRAIL LF $ 3.00 118.9 $ 356.70 9 SAW EXISTING CURB TO CREATE DROP CURB LF $ 13.00 43.0 $ 559.00 10 EXCAVATION, CLASS 10, ROADWAY & BORROW CY $ 6.25 380.0 $ 2,375.00 11 EXCAVATION, CLASS 23 CY $ 12.00 604.0 $ 7,248.00 12 STRUCTURAL CONCRETE (CULVER77 CY $ 384.00 173.6 $ 66,662.40 13 REINFORCING STEEL, EPOXY COATED LB $ 0.81 25,677.0 $ 20,798.37 14 PLOWABLE MORTAR CY $ 76.25 $ 15 ENGINEERING FABRIC SY $ 2.25 301.0 $ 677.25 16 REVETMENT, CLASS E, RIPRAP TON $ 23.85 187.41 $ 4,469.73 17 GRADED STONE BASE TON $ 14.70 206.75 $ 3,039.23 18 BRIDGE APPROACH SECTION SY $ 152.00 108.54 $ 16,498.08 19 HMA, BINDER COURSE, 3/4 IN. MIX TON $ 92.00 67.21 $ 6,183.32 20 HMA, SURFACE COURSE, 1/2 IN. MIX TON $ 92.00 42.30 $ 3,691.60 21 CURB AND GUTTER, P.C. CONCRETE, 2.5 FT. LF $ 32.00 $ _ 22 CONCRETE OPEN RAILING, TL 4 LF $ 67.00 66.0 $ 4,422.00 23 CONCRETE BARRIER, APPROACH, RE-46 (MODIFIED) EACH $ 1,000.00 4.0 $ 4,000.00 24 INSTALLATION OF GUARDRAIL LF $ 50.00 102.0 $ 5,100.00 25 GUARDRAIL, END ANCHORAGE, BEAM, RE-33A EACH $ 2,600.00 2.0 $ 5,200.00 26 SEEDING AND FERTILIZING (URBAN) ACRES $ 2,000.00 0.2 $ 400.00 27 MULCHING ACRES $ 2,000.00 0.2 $ 400.00 STORM SEWER 28 SELECT TRENCH BACKFILL (STORM) LF $ 13.00 53.5 $ 695.50 29 INTAKE, 101C EACH $ 85.00 2.0 $ 170.00 30 18" RCP, CLASS IV LF $ 47.60 53.5 $ 2,546.60 SANITARY SEWER 31 8" DIP SANITARY SEWER, CL 50/350 LF $ 69.80 36.0 $ 2,512.80 32 CONNECTION TO EXISTING SANITARY SEWER W/FLEX. COUPLING EA $ 85.00 1.0 $ 85.00 33 CONNECTION TO EXISTING MANHOLE EA $ 620.00 1.0 $ 620.00 34 SELECT TRENCH BACKFILL (SANITARY) LF $ 14.70 20.0 $ 294.00 35 INSULATING SEWER CROSSING LS $ 1,625.00 1.0 $ 1,625.00 WATER MAIN 36 8" DIP WATER MAIN CL 52 W/TRACER 1MRE & POLYWRAP LF $ 41.85 84.0 $ 3,515.40 37 6" DIP WATER MAIN CL 52/TRACER WIRE & POLYWRAP LF $ 37.10 35.5 $ 1,317.05 38 6" DIP HYDRANT LEAD CL 50 WIfRACER WIRE & POLYWRAP LF $ 37.10 7.5 $ 278.25 39 8" RS GATE VALVE WITH BOX EA $ 975.00 1.0 $ 975.00 40 6" RS GATE VALVE WITH BOX EA $ 725.00 3.0 $ 2,175.00 41 6" RS GATE VALVE WITH BOX, REMOVE AND RE-INSTALL EA $ 370.00 1.0 $ 370.00 42 FIRE HYDRANT, FURNISH AND INSTALL EA $ 2,025.00 1.0 $ 2,025.00 43 FIRE HYDRANT, REMOVE AND RE-INSTALL EA $ 625 00 1.0 $ 625.00 