Loading...
Floodwall Levee slope Stabilization ProjectTHE CITY OF Dubuque -..., DUB E AII-Americal~lt Masterpiece an the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Floodwall Levee Slope Stabilization Project Capital Improvement Project #1002042 DATE: November 6, 2009 Public Works Director Don Vogt is recommending acceptance of the Floodwall Levee Slope Stabilization Project, as completed by Eastern Iowa Excavating and Concrete LLC, in the final contract amount of $224,617.91, which is a 22.68% increase from the original contract amount of $183,087.50. The increased cost of this project was due to additional repairs being required on a longer section of shoreline than originally planned and specified. I concur with the recommendation and respectfully request Mayor and City Council approval. Mich el C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Don Vogt, Public Works Director THE CITY OF Dubuque T TR la.~d D 1-..J L E All-AmericaC~iY I Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Manager FROM: Don Vogt, Public Works Director SUBJECT: Floodwall Levee Slope Stabilization Project Capital Improvement Project # 1002042 DATE: November 5, 2009 INTRODUCTION The attached resolution provides for the acceptance of the construction contract for the Floodwall Levee Slope Stabilization Project. DISCUSSION Work has been completed on the project by Eastern Iowa Excavating and Concrete LLC, of Cascade, Iowa in the final contract amount of $224,617.91. I am recommending that the City Council accept the improvements and establish the final contract price at $224,617.91, which is a 22.68% increase from the original contract amount of $183,087.50. The increased cost of this project was due to additional repairs being required on a longer section of shoreline than originally planned and specified. This project expense overage was previously addressed in my October 9t" memo to you, which was provided to the City Council at its October 19t" meeting. PROJECT COST -BUDGET IMPACT A cost summary of the project is as follows: Estimate Award Final Construction Contract $272,460.00 $183,087.50 $224,617.91 Contingency $ 27,246.00 $ 18,308.75 ~ $ .00 Engineering $ 14,032.00 $ 14,032.00 $ 19,038.50 Total $313,738.00 $ 215,428.25 $ 243,656.41 The project funding summary is as follows: CIP No. Fund Description Amount 1002042 Floodwall Levee Slope Stabilization Project $215,428.25 3501445 Floodwall Post Flood Repair Project $ 28,228.16 $243.656.41 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution accepting the improvements and establishing the final contract amount. Attachment RESOLUTION NO. 438-09 ACCEPTING THE FLOODWALL LEVEE SLOPE STABILIZATION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Floodwall Levee Slope Stabilization Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the General Fund appropriation for the contract amount of $224,617.91 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 16th day of November, 2009. ~ ~~ Roy . Buol, Mayor Attest: eanne F. Schneider, CMC, City Clerk