44 TRACER WIRE TERMINAL BOX EA $ 55.00 2.0 $ 110.00 45 SELECT TRENCH BACKFILL (WATER MAIN) LF $ 9.50 143.0 $ 1,358.50 46 WATER MAIN OFFSET AT SEWER CROSSING (LABOR) EA $ 600.00 $ _ 47 CONNECTION TO EXISTING WATER MAIN " EA $ 550.00 2.0 $ 1,100.00 48 8 XB" MJ TEE (79 LBS EACH) EA $ 292.00 2.0 $ 584.00 49 6"X6" MJ TEE (66 LBS EACH) EA $ 195.00 1.0 $ 195 00 50 8" MJ 11-1/4 DEGREE BEND (45 LBS EACH) EA $ 140.00 1.0 $ . 140.00 51 6" MJ 90 DEGREE BEND (49 LBS EACH) EA $ 140.00 $ _ 52 6" MJ 22-1/2 DEGREE BEND (31 LBS EACH) EA $ 120.00 $ _ 53 6" MJ 11-1/4 DEGREE BEND (29 LBS EACH) EA 54 6" MJ COUPLING (28 LBS EACH) EA 55 8"X6" PE-PE REDUCER (30 LBS EACH) EA 56 8" MJ PLUG (25 LBS EACH) EA 57 MECHANICAL JOINT RESTRAINT FOR 8" DIP (MEGALUG SERIES 1108) EA 56 _MECHANICAL JOINT RESTRAINT FOR 6" DIP (MEGALUG SERIES 1106) EA 59 PUSH ON JOINT RESTRAINT FOR 8" DIP (FIELD LOK 350) F_,o, 60 PUSH ON JOINT RESTRAINT FOR 6" DIP (FIELD LOK 350) EA $ 120.00 $ _ $ 110.00 $ $ 110.00 1.0 $ 110.00 $ 200.00 1.0 $ 200.00 $ 56.00 7.0 $ 392.00 $ 7.00 6.0 $ 42.00 $ 90.00 1.0 $ 90.00 $ 75.00 1.0 $ 75.00 TOTAL AMOUNT EARNED TO DATE: $ 203,017.57 CHANGE ORDER S -EXTRA WORK ITEMS 61 STONE BACKFILL, 1"CLEAN TON $ 20.00 161.16 $ 3 223 20 62 SUBGRADE STABILIZATION, 3" STONE TON $ 19 00 74 52 $ , . 1 415 63 STORM SEWER, 10" HDPE LF $ . 23 70 . , .88 64 EROSION CONTROL MAT . 104.50 $ 2,476.65 65 FIXTURE ADJUSTMENT SF $ 0.30 640.00 $ 192.00 66 W-BEAM GUARDRAIL NEW EA $ 350.00 3.0 $ 1,050.00 67 , INTAKE 101C LF $ 10.00 62.50 $ 625.00 , EACH $ 1,815.00 2.0 $ 3,630.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: 5 12,612.73 TOTAL AMOUNT EARNED TO DATE: E 215,630.30 TOTAL DUE CONTRACTOR: $ 215,630.30 RIGHT-OF-WAY ACQUISITION: $ 13,191.00 ENGINEERING DESIGN SERVICES: $ 29,277.25 CONSTRUCTION ENGINEERING & INSPECTION: S 15,706.62 TOTAL CONSTRUCTION COST: $ 273,805.17 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milli ity Manag City of [luCSu Iowa APPROVED:~___.-~ ~ Gus Psihoyos, City Engineer Ciry of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Jim Schroeder Construction, Inc contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: Jim chroed Construction, Inc. BY: ~. TITLE: PZ'eS1d0Ilt DATE: 10-22-09